Accurate Energetic Systems, LLC: OSHA inspection records
Data as of November 16, 2026
$3,133,900initial (proposed) penalties
100 alleged violation items across 1 cited inspection in the last 12 months, including 59 willful, 4 repeat, 32 serious.
Status1 contestedinspection status per the public record
Get Tennessee alerts- Location
- 5891 Highway 230 W., Mc Ewen, TN 37101
- Industry
- Manufacturing (NAICS 325920, Other Chemical Product and Preparation Manufacturing)
- Jurisdiction
- Tennessee, State plan
- Cited inspections
- 1 in the last 12 months
- Inspection history
- Inspected 2 times since 2019; 2 of those inspections had citations; 63 alleged willful or repeat items on record.
Alleged violations. Citations issued by a State Plan office. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
Inspection 348557646
Contested Under contest; not a final finding. Items and penalties may change.
- Opened
- October 10, 2025
- Citations issued
- April 7, 2026
- Abatement due
- April 17, 2026 to May 7, 2026 (per OSHA record)
- Contest date
- April 27, 2026 (per OSHA record)
- Official record
- osha.gov inspection detail #348557646 · OSHA Establishment Search (if osha.gov shows its homepage, search inspection 348557646)
| Citation | Standard | Type | Issued | Abatement due | Initial penalty | Current penalty | Status |
|---|---|---|---|---|---|---|---|
| Citation 01001 | 1910.22(a)(1) Walking-Working Surfaces | Serious | Apr 7, 2026 | May 7, 2026 | $7,000 | $7,000 | Contested |
| Citation 01002 | 1910.106(e)(6)(i) Flammable Liquids | Serious | Apr 7, 2026 | May 7, 2026 | $5,400 | $5,400 | Contested |
| Citation 01003 | 1910.119(c)(1) Process Safety Management | Serious | Apr 7, 2026 | May 7, 2026 | $7,000 | $7,000 | Contested |
| Citation 01004 | 1910.119(d)(2)(i)(A) Process Safety Management | Serious | Apr 7, 2026 | May 7, 2026 | $7,000 | $7,000 | Contested |
| Citation 01005A | 1910.119(d)(3)(i)(C) Process Safety Management | Serious | Apr 7, 2026 | May 7, 2026 | $7,000 | $7,000 | Contested |
| Citation 01005B | 1910.307(b) Hazardous Locations | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01006 | 1910.119(d)(3)(i)(E) Process Safety Management | Serious | Apr 7, 2026 | May 7, 2026 | $7,000 | $7,000 | Contested |
| Citation 01007 | 1910.119(f)(2) Process Safety Management | Serious | Apr 7, 2026 | May 7, 2026 | $7,000 | $7,000 | Contested |
| Citation 01008 | 1910.119(f)(4) Process Safety Management | Serious | Apr 7, 2026 | May 7, 2026 | $7,000 | $7,000 | Contested |
| Citation 01009A | 1910.119(g)(1)(i) Process Safety Management | Serious | Apr 7, 2026 | May 7, 2026 | $7,000 | $7,000 | Contested |
| Citation 01009B | 1910.119(g)(3) Process Safety Management | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01010 | 1910.119(n) Process Safety Management | Serious | Apr 7, 2026 | May 7, 2026 | $5,400 | $5,400 | Contested |
| Citation 01011A | 1910.132(f)(1)(ii) PPE General Requirements | Serious | Apr 7, 2026 | May 7, 2026 | $5,400 | $5,400 | Contested |
| Citation 01011B | 1910.132(f)(1)(iii) PPE General Requirements | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01012A | 1910.134(g)(1)(i)(A) Respiratory Protection | Serious | Apr 7, 2026 | May 7, 2026 | $2,100 | $2,100 | Contested |
| Citation 01012B | 1910.134(g)(1)(iii) Respiratory Protection | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01012C | 1910.134(h)(1) Respiratory Protection | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01012D | 1910.134(k)(1)(i) Respiratory Protection | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01012E | 1910.134(k)(1)(v) Respiratory Protection | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01012F | 1910.134(m)(2)(i)(C) Respiratory Protection | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01013A | 1910.147(c)(4)(i) Lockout/Tagout | Serious | Apr 7, 2026 | May 7, 2026 | $5,400 | $5,400 | Contested |
| Citation 01013B | 1910.147(c)(6)(i) Lockout/Tagout | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01014A | 1910.1030(g)(2)(i) Bloodborne Pathogens | Serious | Apr 7, 2026 | May 7, 2026 | $2,800 | $2,800 | Contested |
| Citation 01014B | 1910.1030(g)(2)(iv) Bloodborne Pathogens | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01014C | 1910.1030(g)(2)(viii) Bloodborne Pathogens | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01014D | 1910.1030(h)(2)(i)(C) Bloodborne Pathogens | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01015A | 1910.1200(e)(1)(ii) Hazard Communication | Serious | Apr 7, 2026 | May 7, 2026 | $5,400 | $5,400 | Contested |
| Citation 01015B | 1910.1200(f)(2) Hazard Communication | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01015C | 1910.1200(f)(6) Hazard Communication | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01015D | 1910.1200(f)(7) Hazard Communication | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01015E | 1910.1200(f)(11) Hazard Communication | Serious | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 01016 | 1910.1200(h)(1) Hazard Communication | Serious | Apr 7, 2026 | May 7, 2026 | $5,400 | $5,400 | Contested |
| Citation 02001 | TCA 50-3-105(1) | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02002 | 1910.119(d)(1)(i) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02003 | 1910.119(d)(1)(iii) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02004 | 1910.119(d)(2)(i)(D) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02005 | 1910.119(d)(2)(i)(E) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02006 | 1910.119(d)(3)(i)(A) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02007 | 1910.119(d)(3)(i)(B) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02008A | 1910.119(d)(3)(i)(F) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02008B | 1910.119(d)(3)(ii) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 02009 | 1910.119(e)(1) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02010 | 1910.119(e)(3)(i) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02011 | 1910.119(e)(3)(iv) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02012 | 1910.119(e)(3)(v) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02013 | 1910.119(e)(3)(vi) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02014 | 1910.119(e)(5) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02015 | 1910.119(e)(6) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02016 | 1910.119(f)(1) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02017A | 1910.119(f)(1)(i)(B) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02017B | 1910.119(f)(1)(i)(D) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 02017C | 1910.119(f)(1)(i)(E) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 02017D | 1910.119(f)(1)(i)(F) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 02018 | 1910.119(f)(1)(ii) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02019 | 1910.119(f)(1)(ii)(A) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02020 | 1910.119(f)(1)(iii)(A) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02021 | 1910.119(f)(1)(iii)(B) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02022 | 1910.119(f)(1)(iii)(C) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02023 | 1910.119(f)(1)(iii)(D) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02024 | 1910.119(f)(3) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02025A | 1910.119(i)(1) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02025B | 1910.119(i)(2)(iii) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 02026 | 1910.119(i)(2)(ii) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02027 | 1910.119(j)(2) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02028 | 1910.119(j)(3) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02029A | 1910.119(j)(4)(ii) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02029B | 1910.119(j)(4)(iv) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 02030 | 1910.119(l)(1) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02031 | 1910.119(l)(2) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02032 | 1910.119(l)(4) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02033 | 1910.119(l)(5) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02034 | 1910.119(m)(1) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02035A | 1910.119(m)(3) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02035B | 1910.119(m)(4) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 02035C | 1910.119(m)(5) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 02036 | 1910.119(o)(1) Process Safety Management | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02037A | 1910.132(d)(1) PPE General Requirements | Willful | Apr 7, 2026 | May 7, 2026 | $54,000 | $54,000 | Contested |
| Citation 02037B | 1910.133(a)(1) Eye & Face Protection | Willful | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 02037C | 1910.133(a)(3) Eye & Face Protection | Willful | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 02037D | 1910.138(a) Hand Protection | Willful | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 02038A | 1910.134(a)(2) Respiratory Protection | Willful | Apr 7, 2026 | May 7, 2026 | $54,000 | $54,000 | Contested |
| Citation 02038B | TDLWD RULE 800-01-01-.07(2)(B)1 | Willful | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 02038C | TDLWD RULE 800-01-01-.07(2)(D) | Willful | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 02039 | 1910.212(a)(3)(ii) Machine Guarding | Willful | Apr 7, 2026 | May 7, 2026 | $54,000 | $54,000 | Contested |
| Citation 02040 | 1910.212(a)(3)(iii) Machine Guarding | Willful | Apr 7, 2026 | May 7, 2026 | $54,000 | $54,000 | Contested |
| Citation 02041 | 1910.219(c)(3) Power Transmission Guarding | Willful | Apr 7, 2026 | May 7, 2026 | $54,000 | $54,000 | Contested |
| Citation 02042A | 1910.1200(d)(1) Hazard Communication | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02042B | 1910.1200(d)(2) Hazard Communication | Willful | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 02042C | 1910.1200(d)(3)(ii) Hazard Communication | Willful | Apr 7, 2026 | May 7, 2026 | $0 | $0 | Contested |
| Citation 02043 | 1910.1200(g)(1) Hazard Communication | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 02044 | 1910.1200(g)(5) Hazard Communication | Willful | Apr 7, 2026 | May 7, 2026 | $70,000 | $70,000 | Contested |
| Citation 03001 | 1910.141(g)(2) Sanitation | Repeat | Apr 7, 2026 | May 7, 2026 | $6,400 | $6,400 | Contested |
| Citation 03002 | 1910.1200(h)(3)(ii) Hazard Communication | Repeat | Apr 7, 2026 | May 7, 2026 | $10,800 | $10,800 | Contested |
| Citation 03003 | 1910.1200(h)(3)(iii) Hazard Communication | Repeat | Apr 7, 2026 | May 7, 2026 | $10,800 | $10,800 | Contested |
| Citation 03004 | TDLWD RULE 800-01-01-.07(2)(B)2 | Repeat | Apr 7, 2026 | May 7, 2026 | $11,200 | $11,200 | Contested |
| Citation 04001 | 1910.136(a) Foot Protection | Other-than-serious | Apr 7, 2026 | May 7, 2026 | $700 | $700 | Contested |
| Citation 04002A | TDLWD RULE 800-01-03-.03(5)(B)3 | Other-than-serious | Apr 7, 2026 | Apr 17, 2026 | $700 | $700 | Contested |
| Citation 04002B | TDLWD RULE 800-01-03-.03(27)(A) | Other-than-serious | Apr 7, 2026 | Apr 17, 2026 | $0 | $0 | Contested |
| Citation 04002C | TDLWD RULE 800-01-03-.03(27)(B)3 | Other-than-serious | Apr 7, 2026 | — | $0 | $0 | Contested |
| Citation 04002D | TDLWD RULE 800-01-03-.05(2)(A) | Other-than-serious | Apr 7, 2026 | — | $0 | $0 | Contested |
Inspection history since 2019
OSHA recorded 2 inspections at this establishment name and ZIP code since 2019, the most recent opened Oct 10, 2025. 2 of them had citations.
Inspections opened per year. Same establishment name and ZIP code in DOL's full inspection history; different spellings or addresses of one business are not joined.
| Inspection | Opened | Alleged items | Initial penalty | Source |
|---|---|---|---|---|
| Inspection 348557646 | Oct 10, 2025 | 100 (63 willful or repeat) | $3,133,900 | osha.gov #348557646 |
| Inspection 343951976 | Apr 22, 2019 | 4 | $4,800 | osha.gov #343951976 |
Compared with similar employers
Among 56 other Other Chemical Product and Preparation Manufacturing (NAICS 3259) establishments nationwide with citations issued in the last 12 months, this establishment's proposed penalties ($3,133,900) were higher than 100% of them, and its 100 alleged items more than 100%.
| Last 12 months | This establishment | Peer median | Higher than |
|---|---|---|---|
| Initial (proposed) penalties | $3,133,900 | $10,750 | 100% |
| Alleged violation items | 100 | 3 | 100% |
Standards cited most in this industry
Share of the 71 cited inspections in Other Chemical Product and Preparation Manufacturing (NAICS 3259) nationwide (last 12 months) that included each standard; the ones marked were also cited here.
| Standard | Topic | Share of inspections | Cited here |
|---|---|---|---|
| 1910.147 | Lockout/Tagout | 25% | Yes |
| 1910.1200 | Hazard Communication | 21% | Yes |
| 1910.134 | Respiratory Protection | 21% | Yes |
| 1910.132 | PPE General Requirements | 18% | Yes |
| 1910.119 | Process Safety Management | 13% | Yes |
| 1910.178 | Forklifts | 10% |
Other manufacturing employers cited in Tennessee
- Oak Ridge Tool - Engineering, Inc.Oak Ridge, issued Oct 7, 2026, $5,700 initial (proposed)
- Teknia Nashville, LLCMount Juliet, issued Oct 7, 2026, $7,375 initial (proposed)
- BE Power Equipment USA, Inc.Decaturville, issued Oct 1, 2026, $10,000 initial (proposed)
- Eurostone LLCMurfreesboro, issued Sep 24, 2026, $16,300 initial (proposed)
- Sudberry Millwork LLCNashville, issued Sep 23, 2026, $900 initial (proposed)
- Troxel Company (the)Moscow, issued Sep 17, 2026, $8,000 initial (proposed)
Related
- Tennessee OSHA citations
- Tennessee manufacturing citations
- 1910.1200 Hazard Communication
- 1910.147 Lockout/Tagout
- 1910.212 Machine Guarding
- 1910.134 Respiratory Protection
- 1910.132 PPE General Requirements
- 1910.22 Walking-Working Surfaces
Is something on this page wrong or out of date? Request a correction or removal.