Citation Atlas

American Electric Power Inc.: OSHA inspection records

Data as of November 16, 2026

$82,750initial (proposed) penalties

6 alleged violation items across 1 cited inspection in the last 12 months, including 6 serious.

Status1 contestedinspection status per the public record

Get Texas alerts
Location
600 Mestina St., Corpus Christi, TX 78401
Industry
Utilities (NAICS 221122, Electric Power Generation, Transmission and Distribution)
Jurisdiction
Texas, Federal OSHA
Cited inspections
1 in the last 12 months

Alleged violations. Citations issued by federal OSHA. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology

Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.

Inspection 348830985

Contested Under contest; not a final finding. Items and penalties may change.

$82,750Initial (proposed) penalty
$82,750Current penalty
6Alleged violation items
Opened
March 25, 2026
Citations issued
September 18, 2026
Abatement due
October 8, 2026 (per OSHA record)
Contest date
October 9, 2026 (per OSHA record)
Official record
osha.gov inspection detail #348830985 · OSHA Establishment Search (if osha.gov shows its homepage, search inspection 348830985)
CitationStandardTypeIssuedAbatement dueInitial penaltyCurrent penaltyStatus
Citation 01001A1910.269(c)(1)(ii)
Electric Power Work
SeriousSep 18, 2026Oct 8, 2026$16,550$16,550Contested
Citation 01001B1910.269(c)(2)
Electric Power Work
SeriousSep 18, 2026Oct 8, 2026$0$0Contested
Citation 010021910.269(e)(3)
Electric Power Work
SeriousSep 18, 2026Oct 8, 2026$16,550$16,550Contested
Citation 010031910.269(l)(1)(iii)
Electric Power Work
SeriousSep 18, 2026Oct 8, 2026$16,550$16,550Contested
Citation 010041910.269(l)(4)(ii)(B)
Electric Power Work
SeriousSep 18, 2026Oct 8, 2026$16,550$16,550Contested
Citation 010051910.269(m)(3)(ii)
Electric Power Work
SeriousSep 18, 2026Oct 8, 2026$16,550$16,550Contested

Compared with similar employers

Among 127 other Electric Power Generation, Transmission and Distribution (NAICS 2211) establishments nationwide with citations issued in the last 12 months, this establishment's proposed penalties ($82,750) were higher than 99% of them, and its 6 alleged items more than 97%.

Last 12 monthsThis establishmentPeer medianHigher than
Initial (proposed) penalties$82,750$10,13299%
Alleged violation items6297%
Peers: cited establishments in the same NAICS industry nationwide. Proposed penalties before any settlement.

Standards cited most in this industry

Share of the 135 cited inspections in Electric Power Generation, Transmission and Distribution (NAICS 2211) nationwide (last 12 months) that included each standard; the ones marked were also cited here.

StandardTopicShare of inspectionsCited here
1910.269Electric Power Work19%Yes
1926.501Fall Protection8%
1910.303Electrical General7%
1910.212Machine Guarding4%
1926.503Fall Protection Training4%
1910.1200Hazard Communication3%

Other utilities employers cited in Texas

Related

Is something on this page wrong or out of date? Request a correction or removal.