Lazaro Paving Corp.: OSHA inspection records
Data as of November 16, 2026
$13,276initial (proposed) penalties, $12,644 current
2 alleged violation items across 1 cited inspection in the last 12 months.
Status1 informal settlementinspection status per the public record
Get Massachusetts alerts- Location
- Foundry Street, Wakefield, MA 01880
- Industry
- Construction (NAICS 237310, Highway, Street, and Bridge Construction)
- Jurisdiction
- Massachusetts, Federal OSHA
- Cited inspections
- 1 in the last 12 months
Alleged violations. Citations issued by federal OSHA. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
Inspection 348919853
Informal settlement Resolved through an informal settlement agreement.
- Opened
- May 5, 2026
- Citations issued
- June 15, 2026 to October 7, 2026
- Abatement due
- August 3, 2026 (per OSHA record)
- Final order date
- June 25, 2026 (per OSHA record)
- Deleted items
- 1 item deleted or withdrawn (not shown)
- Official record
- osha.gov inspection detail #348919853 · OSHA Establishment Search (if osha.gov shows its homepage, search inspection 348919853)
| Citation | Standard | Type | Issued | Abatement due | Initial penalty | Current penalty | Status |
|---|---|---|---|---|---|---|---|
| Citation 01001A | 1926.102(a)(1) Eye and Face Protection | Other-than-serious | Jun 15, 2026 | — | $3,376 | $3,376 | Informal settlement |
| Citation 01001B | 1926.1153(c)(1) Silica in Construction | Other-than-serious | Jun 15, 2026 | Aug 3, 2026 | $9,268 | $9,268 | Informal settlement |
Compared with similar employers
Among 41 other Highway, Street, and Bridge Construction (NAICS 2373) establishments in Massachusetts with citations issued in the last 12 months, this establishment's proposed penalties ($13,276) were higher than 95% of them, and its 2 alleged items more than 27%.
| Last 12 months | This establishment | Peer median | Higher than |
|---|---|---|---|
| Initial (proposed) penalties | $13,276 | $0 | 95% |
| Alleged violation items | 2 | 2 | 27% |
Standards cited most in this industry
Share of the 582 cited inspections in Highway, Street, and Bridge Construction (NAICS 2373) nationwide (last 12 months) that included each standard.
| Standard | Topic | Share of inspections | Cited here |
|---|---|---|---|
| 1910.1200 | Hazard Communication | 25% | |
| 1910.147 | Lockout/Tagout | 18% | |
| 1910.132 | PPE General Requirements | 17% | |
| 1910.303 | Electrical General | 15% | |
| 1910.305 | Wiring Methods | 13% | |
| 1910.157 | Fire Extinguishers | 13% |
Other construction employers cited in Massachusetts
- Hector's Construction, Inc.Methuen, issued Oct 7, 2026, $29,836 initial (proposed)
- Ray Services Inc.Lawrence, issued Oct 6, 2026, $105,929 initial (proposed)
- Power Home Remodeling Group, LLCMethuen, issued Oct 1, 2026, $99,300 initial (proposed)
- Caetano's Concrete Inc.East Boston, issued Sep 24, 2026, $70,178 initial (proposed)
- Scher Framing Construction, Inc.Hyde Park, issued Sep 23, 2026, $39,720 initial (proposed)
- Hwa Services LLCMaynard, issued Sep 22, 2026, $41,706 initial (proposed)
Related
- Massachusetts OSHA citations
- Massachusetts construction citations
- 1926.102 Eye and Face Protection
- 1926.1153 Silica in Construction
Is something on this page wrong or out of date? Request a correction or removal.