1910.268 Telecommunications: citations, penalties and recently cited employers
Data as of November 16, 2026 · citations issued Nov 16, 2025 to Nov 16, 2026
Applies to work at telecommunications centers and field installations, including installing and maintaining communication lines, equipment, and cable on poles, towers, and underground. It addresses training, protective equipment, ladders and climbing, aerial lifts, underground vaults and manholes, tree trimming near lines, and working near power conductors. Employees must be trained in procedures for the hazards they face, and specific safeguards apply to entering manholes and working near energized electric supply lines.
OSHA often groups related violations into one citation (items such as 01002A and 01002B) and records the group's penalty on one item, sometimes under another standard. The medians count each citation with an item under 1910.268 once, at the group's combined penalty. 7% of items carried no separate penalty: 33% of those were grouped with a related violation in the same citation, which carries the penalty, and the rest were cited with no proposed fine (mostly other-than-serious items).
What the standard requires
- Train employees in telecommunications work practices and hazards
- Test atmospheres and protect openings when entering manholes and vaults
- Inspect poles, ladders, and climbing equipment before use
- Maintain safe distances from electric power conductors
Hazards it addresses
- Falls from poles and towers
- Electrocution from power line contact
- Hazardous atmospheres in manholes
Cited among telecommunications carriers, cable installers, and line contractors.
Plain-language summary written for this site; it is not the regulatory text and not legal advice. Read the official text at eCFR.
Citations by month
Inspections with citations issued, by month of issuance. Hatched months are incomplete: citations reach the public data about a month after issuance.
Most-cited paragraphs
| Paragraph | What it covers | Items | Inspections | Median proposed penalty per citation |
|---|---|---|---|---|
| 1910.268(c) | 9 | 9 | $3,500 | |
| 1910.268(b)(7) | 7 | 7 | $7,000 | |
| 1910.268(g)(1) | 5 | 5 | $4,965 | |
| 1910.268(c)(3) | 3 | 3 | $3,500 | |
| 1910.268(d)(1) | 3 | 3 | $3,500 | |
| 1910.268(j)(3) | 3 | 3 | $7,000 | |
| 1910.268(b)(6) | 2 | 2 | $7,142 | |
| 1910.268(c)(2) | 2 | 2 | $7,000 | |
| 1910.268(e) | 2 | 2 | $9,572 | |
| 1910.268(g)(2)(iv)(C) | 2 | 2 | $3,500 | |
| 1910.268(i)(1) | 2 | 2 | $3,500 | |
| 1910.268(j)(1)(i) | 2 | 2 | $3,500 | |
| 1910.268(j)(4)(iv)(F) | 1 | 1 | $2,500 |
Penalties
Across 43 alleged items, OSHA and state-plan offices proposed $377,484 in initial penalties. The current total in the public data is $353,204, 6% lower after settlements, contests and amendments.
By violation type: Serious 84%; Other-than-serious 12%; Willful 5%.
Trends and abatement
From December 2025 to August 2026 (months with complete data), 16 inspections citing 1910.268 had citations first issued, 33% more than in the same months a year earlier (12).
Abatement time: for the 37 alleged items under 1910.268 with an abatement date, OSHA set a median of 18 days from issuance to correct the hazard (a quarter got more than 26 days).
Penalty distribution
Half of the initial (proposed) penalties per citation (grouped items combined) were $4,965 or less; a quarter were above $7,000, and one in ten above $14,895.
| Initial (proposed) penalty per citation (grouped items combined) | Count | Share |
|---|---|---|
| Under $1,000 | 3 | 7% |
| $1,000 to $4,999 | 24 | 57% |
| $5,000 to $14,999 | 11 | 26% |
| $15,000 to $49,999 | 2 | 5% |
| $50,000 or more | 2 | 5% |
Industries cited most under 1910.268
| Industry (NAICS) | Cited inspections | Share |
|---|---|---|
| Industry without a 2022 NAICS title 5179 | 7 | 37% |
| Building Equipment Contractors 2382 | 4 | 21% |
| Other Specialty Trade Contractors 2389 | 2 | 11% |
| Utility System Construction 2371 | 2 | 11% |
| Lumber and Other Construction Materials Merchant Wholesalers 4233 | 1 | 5% |
| Wired and Wireless Telecommunications (except Satellite) 5171 | 1 | 5% |
| Industry without a 2022 NAICS title 5173 | 1 | 5% |
| Electronic and Precision Equipment Repair and Maintenance 8112 | 1 | 5% |
Citations by state
| State | Inspections cited | Items | Initial penalties | Current penalties |
|---|---|---|---|---|
| Texas | 4 | 8 | $69,510 | $54,615 |
| Kentucky | 3 | 19 | $221,900 | $221,900 |
| Puerto Rico | 3 | 4 | $26,800 | $18,905 |
| Virginia | 2 | 4 | $19,040 | $19,040 |
| Wisconsin | 2 | 2 | $8,937 | $8,937 |
| Georgia | 1 | 1 | $0 | $0 |
| Iowa | 1 | 1 | $9,384 | $9,384 |
| Illinois | 1 | 1 | $4,965 | $3,475 |
| Maine | 1 | 1 | $11,585 | $11,585 |
| Ohio | 1 | 2 | $5,363 | $5,363 |
By industry
- Information: 9 inspections
- Construction: 8 inspections
- Other services: 1 inspections
- Wholesale trade: 1 inspections
Recently cited establishments
Alleged violations. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
| Establishment | Location | Issued | Alleged items | Initial penalty | Current penalty | Status and deadlines | Source |
|---|---|---|---|---|---|---|---|
| Fidium Manager Services, LLC | Topsfield, ME | Oct 1, 2026 | 1 | $11,585 | $11,585 | OpenAbatement due Nov 19, 2026Contest deadline ~Oct 23, 2026 (est.) | osha.gov #348957861 |
| Schaal Plumbing, Heating and Cooling | Knoxville, IA | Sep 11, 2026 | 1 | $9,384 | $9,384 | Informal settlementAbatement due Oct 2, 2026 | osha.gov #348865205 |
| Acon, LLC | Katy, TX | Aug 27, 2026 | 3 | $14,895 | $0 | Informal settlementAbatement due Sep 16, 2026 | osha.gov #348780339 |
| Puerto Rico Telephone Company Inc. | Penuelas, PR | Aug 14, 2026 | 1 | $16,550 | $9,930 | Informal settlement | osha.gov #348769951 |
| Harlan Community Television Incorporated | Holmes Mill, KY | Jul 27, 2026 | 9 | $108,500 | $108,500 | ContestedAbatement due Aug 14, 2026Contested Aug 13, 2026 | osha.gov #348788829 |
| Apex Fiber Optics LLC | Holmes Mill, KY | Jul 27, 2026 | 9 | $108,500 | $108,500 | ContestedAbatement due Aug 14, 2026Contested Aug 14, 2026 | osha.gov #348788803 |
| Alvarado Telecom, LLC | Menasha, WI | Jul 2, 2026 | 1 | $4,965 | $4,965 | Final order | osha.gov #348975384 |
| Cross Communications, LLC | Lake Nebagamon, WI | May 15, 2026 | 1 | $3,972 | $3,972 | Informal settlementAbatement due Jun 1, 2026 | osha.gov #348622150 |
| City Communications LLC | San Juan, PR | May 13, 2026 | 2 | $6,000 | $6,000 | ContestedAbatement due Jun 8, 2026Contested Jun 10, 2026 | osha.gov #348603291 |
| Thacker Grigsby Telephone Company Inc. | Wolverine, KY | Mar 18, 2026 | 1 | $4,900 | $4,900 | ContestedAbatement due Apr 6, 2026Contested Mar 26, 2026 | osha.gov #348643685 |
| Alex Tower XI Inc. | Pekin, IL | Mar 17, 2026 | 1 | $4,965 | $3,475 | Informal settlementAbatement due Apr 1, 2026 | osha.gov #348738840 |
| CK Contractors and Development, LLC | Lebanon, VA | Mar 6, 2026 | 1 | $0 | $0 | Final orderAbatement due Apr 1, 2026 | osha.gov #348726530 |
| Broadband Telecom Services, Inc. | Farmersville, TX | Jan 28, 2026 | 1 | $14,895 | $14,895 | Informal settlementAbatement due Mar 13, 2026 | osha.gov #348407941 |
| Puerto Rico Telephone Company Inc. | Camuy, PR | Jan 16, 2026 | 1 | $4,250 | $2,975 | OpenAbatement due Feb 11, 2026Contest deadline ~Feb 9, 2026 (est.) | osha.gov #348377904 |
| Trace Wireless, LLC | Trinity, TX | Jan 14, 2026 | 2 | $9,930 | $9,930 | ContestedAbatement due Jan 29, 2026Contested Mar 30, 2026 | osha.gov #348389842 |
| Mega Communications | Washington Court House, OH | Jan 7, 2026 | 2 | $5,363 | $5,363 | Final orderAbatement due Feb 11, 2026 | osha.gov #348596966 |
| Moldcable, Inc. | Liberty Hill, TX | Jan 6, 2026 | 2 | $29,790 | $29,790 | ContestedAbatement due Feb 2, 2026Contested Feb 3, 2026 | osha.gov #348356445 |
| J B Nasser Inc. | Front Royal, VA | Dec 31, 2025 | 3 | $19,040 | $19,040 | ContestedAbatement due Feb 20, 2026Contested Jan 20, 2026 | osha.gov #348588716 |
| Bigham Cable Construction, Inc. | Reynolds, GA | Nov 18, 2025 | 1 | $0 | $0 | Informal settlementAbatement due Dec 16, 2025 | osha.gov #348273236 |
Notable employers cited under 1910.268
Largest proposed penalties under 1910.268 in the last 12 months (items under this standard only), among establishments with a detailed history page. Alleged violations; see each page for status and current penalty.
- Apex Fiber Optics LLCHolmes Mill, KY · $108,500 initial (proposed) · 1 alleged willful or repeat
- Harlan Community Television IncorporatedHolmes Mill, KY · $108,500 initial (proposed) · 1 alleged willful or repeat
- Puerto Rico Telephone Company Inc.Penuelas, PR · $16,550 initial (proposed)
Often cited together
- 1910.23 Ladders (2 shared inspections)
- 1910.132 PPE General Requirements (2 shared inspections)
- 1910.67 Aerial Lifts (2 shared inspections)
- 1910.1200 Hazard Communication (1 shared inspections)
- 1910.178 Forklifts (1 shared inspections)
- 1910.30 Fall Hazard Training (1 shared inspections)
Questions
What does OSHA standard 1910.268 require?
Applies to work at telecommunications centers and field installations, including installing and maintaining communication lines, equipment, and cable on poles, towers, and underground. It addresses training, protective equipment, ladders and climbing, aerial lifts, underground vaults and manholes, tree trimming near lines, and working near power conductors. Employees must be trained in procedures for the hazards they face, and specific safeguards apply to entering manholes and working near energized electric supply lines.
How often was 1910.268 cited in the last 12 months?
In the public data as of November 16, 2026, 1910.268 (Telecommunications) appeared in 19 inspections with citations issued between Nov 16, 2025 and Nov 16, 2026, covering 43 alleged violation items.
Which part of 1910.268 is cited most?
1910.268(c) was the most-cited paragraph, with 9 items.
Which states cite 1910.268 most often?
The most citations under 1910.268 in this period were issued in Texas, Kentucky, Puerto Rico.
What is the typical penalty for a 1910.268 violation?
Counting each citation once, the median initial (proposed) penalty was $4,965 per citation; the median current penalty after settlements and amendments was $3,736. OSHA often groups related violations (items such as 01002A and 01002B) into one citation with one penalty, recorded on one item and sometimes under another standard, so these figures combine the grouped items. 7% of items carried no separate penalty: 33% of those were grouped with a related violation in the same citation, which carries the penalty, and the rest were cited with no proposed fine (mostly other-than-serious items). Totals for the items under 1910.268: $377,484 proposed, $353,204 current. Penalties vary by violation type, employer size and history, and State Plans set their own amounts.
Are 1910.268 citations final?