1926.302 Power-Operated Hand Tools: citations, penalties and recently cited employers
Data as of November 16, 2026 · citations issued Nov 16, 2025 to Nov 16, 2026
This section covers electric, pneumatic, fuel-powered, hydraulic, and powder-actuated hand tools on construction sites. Electric tools must be grounded or double-insulated, pneumatic hoses must be secured to prevent accidental disconnection, and compressed air used for cleaning must be reduced below 30 psi with chip guarding. Only trained workers may operate powder-actuated tools, which must be tested, loaded only before use, and never pointed at anyone.
OSHA often groups related violations into one citation (items such as 01002A and 01002B) and records the group's penalty on one item, sometimes under another standard. The medians count each citation with an item under 1926.302 once, at the group's combined penalty. 8% of items carried no separate penalty: 33% of those were grouped with a related violation in the same citation, which carries the penalty, and the rest were cited with no proposed fine (mostly other-than-serious items).
What the standard requires
- Use grounded or double-insulated electric tools
- Secure pneumatic tool hoses and attachments against disconnection
- Limit compressed air for cleaning to under 30 psi with chip guarding
- Permit only trained employees to use powder-actuated tools
Hazards it addresses
- Electric shock from ungrounded tools
- Injuries from whipping air hoses
- Penetrating wounds from nail guns and powder-actuated fasteners
Cited in framing, concrete forming, and finish carpentry trades.
Plain-language summary written for this site; it is not the regulatory text and not legal advice. Read the official text at eCFR.
Citations by month
Inspections with citations issued, by month of issuance. Hatched months are incomplete: citations reach the public data about a month after issuance.
Most-cited paragraphs
| Paragraph | What it covers | Items | Inspections | Median proposed penalty per citation |
|---|---|---|---|---|
| 1926.302(b)(3) | 27 | 27 | $1,000 | |
| 1926.302(b)(4) | Compressed air for cleaning must be reduced to less than 30 psi and used with effective chip guarding and PPE. | 2 | 2 | $1,564 |
| 1926.302(e)(11) | 2 | 2 | $2,956 | |
| 1926.302(b)(10) | 1 | 1 | $3,972 | |
| 1926.302(b)(5) | 1 | 1 | $0 | |
| 1926.302(b)(6) | 1 | 1 | $4,256 | |
| 1926.302(e)(1) | Only employees trained in the operation of the particular tool may operate powder-actuated tools. | 1 | 1 | $1,200 |
| 1926.302(e)(6) | 1 | 1 | $0 |
Penalties
Across 36 alleged items, OSHA and state-plan offices proposed $53,238 in initial penalties. The current total in the public data is $49,116, 8% lower after settlements, contests and amendments.
By violation type: Serious 83%; Other-than-serious 8%; Repeat 8%.
Trends and abatement
From December 2025 to August 2026 (months with complete data), 26 inspections citing 1926.302 had citations first issued, 42% fewer than in the same months a year earlier (45).
Abatement time: for the 21 alleged items under 1926.302 with an abatement date, OSHA set a median of 10 days from issuance to correct the hazard (a quarter got more than 25 days).
Penalty distribution
Half of the initial (proposed) penalties per citation (grouped items combined) were $1,000 or less; a quarter were above $1,814, and one in ten above $3,300.
| Initial (proposed) penalty per citation (grouped items combined) | Count | Share |
|---|---|---|
| Under $1,000 | 13 | 37% |
| $1,000 to $4,999 | 21 | 60% |
| $5,000 to $14,999 | 1 | 3% |
| $15,000 to $49,999 | 0 | 0% |
| $50,000 or more | 0 | 0% |
Industries cited most under 1926.302
| Industry (NAICS) | Cited inspections | Share |
|---|---|---|
| Foundation, Structure, and Building Exterior Contractors 2381 | 31 | 89% |
| Nonresidential Building Construction 2362 | 2 | 6% |
| Building Finishing Contractors 2383 | 2 | 6% |
Citations by state
| State | Inspections cited | Items | Initial penalties | Current penalties |
|---|---|---|---|---|
| Maryland | 28 | 28 | $30,012 | $27,734 |
| Wisconsin | 2 | 2 | $6,100 | $5,462 |
| Colorado | 1 | 2 | $4,256 | $4,256 |
| Connecticut | 1 | 1 | $2,412 | $1,206 |
| North Carolina | 1 | 1 | $1,000 | $1,000 |
| New York | 1 | 1 | $5,958 | $5,958 |
| Puerto Rico | 1 | 1 | $3,500 | $3,500 |
By industry
- Construction: 35 inspections
Recently cited establishments
Alleged violations. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
| Establishment | Location | Issued | Alleged items | Initial penalty | Current penalty | Status and deadlines | Source |
|---|---|---|---|---|---|---|---|
| V&S Construction Services, Inc. | Cumberland, WI | Sep 25, 2026 | 1 | $2,128 | $1,490 | Informal settlementAbatement due Oct 26, 2026 | osha.gov #349152595 |
| J&I Remodeling LLC | Baltimore, MD | Sep 14, 2026 | 1 | $1,200 | $1,200 | OpenAbatement due Sep 22, 2026Contest deadline ~Oct 5, 2026 (est.) | osha.gov #349090340 |
| CT Floors & Remodeling LLC | East Hartford, CT | Sep 9, 2026 | 1 | $2,412 | $1,206 | Informal settlementAbatement due Oct 27, 2026 | osha.gov #348947607 |
| Sam's Contractors, LLC | Joppa, MD | Sep 3, 2026 | 1 | $1,350 | $850 | Informal settlement | osha.gov #349044321 |
| Ac_are Construction Services LLC | Frederick, MD | Sep 1, 2026 | 1 | $1,250 | $1,250 | Final orderAbatement due Sep 10, 2026 | osha.gov #348987033 |
| Name withheld (individual) | Smithsburg, MD | Aug 28, 2026 | 1 | $600 | $600 | Final orderAbatement due Sep 8, 2026 | osha.gov #349074815 |
| Name withheld (individual) | Ocean City, MD | Aug 19, 2026 | 1 | $1,000 | $1,000 | Final orderAbatement due Aug 27, 2026 | osha.gov #349051136 |
| J&N Corrales Construction LLC | Ocean City, MD | Aug 18, 2026 | 1 | $600 | $600 | Final orderAbatement due Sep 21, 2026 | osha.gov #349049932 |
| Roger General Construction LLC | Hagerstown, MD | Aug 18, 2026 | 1 | $500 | $500 | OpenAbatement due Aug 26, 2026Contest deadline ~Sep 9, 2026 (est.) | osha.gov #349048959 |
| ACR Solutions LLC | Baltimore, MD | Aug 18, 2026 | 1 | $0 | $0 | Informal settlementAbatement due Aug 26, 2026 | osha.gov #349024869 |
| Solano Construction, LLC | Cambridge, MD | Jul 14, 2026 | 1 | $3,000 | $3,000 | Final orderAbatement due Jul 22, 2026 | osha.gov #348966763 |
| K&S Construction Services, LLC | Cockeysville, MD | Jul 14, 2026 | 1 | $0 | $0 | Final orderAbatement due Jul 22, 2026 | osha.gov #348917691 |
| MD Roofing & Siding LLC | Berlin, MD | Jul 6, 2026 | 1 | $500 | $350 | Informal settlementAbatement due Aug 6, 2026 | osha.gov #348870346 |
| Lap Siding, Gutter & Roofing, LLC | Pikesville, MD | Jun 2, 2026 | 1 | $437 | $437 | Final orderAbatement due Jun 10, 2026 | osha.gov #348873076 |
| BRC Construction, Inc. | Stevensville, MD | May 20, 2026 | 1 | $750 | $525 | Informal settlementAbatement due May 29, 2026 | osha.gov #348876624 |
| Name withheld (individual) | Baltimore, MD | May 15, 2026 | 1 | $1,000 | $1,000 | Final orderAbatement due May 26, 2026 | osha.gov #348806704 |
| Pastora Construction LLC | Baltimore, MD | May 15, 2026 | 1 | $1,000 | $1,000 | Final orderAbatement due May 26, 2026 | osha.gov #348796574 |
| A1 Roofing & Restoration, LLC | Denton, MD | May 15, 2026 | 1 | $1,250 | $1,250 | Final orderAbatement due May 26, 2026 | osha.gov #348753229 |
| Name withheld (individual) | Denton, MD | May 11, 2026 | 1 | $3,000 | $3,000 | Final orderAbatement due May 19, 2026 | osha.gov #348653452 |
| TC Habana Construction Inc. | Ijamsville, MD | Apr 17, 2026 | 1 | $875 | $875 | Final orderAbatement due Apr 27, 2026 | osha.gov #348817172 |
| Bluestar Remodeling LLC | Centreville, MD | Mar 23, 2026 | 1 | $1,500 | $1,500 | Final orderAbatement due Mar 31, 2026 | osha.gov #348704206 |
| EZ Prado Construction LLC | Centreville, MD | Mar 23, 2026 | 1 | $1,350 | $810 | Informal settlement | osha.gov #348629221 |
| RG Pro Siding, Inc. | Easton, MD | Mar 20, 2026 | 1 | $2,500 | $2,500 | Final orderAbatement due Mar 30, 2026 | osha.gov #348677634 |
| Second Base, LLC | Canovanas, PR | Mar 10, 2026 | 1 | $3,500 | $3,500 | ContestedContested Mar 17, 2026 | osha.gov #348522111 |
| R.D.G. Construction, LLC | Westminster, MD | Mar 9, 2026 | 1 | $1,000 | $600 | Informal settlementAbatement due Mar 17, 2026 | osha.gov #348570854 |
| B&R Roofing LLC | Frederick, MD | Feb 18, 2026 | 1 | $1,250 | $787 | Informal settlementAbatement due Feb 26, 2026 | osha.gov #348682022 |
| Brothers Masonry & Construction LLC | Clarksburg, MD | Feb 18, 2026 | 1 | $1,200 | $1,200 | Final orderAbatement due Feb 26, 2026 | osha.gov #348641788 |
| Jac Construction, LLC | Easton, MD | Feb 17, 2026 | 1 | $750 | $750 | Final orderAbatement due Feb 25, 2026 | osha.gov #348589177 |
| Name withheld (individual) | Pikesville, MD | Dec 31, 2025 | 1 | $750 | $750 | Formal settlementAbatement due Jan 9, 2026Contested Feb 11, 2026 | osha.gov #348560988 |
| Tanksco, Inc. | Kellnersville, WI | Dec 18, 2025 | 1 | $3,972 | $3,972 | Final orderAbatement due Jan 12, 2026 | osha.gov #348542747 |
| Jsa Siding LLC | Arvada, CO | Dec 17, 2025 | 2 | $4,256 | $4,256 | Final orderAbatement due Jan 26, 2026 | osha.gov #348382250 |
| D-A Framing, LLC | Rolesville, NC | Nov 25, 2025 | 1 | $1,000 | $1,000 | Final orderAbatement due Dec 1, 2025 | osha.gov #348497942 |
| Name withheld (individual) | Ocean Pines, MD | Nov 24, 2025 | 1 | $875 | $875 | Final orderAbatement due Dec 4, 2025 | osha.gov #348561200 |
| Wancl Framing & Contractor LLC | Ithaca, NY | Feb 12, 2026 | 1 | $5,958 | $5,958 | Final orderAbatement due Dec 4, 2025 | osha.gov #348387747 |
| Name withheld (individual) | Cordova, MD | Nov 19, 2025 | 1 | $525 | $525 | Final orderAbatement due Dec 1, 2025 | osha.gov #348513813 |
Notable employers cited under 1926.302
Largest proposed penalties under 1926.302 in the last 12 months (items under this standard only), among establishments with a detailed history page. Alleged violations; see each page for status and current penalty.
- Solano Construction, LLCCambridge, MD · $3,000 initial (proposed) · 7 alleged willful or repeat
- RG Pro Siding, Inc.Easton, MD · $2,500 initial (proposed) · 5 alleged willful or repeat
- Bluestar Remodeling LLCCentreville, MD · $1,500 initial (proposed) · 9 alleged willful or repeat
- EZ Prado Construction LLCCentreville, MD · $1,350 initial (proposed) · 3 alleged willful or repeat · 2 inspections on record
- Ac_are Construction Services LLCFrederick, MD · $1,250 initial (proposed) · 17 alleged willful or repeat · 4 inspections on record
- A1 Roofing & Restoration, LLCDenton, MD · $1,250 initial (proposed) · 7 alleged willful or repeat
- B&R Roofing LLCFrederick, MD · $1,250 initial (proposed) · 7 alleged willful or repeat
- BRC Construction, Inc.Stevensville, MD · $750 initial (proposed) · 7 alleged willful or repeat · 2 inspections on record
- Jac Construction, LLCEaston, MD · $750 initial (proposed) · 5 alleged willful or repeat · 2 inspections on record
- ACR Solutions LLCBaltimore, MD · $0 initial (proposed) · 3 alleged willful or repeat
Often cited together
- 1926.501 Fall Protection (27 shared inspections)
- 1926.503 Fall Protection Training (26 shared inspections)
- 1926.102 Eye and Face Protection (24 shared inspections)
- 1926.20 Construction Safety Programs (18 shared inspections)
- 1926.1053 Ladder Safety (16 shared inspections)
- 1926.100 Hard Hats (10 shared inspections)
- 1926.300 Hand and Power Tools (7 shared inspections)
- 1926.1060 Ladder and Stair Training (7 shared inspections)
Questions
What does OSHA standard 1926.302 require?
This section covers electric, pneumatic, fuel-powered, hydraulic, and powder-actuated hand tools on construction sites. Electric tools must be grounded or double-insulated, pneumatic hoses must be secured to prevent accidental disconnection, and compressed air used for cleaning must be reduced below 30 psi with chip guarding. Only trained workers may operate powder-actuated tools, which must be tested, loaded only before use, and never pointed at anyone.
How often was 1926.302 cited in the last 12 months?
In the public data as of November 16, 2026, 1926.302 (Power-Operated Hand Tools) appeared in 35 inspections with citations issued between Nov 16, 2025 and Nov 16, 2026, covering 36 alleged violation items.
Which part of 1926.302 is cited most?
1926.302(b)(3) was the most-cited paragraph, with 27 items.
Which states cite 1926.302 most often?
The most citations under 1926.302 in this period were issued in Maryland, Wisconsin, Colorado.
What is the typical penalty for a 1926.302 violation?
Counting each citation once, the median initial (proposed) penalty was $1,000 per citation; the median current penalty after settlements and amendments was $1,000. OSHA often groups related violations (items such as 01002A and 01002B) into one citation with one penalty, recorded on one item and sometimes under another standard, so these figures combine the grouped items. 8% of items carried no separate penalty: 33% of those were grouped with a related violation in the same citation, which carries the penalty, and the rest were cited with no proposed fine (mostly other-than-serious items). Totals for the items under 1926.302: $53,238 proposed, $49,116 current. Penalties vary by violation type, employer size and history, and State Plans set their own amounts.
Are 1926.302 citations final?
Not necessarily. A citation is an allegation until it becomes a final order. 6% of these items were contested, and many others were changed in settlements. Each listing shows its current status and a link to the official record.