Cruz Cruz Framing LLC: OSHA inspection records
Data as of November 16, 2026
$9,222initial (proposed) penalties
2 alleged violation items across 1 cited inspection in the last 12 months, including 1 repeat, 1 serious.
Status1 final orderinspection status per the public record
Get Georgia alerts- Location
- 2669 Turnwater St., Hoschton, GA 30548
- Industry
- Construction (NAICS 238130, Foundation, Structure, and Building Exterior Contractors)
- Jurisdiction
- Georgia, Federal OSHA
- Cited inspections
- 1 in the last 12 months
- Inspection history
- Inspected 2 times since 2025; 2 of those inspections had citations; 1 alleged willful or repeat item on record.
Alleged violations. Citations issued by federal OSHA. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
Inspection 348793159
Final order The citation items have become a final order.
- Opened
- March 5, 2026
- Citations issued
- March 10, 2026
- Final order date
- April 9, 2026 (per OSHA record)
- Official record
- osha.gov inspection detail #348793159 · OSHA Establishment Search (if osha.gov shows its homepage, search inspection 348793159)
| Citation | Standard | Type | Issued | Abatement due | Initial penalty | Current penalty | Status |
|---|---|---|---|---|---|---|---|
| Citation 01001 | 1926.102(a)(1) Eye and Face Protection | Serious | Mar 10, 2026 | — | $2,128 | $2,128 | Final order |
| Citation 02001 | 1926.501(b)(13) Fall Protection | Repeat | Mar 10, 2026 | — | $7,094 | $7,094 | Final order |
Inspection history since 2025
OSHA recorded 2 inspections at this establishment name and ZIP code since 2025, the most recent opened Mar 5, 2026. 2 of them had citations. 1 earlier inspection with citations opened in the five years before the most recent one; OSHA's repeat classification generally looks back five years.
Inspections opened per year. Same establishment name and ZIP code in DOL's full inspection history; different spellings or addresses of one business are not joined.
| Inspection | Opened | Alleged items | Initial penalty | Source |
|---|---|---|---|---|
| Inspection 348793159 | Mar 5, 2026 | 2 (1 willful or repeat) | $9,222 | osha.gov #348793159 |
| Inspection 348377508 | Jul 16, 2025 | 3 | $5,106 | osha.gov #348377508 |
Compared with similar employers
Among 421 other Foundation, Structure, and Building Exterior Contractors (NAICS 2381) establishments in Georgia with citations issued in the last 12 months, this establishment's proposed penalties ($9,222) were higher than 82% of them, and its 2 alleged items more than 28%.
| Last 12 months | This establishment | Peer median | Higher than |
|---|---|---|---|
| Initial (proposed) penalties | $9,222 | $4,965 | 82% |
| Alleged violation items | 2 | 2 | 28% |
Standards cited most in this industry
Share of the 8,181 cited inspections in Foundation, Structure, and Building Exterior Contractors (NAICS 2381) nationwide (last 12 months) that included each standard; the ones marked were also cited here.
| Standard | Topic | Share of inspections | Cited here |
|---|---|---|---|
| 1926.501 | Fall Protection | 61% | Yes |
| 1926.503 | Fall Protection Training | 24% | |
| 1926.1053 | Ladder Safety | 23% | |
| 1926.102 | Eye and Face Protection | 19% | Yes |
| 1926.451 | Scaffold Safety | 11% | |
| 1926.100 | Hard Hats | 9% |
Other construction employers cited in Georgia
- At Concrete & More, LLCHoschton, issued Jul 16, 2026, $7,944 initial (proposed)
- JZ Imperio, Inc.Savannah, issued Sep 11, 2026, $36,599 initial (proposed)
- Action Electric Co., Inc.Atlanta, issued Aug 12, 2026, $37,832 initial (proposed)
- Mejia Construction LLCSavannah, issued Jul 29, 2026, $24,686 initial (proposed)
- Carcamo's Construction LLCLudowici, issued Jul 27, 2026, $9,931 initial (proposed)
- MR. Framing Solution LLCMcdonough, issued Jul 22, 2026, $13,620 initial (proposed)
Related
- Georgia OSHA citations
- Georgia construction citations
- 1926.501 Fall Protection
- 1926.102 Eye and Face Protection
Is something on this page wrong or out of date? Request a correction or removal.