1926.451 Scaffold Safety: citations, penalties and recently cited employers
Data as of November 16, 2026 · citations issued Nov 16, 2025 to Nov 16, 2026
This is the core scaffold standard for construction, setting requirements for capacity, platform construction, footing, access, use, and fall protection. Scaffolds must support their own weight and at least four times the intended load, platforms must be fully planked, and supported scaffolds must rest on base plates and mud sills. Workers must have safe access, scaffolds must be inspected by a competent person before each shift, and fall protection is required above 10 feet.
OSHA often groups related violations into one citation (items such as 01002A and 01002B) and records the group's penalty on one item, sometimes under another standard. The medians count each citation with an item under 1926.451 once, at the group's combined penalty. 23% of items carried no separate penalty, usually because OSHA grouped them with a related violation in the same citation, which carries the penalty.
What the standard requires
- Design scaffolds to support at least four times the intended load
- Fully plank or deck each working platform
- Set supported scaffolds on base plates and mud sills or other firm foundation
- Provide safe access when platforms are more than 2 feet above or below a landing
- Protect workers more than 10 feet up with guardrails or personal fall arrest
Hazards it addresses
- Falls from scaffold platforms
- Scaffold collapse
- Workers struck by falling tools or materials
One of OSHA's most frequently cited standards, especially in masonry, siding, painting, and residential construction.
Plain-language summary written for this site; it is not the regulatory text and not legal advice. Read the official text at eCFR.
Citations by month
Inspections with citations issued, by month of issuance. Hatched months are incomplete: citations reach the public data about a month after issuance.
Most-cited paragraphs
| Paragraph | What it covers | Items | Inspections | Median proposed penalty per citation |
|---|---|---|---|---|
| 1926.451(g)(1) | Employees on scaffolds more than 10 feet above a lower level must be protected from falling. | 422 | 422 | $3,972 |
| 1926.451(e)(1) | Safe access is required when scaffold platforms are more than 2 feet above or below a point of access. | 254 | 253 | $3,972 |
| 1926.451(b)(1) | Each platform on all working levels must be fully planked or decked between the front uprights and guardrail supports. | 215 | 214 | $3,972 |
| 1926.451(g)(1)(vii) | Employees on scaffolds more than 10 feet above a lower level must be protected from falling. | 213 | 213 | $3,547 |
| 1926.451(f)(3) | Scaffolds must be inspected for visible defects by a competent person before each work shift. | 181 | 181 | $3,500 |
| 1926.451(g)(4)(i) | Guardrail systems must be installed along open sides and ends of platforms. | 155 | 155 | $4,200 |
| 1926.451(c)(2) | Supported scaffold poles, legs, and uprights must bear on base plates and mud sills or other adequate firm foundation. | 153 | 153 | $3,255 |
| 1926.451(f)(7) | 143 | 143 | $3,972 | |
| 1926.451(b)(2) | 96 | 96 | $3,405 | |
| 1926.451(a)(6) | 70 | 70 | $4,256 | |
| 1926.451(c)(2)(v) | Supported scaffold poles, legs, and uprights must bear on base plates and mud sills or other adequate firm foundation. | 59 | 59 | $3,547 |
| 1926.451(b)(1)(i) | Each platform on all working levels must be fully planked or decked between the front uprights and guardrail supports. | 56 | 56 | $3,015 |
| 1926.451(c)(3) | 56 | 56 | $3,405 | |
| 1926.451(g)(1)(i) | Employees on scaffolds more than 10 feet above a lower level must be protected from falling. | 55 | 55 | $3,972 |
| 1926.451(c)(2)(iv) | Supported scaffold poles, legs, and uprights must bear on base plates and mud sills or other adequate firm foundation. | 45 | 45 | $4,502 |
Penalties
Across 2,751 alleged items, OSHA and state-plan offices proposed $10,409,817 in initial penalties. The current total in the public data is $8,631,470, 17% lower after settlements, contests and amendments.
By violation type: Serious 90%; Other-than-serious 6%; Repeat 3%; Willful 1%.
Trends and abatement
From December 2025 to August 2026 (months with complete data), 1,049 inspections citing 1926.451 had citations first issued, 6% fewer than in the same months a year earlier (1,116).
Abatement time: for the 1,592 alleged items under 1926.451 with an abatement date, OSHA set a median of 19 days from issuance to correct the hazard (a quarter got more than 28 days).
Penalty distribution
Half of the initial (proposed) penalties per citation (grouped items combined) were $3,972 or less; a quarter were above $4,965, and one in ten above $9,036.
| Initial (proposed) penalty per citation (grouped items combined) | Count | Share |
|---|---|---|
| Under $1,000 | 179 | 8% |
| $1,000 to $4,999 | 1,527 | 71% |
| $5,000 to $14,999 | 388 | 18% |
| $15,000 to $49,999 | 61 | 3% |
| $50,000 or more | 8 | 0% |
Industries cited most under 1926.451
| Industry (NAICS) | Cited inspections | Share |
|---|---|---|
| Foundation, Structure, and Building Exterior Contractors 2381 | 880 | 70% |
| Residential Building Construction 2361 | 103 | 8% |
| Nonresidential Building Construction 2362 | 86 | 7% |
| Building Finishing Contractors 2383 | 76 | 6% |
| Other Specialty Trade Contractors 2389 | 25 | 2% |
| Building Equipment Contractors 2382 | 23 | 2% |
| Other Wood Product Manufacturing 3219 | 5 | <1% |
| Lumber and Other Construction Materials Merchant Wholesalers 4233 | 5 | <1% |
Citations by state
| State | Inspections cited | Items | Initial penalties | Current penalties |
|---|---|---|---|---|
| New Jersey | 108 | 202 | $1,081,120 | $957,201 |
| Illinois | 87 | 170 | $861,683 | $719,652 |
| Texas | 85 | 180 | $918,073 | $793,595 |
| New York | 79 | 148 | $626,468 | $503,120 |
| Georgia | 72 | 134 | $414,712 | $376,825 |
| Virginia | 69 | 199 | $1,008,316 | $977,883 |
| North Carolina | 65 | 147 | $266,734 | $229,485 |
| Pennsylvania | 65 | 133 | $751,537 | $602,374 |
| Florida | 62 | 173 | $501,253 | $382,516 |
| Massachusetts | 53 | 113 | $390,915 | $277,353 |
| Maryland | 45 | 149 | $84,474 | $78,775 |
| Ohio | 40 | 78 | $347,197 | $218,130 |
| Tennessee | 37 | 94 | $245,025 | $238,135 |
| Wisconsin | 33 | 57 | $219,416 | $180,472 |
| Alabama | 29 | 57 | $171,828 | $144,852 |
| Minnesota | 23 | 56 | $168,050 | $135,955 |
| Colorado | 22 | 49 | $124,416 | $80,808 |
| Kentucky | 19 | 54 | $220,900 | $187,770 |
| Missouri | 19 | 31 | $145,217 | $103,536 |
| Rhode Island | 17 | 36 | $107,301 | $74,765 |
By industry
- Construction: 1,195 inspections
- Manufacturing: 21 inspections
- Wholesale trade: 7 inspections
- Administrative & waste services: 6 inspections
- Other services: 5 inspections
- Accommodation & food services: 3 inspections
- Retail trade: 3 inspections
- Real estate & rental: 2 inspections
Recently cited establishments
Alleged violations. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
| Establishment | Location | Issued | Alleged items | Initial penalty | Current penalty | Status and deadlines | Source |
|---|---|---|---|---|---|---|---|
| H Jimenez Construction LLC | Lexington, NC | Oct 15, 2026 | 2 | $6,620 | $6,620 | Final orderAbatement due Oct 19, 2026 | osha.gov #349119529 |
| Sifredis Drywall LLC | Williamstown, KY | Oct 14, 2026 | 3 | $10,500 | $10,500 | Final orderAbatement due Nov 2, 2026 | osha.gov #348971383 |
| Tecoyame Fraimer LLC | King, NC | Oct 12, 2026 | 4 | $1,300 | $1,300 | Final orderAbatement due Oct 16, 2026 | osha.gov #349135632 |
| Name withheld (individual) | King, NC | Oct 12, 2026 | 3 | $1,300 | $1,300 | Final orderAbatement due Oct 16, 2026 | osha.gov #349135616 |
| St Buildings | Knob Noster, MO | Oct 9, 2026 | 1 | $4,965 | $4,965 | OpenContest deadline ~Nov 2, 2026 (est.) | osha.gov #349131979 |
| Schnippel Construction Inc. | Williamstown, KY | Oct 9, 2026 | 3 | $14,700 | $8,820 | Informal settlementAbatement due Oct 27, 2026 | osha.gov #348951864 |
| Robert Kierce Contracting, Inc. | Foxboro, MA | Oct 9, 2026 | 1 | $3,972 | $1,000 | Informal settlementAbatement due Dec 1, 2026 | osha.gov #349062562 |
| S. Lewis Lionberger Construction Company | Salisbury, MD | Oct 9, 2026 | 3 | $1,925 | $1,925 | Final order | osha.gov #349123893 |
| Laflamme Stucco N Stone Inc. | Minneapolis, MN | Oct 8, 2026 | 2 | $2,500 | $2,500 | Final orderAbatement due Oct 12, 2026 | osha.gov #349187781 |
| Marttine Management Group | Paterson, NJ | Oct 7, 2026 | 2 | $9,930 | $9,930 | OpenContest deadline ~Oct 29, 2026 (est.) | osha.gov #348942384 |
| Name withheld (individual) | Everman, TX | Oct 7, 2026 | 1 | $2,128 | $2,128 | Final orderAbatement due Nov 5, 2026 | osha.gov #349108522 |
| DC Masonry Inc. | Carson City, NV | Oct 7, 2026 | 2 | $7,094 | $3,547 | Informal settlement | osha.gov #349056580 |
| Great Place Construction, LLC | Sioux Falls, SD | Oct 5, 2026 | 2 | $4,502 | $2,251 | Informal settlementAbatement due Nov 5, 2026 | osha.gov #348915091 |
| Portillo Construction Inc. | Concord, NC | Oct 5, 2026 | 3 | $1,300 | $1,300 | Final orderAbatement due Oct 9, 2026 | osha.gov #348886672 |
| Amorim Construction Corp. | Carmel, NY | Oct 2, 2026 | 3 | $9,648 | $9,648 | OpenAbatement due Oct 8, 2026Contest deadline ~Oct 26, 2026 (est.) | osha.gov #348872995 |
| AGN Construction Corp. | Bannockburn, IL | Oct 2, 2026 | 1 | $2,838 | $2,838 | Informal settlementAbatement due Oct 22, 2026 | osha.gov #349056036 |
| Goose Construction | Papillion, NE | Oct 2, 2026 | 1 | $3,972 | $3,972 | Final order | osha.gov #348984865 |
| Heyn Brothers Construction Corp. | Lake Crystal, MN | Oct 1, 2026 | 1 | $250 | $250 | ContestedAbatement due Oct 5, 2026Contested Oct 12, 2026 | osha.gov #349163881 |
| Voestalpine Clad Rack Solutions, LLC | Fort Worth, TX | Oct 1, 2026 | 3 | $49,650 | $49,650 | ContestedAbatement due Oct 30, 2026Contested Oct 22, 2026 | osha.gov #348854043 |
| Joseph Birkenheier Tuckpointing and Masonry, Inc. | Glencoe, IL | Oct 1, 2026 | 2 | $42,557 | $26,000 | Informal settlement | osha.gov #349038398 |
| Voss USA LLC | Fort Worth, TX | Oct 1, 2026 | 4 | $215,164 | $215,164 | ContestedAbatement due Oct 30, 2026Contested Oct 21, 2026 | osha.gov #348853151 |
| Heidtke Builders Inc. | Cedarburg, WI | Oct 1, 2026 | 1 | $2,838 | $1,987 | Informal settlementAbatement due Oct 28, 2026 | osha.gov #348933631 |
| Name withheld (individual) | Middleton, WI | Sep 30, 2026 | 1 | $2,837 | $1,702 | Informal settlementAbatement due Oct 8, 2026 | osha.gov #348932161 |
| JPL Construction Inc. | Philadelphia, PA | Sep 30, 2026 | 2 | $7,944 | $7,944 | OpenContest deadline ~Oct 22, 2026 (est.) | osha.gov #348904111 |
| TBR Holding LLC | San Juan, PR | Sep 30, 2026 | 3 | $23,644 | $14,186 | OpenAbatement due Oct 26, 2026Contest deadline ~Oct 22, 2026 (est.) | osha.gov #348857038 |
| Aderholt Masonry, Inc. | Florence, AL | Sep 30, 2026 | 1 | $319 | $319 | Final orderAbatement due Oct 27, 2026 | osha.gov #348848730 |
| Fite Construction Company, LLC | Florence, AL | Sep 30, 2026 | 1 | $956 | $956 | Final order | osha.gov #348846254 |
| Randy Brown Builders LLC | Shelbyville, KY | Sep 30, 2026 | 3 | $0 | $0 | Informal settlementAbatement due Oct 5, 2026 | osha.gov #348945932 |
| Service Scaffold Company Inc. | Hawthorne, NY | Sep 30, 2026 | 1 | $11,585 | $11,585 | ContestedContested Oct 26, 2026 | osha.gov #348886193 |
| Wesley & Ted Corporation | Chicago, IL | Sep 30, 2026 | 3 | $32,345 | $32,345 | ContestedContested Oct 13, 2026 | osha.gov #349113290 |
| S.barzola Construction | Braintree, MA | Sep 30, 2026 | 1 | $3,972 | $1,986 | Informal settlementAbatement due Oct 8, 2026 | osha.gov #348990029 |
| Choice Masonry, Incorporated | Frankfort, IL | Sep 30, 2026 | 4 | $10,782 | $5,315 | Informal settlementAbatement due Nov 4, 2026 | osha.gov #349124461 |
| Managed Masonry | Lima, OH | Sep 30, 2026 | 2 | $5,674 | $2,837 | Informal settlementAbatement due Oct 19, 2026 | osha.gov #348993833 |
| Little Josh Construction LLC | Lake Saint Louis, MO | Sep 29, 2026 | 3 | $7,944 | $4,766 | OpenAbatement due Oct 26, 2026Contest deadline ~Oct 21, 2026 (est.) | osha.gov #348915182 |
| Green Community Development | Sinajana, GU | Sep 29, 2026 | 3 | $27,666 | $13,833 | Informal settlementAbatement due Oct 9, 2026 | osha.gov #349102939 |
| M. G. Oil Company | Rapid City, SD | Sep 29, 2026 | 2 | $0 | $0 | Informal settlementAbatement due Oct 30, 2026 | osha.gov #348862962 |
| Storm Works Roofing & Restoration, Inc. | Charlestown, MA | Sep 29, 2026 | 1 | $2,838 | $2,838 | ContestedContested Oct 7, 2026 | osha.gov #349112953 |
| WM Contractor Inc. | Charlestown, MA | Sep 29, 2026 | 2 | $5,108 | $5,108 | Final orderAbatement due Nov 19, 2026 | osha.gov #349112995 |
| Euro Castle Construction Corp. | Richmond Hill, NY | Sep 28, 2026 | 2 | $23,170 | $23,170 | ContestedContested Oct 21, 2026 | osha.gov #348855412 |
| Gehman Iron Inc. | Knoxville, PA | Sep 28, 2026 | 1 | $0 | $0 | Informal settlement | osha.gov #348919887 |
Notable employers cited under 1926.451
Largest proposed penalties under 1926.451 in the last 12 months (items under this standard only), among establishments with a detailed history page. Alleged violations; see each page for status and current penalty.
- Thomas Builders of Virginia, Inc.Roanoke, VA · $537,849 initial (proposed) · 7 alleged willful or repeat · 9 inspections on record
- Voss USA LLCFort Worth, TX · $215,164 initial (proposed) · 1 alleged willful or repeat
- Creative Masonry, Inc.Jonesborough, TN · $131,400 initial (proposed) · 2 alleged willful or repeat
- Ojvejv, Inc.Papillion, NE · $97,314 initial (proposed) · 2 alleged willful or repeat
- Argen Contracting, Inc.Papillion, NE · $95,329 initial (proposed) · 1 alleged willful or repeat
- Pro Drywall Inc. dba Pro Drywall - Painting Inc.Elk River, MN · $75,000 initial (proposed)
- Dan Lepore & Sons CompanyPhiladelphia, PA · $49,650 initial (proposed) · 2 inspections on record
- Best Bid, Inc.Madison Heights, VA · $48,195 initial (proposed)
- Joseph Birkenheier Tuckpointing and Masonry, Inc.Glencoe, IL · $42,557 initial (proposed) · 3 alleged willful or repeat · 2 inspections on record
- Pearson Custom Homes, LLCHampton, NH · $41,710 initial (proposed) · 4 alleged willful or repeat · 2 inspections on record
Often cited together
- 1926.501 Fall Protection (363 shared inspections)
- 1926.454 Scaffold Training (293 shared inspections)
- 1926.1053 Ladder Safety (221 shared inspections)
- 1926.452 Specific Scaffold Types (214 shared inspections)
- 1926.102 Eye and Face Protection (172 shared inspections)
- 1926.100 Hard Hats (168 shared inspections)
- 1926.503 Fall Protection Training (162 shared inspections)
- 1926.20 Construction Safety Programs (87 shared inspections)
Questions
What does OSHA standard 1926.451 require?
This is the core scaffold standard for construction, setting requirements for capacity, platform construction, footing, access, use, and fall protection. Scaffolds must support their own weight and at least four times the intended load, platforms must be fully planked, and supported scaffolds must rest on base plates and mud sills. Workers must have safe access, scaffolds must be inspected by a competent person before each shift, and fall protection is required above 10 feet.
How often was 1926.451 cited in the last 12 months?
In the public data as of November 16, 2026, 1926.451 (Scaffold Safety) appeared in 1,252 inspections with citations issued between Nov 16, 2025 and Nov 16, 2026, covering 2,751 alleged violation items.
Which part of 1926.451 is cited most?
1926.451(g)(1) was the most-cited paragraph, with 422 items: Employees on scaffolds more than 10 feet above a lower level must be protected from falling.
Which states cite 1926.451 most often?
The most citations under 1926.451 in this period were issued in New Jersey, Illinois, Texas.
What is the typical penalty for a 1926.451 violation?
Counting each citation once, the median initial (proposed) penalty was $3,972 per citation; the median current penalty after settlements and amendments was $2,940. OSHA often groups related violations (items such as 01002A and 01002B) into one citation with one penalty, recorded on one item and sometimes under another standard, so these figures combine the grouped items. 23% of items carried no separate penalty, usually because OSHA grouped them with a related violation in the same citation, which carries the penalty. Totals for the items under 1926.451: $10,409,817 proposed, $8,631,470 current. Penalties vary by violation type, employer size and history, and State Plans set their own amounts.
Are 1926.451 citations final?
Not necessarily. A citation is an allegation until it becomes a final order. 9% of these items were contested, and many others were changed in settlements. Each listing shows its current status and a link to the official record.