Freddy's Roofing and Home Repair, LLC: OSHA inspection records
Data as of November 16, 2026
$21,281initial (proposed) penalties, $10,640 current
1 alleged violation item across 1 cited inspection in the last 12 months, including 1 repeat.
Status1 informal settlementinspection status per the public record
Get Georgia alerts- Location
- Sanctuary Drive Homesites 60-62, Mcdonough, GA 30253
- Industry
- Construction (NAICS 238160, Foundation, Structure, and Building Exterior Contractors)
- Jurisdiction
- Georgia, Federal OSHA
- Cited inspections
- 1 in the last 12 months
- Inspection history
- Inspected 2 times since 2025; 2 of those inspections had citations; 2 alleged willful or repeat items on record.
Alleged violations. Citations issued by federal OSHA. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
Inspection 348741448
Informal settlement Resolved through an informal settlement agreement.
- Opened
- February 10, 2026
- Citations issued
- March 19, 2026
- Final order date
- April 13, 2026 (per OSHA record)
- Official record
- osha.gov inspection detail #348741448 · OSHA Establishment Search (if osha.gov shows its homepage, search inspection 348741448)
| Citation | Standard | Type | Issued | Abatement due | Initial penalty | Current penalty | Status |
|---|---|---|---|---|---|---|---|
| Citation 01001 | 1926.501(b)(13) Fall Protection | Repeat | Mar 19, 2026 | — | $21,281 | $10,640 | Informal settlement |
Inspection history since 2025
OSHA recorded 2 inspections at this establishment name and ZIP code since 2025, the most recent opened Feb 10, 2026. 2 of them had citations, and 1 earlier inspection had alleged willful or repeat items (1 in all). 1 earlier inspection with citations opened in the five years before the most recent one; OSHA's repeat classification generally looks back five years.
Inspections opened per year. Same establishment name and ZIP code in DOL's full inspection history; different spellings or addresses of one business are not joined.
| Inspection | Opened | Alleged items | Initial penalty | Source |
|---|---|---|---|---|
| Inspection 348741448 | Feb 10, 2026 | 1 (1 willful or repeat) | $21,281 | osha.gov #348741448 |
| Inspection 348336108 | Jun 26, 2025 | 1 (1 willful or repeat) | $14,186 | osha.gov #348336108 |
Compared with similar employers
Among 421 other Foundation, Structure, and Building Exterior Contractors (NAICS 2381) establishments in Georgia with citations issued in the last 12 months, this establishment's proposed penalties ($21,281) were higher than 95% of them, and its 1 alleged item more than 0%.
| Last 12 months | This establishment | Peer median | Higher than |
|---|---|---|---|
| Initial (proposed) penalties | $21,281 | $4,965 | 95% |
| Alleged violation items | 1 | 2 | 0% |
Standards cited most in this industry
Share of the 8,181 cited inspections in Foundation, Structure, and Building Exterior Contractors (NAICS 2381) nationwide (last 12 months) that included each standard; the ones marked were also cited here.
| Standard | Topic | Share of inspections | Cited here |
|---|---|---|---|
| 1926.501 | Fall Protection | 61% | Yes |
| 1926.503 | Fall Protection Training | 24% | |
| 1926.1053 | Ladder Safety | 23% | |
| 1926.102 | Eye and Face Protection | 19% | |
| 1926.451 | Scaffold Safety | 11% | |
| 1926.100 | Hard Hats | 9% |
Other construction employers cited in Georgia
- MR. Framing Solution LLCMcdonough, issued Jul 22, 2026, $13,620 initial (proposed)
- Mister Framing Solutions, LLCMcdonough, issued Aug 19, 2026, $2,837 initial (proposed)
- Chavez Masonry Incorporated, Inc.Mcdonough, issued Jul 30, 2026, $13,620 initial (proposed)
- All Duck, LLCMcdonough, issued Jul 28, 2026, $2,837 initial (proposed)
- Mav Masonry Construction, Inc.Mcdonough, issued Jun 12, 2026, $7,944 initial (proposed)
- Los Moras Framing LLCMcdonough, issued May 12, 2026, $3,972 initial (proposed)
Related
Is something on this page wrong or out of date? Request a correction or removal.