HC Framing LP: OSHA inspection records
Data as of November 16, 2026
$4,815initial (proposed) penalties
5 alleged violation items across 1 cited inspection in the last 12 months, including 4 serious.
Status1 final orderinspection status per the public record
Get Washington alerts- Location
- 1601 19Th Ave Unit 14, Seattle, WA 98122
- Industry
- Construction (NAICS 238130, Foundation, Structure, and Building Exterior Contractors)
- Jurisdiction
- Washington, State plan
- Cited inspections
- 1 in the last 12 months
- Inspection history
- Inspected 2 times since 2022; 2 of those inspections had citations.
Alleged violations. Citations issued by a State Plan office. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
Inspection 348938697
Final order The citation items have become a final order.
- Opened
- May 13, 2026
- Citations issued
- August 21, 2026
- Abatement due
- September 23, 2026 (per OSHA record)
- Final order date
- August 21, 2026 (per OSHA record)
- Official record
- osha.gov inspection detail #348938697 · OSHA Establishment Search (if osha.gov shows its homepage, search inspection 348938697)
| Citation | Standard | Type | Issued | Abatement due | Initial penalty | Current penalty | Status |
|---|---|---|---|---|---|---|---|
| Citation 01001 | 296-880-30005(2)(A) | Serious | Aug 21, 2026 | — | $963 | $963 | Final order |
| Citation 01002 | 296-880-20005(4) | Serious | Aug 21, 2026 | — | $1,926 | $1,926 | Final order |
| Citation 01003 | 296-876-40050(1) | Serious | Aug 21, 2026 | — | $642 | $642 | Final order |
| Citation 01004 | 296-155-477(3)(A) | Serious | Aug 21, 2026 | — | $1,284 | $1,284 | Final order |
| Citation 02001 | 296-880-10015(5) | Other-than-serious | Aug 21, 2026 | Sep 23, 2026 | $0 | $0 | Final order |
Inspection history since 2022
OSHA recorded 2 inspections at this establishment name and ZIP code since 2022, the most recent opened May 13, 2026. 2 of them had citations. 1 earlier inspection with citations opened in the five years before the most recent one; OSHA's repeat classification generally looks back five years.
Inspections opened per year. Same establishment name and ZIP code in DOL's full inspection history; different spellings or addresses of one business are not joined.
| Inspection | Opened | Alleged items | Initial penalty | Source |
|---|---|---|---|---|
| Inspection 348938697 | May 13, 2026 | 5 | $4,815 | osha.gov #348938697 |
| Inspection 346385768 | Dec 12, 2022 | 3 | $4,400 | osha.gov #346385768 |
Compared with similar employers
Among 397 other Foundation, Structure, and Building Exterior Contractors (NAICS 2381) establishments in Washington with citations issued in the last 12 months, this establishment's proposed penalties ($4,815) were higher than 59% of them, and its 5 alleged items more than 66%.
| Last 12 months | This establishment | Peer median | Higher than |
|---|---|---|---|
| Initial (proposed) penalties | $4,815 | $3,852 | 59% |
| Alleged violation items | 5 | 3 | 66% |
Standards cited most in this industry
Share of the 8,181 cited inspections in Foundation, Structure, and Building Exterior Contractors (NAICS 2381) nationwide (last 12 months) that included each standard.
| Standard | Topic | Share of inspections | Cited here |
|---|---|---|---|
| 1926.501 | Fall Protection | 61% | |
| 1926.503 | Fall Protection Training | 24% | |
| 1926.1053 | Ladder Safety | 23% | |
| 1926.102 | Eye and Face Protection | 19% | |
| 1926.451 | Scaffold Safety | 11% | |
| 1926.100 | Hard Hats | 9% |
Other construction employers cited in Washington
- JC Roofing and Exterior Services LLCSeattle, issued Sep 25, 2026, $2,406 initial (proposed)
- Nuuco Electric CompanySeattle, issued Aug 13, 2026
- DHC Construction LLCSeattle, issued Aug 5, 2026, $243,143 initial (proposed)
- Limelite Development LLCSeattle, issued Jun 17, 2026, $642 initial (proposed)
- HS Foundations LLCSeattle, issued Jun 16, 2026, $2,889 initial (proposed)
- Rain City Industries LLCSeattle, issued May 20, 2026, $5,336 initial (proposed)
Related
Is something on this page wrong or out of date? Request a correction or removal.