1926.1051 Stairway and Ladder Access: citations, penalties and recently cited employers
Data as of November 16, 2026 · citations issued Nov 16, 2025 to Nov 16, 2026
Wherever a construction worker must move between levels with a break in elevation of 19 inches or more and no ramp, runway, embankment, or personnel hoist is available, the employer must provide a stairway or ladder. When only one point of access exists between levels, it must be kept clear, and employers must install required fall protection for stairs and ladders before work requiring them begins.
OSHA often groups related violations into one citation (items such as 01002A and 01002B) and records the group's penalty on one item, sometimes under another standard. The medians count each citation with an item under 1926.1051 once, at the group's combined penalty. 16% of items carried no separate penalty: 24% of those were grouped with a related violation in the same citation, which carries the penalty, and the rest were cited with no proposed fine (mostly other-than-serious items).
What the standard requires
- Provide a stairway or ladder at breaks in elevation of 19 inches or more
- Keep at least one point of access clear for free passage
- Provide extra access when only ladders serve 25 or more workers
- Install required stair and ladder protections before work begins
Hazards it addresses
- Falls when climbing improvised access
- Trapping without clear egress
Cited in building construction, excavation, and work on elevated decks and floors.
Plain-language summary written for this site; it is not the regulatory text and not legal advice. Read the official text at eCFR.
Citations by month
Inspections with citations issued, by month of issuance. Hatched months are incomplete: citations reach the public data about a month after issuance.
Most-cited paragraphs
| Paragraph | What it covers | Items | Inspections | Median proposed penalty per citation |
|---|---|---|---|---|
| 1926.1051(a) | A stairway or ladder must be provided at all personnel points of access with a break in elevation of 19 inches or more. | 126 | 126 | $2,838 |
| 1926.1051(b) | Required stairway and ladder fall protection systems must be installed before employees begin work that requires them. | 2 | 2 | $3,830 |
Penalties
Across 128 alleged items, OSHA and state-plan offices proposed $522,974 in initial penalties. The current total in the public data is $457,819, 12% lower after settlements, contests and amendments.
By violation type: Serious 78%; Other-than-serious 16%; Repeat 5%; Willful 1%.
Trends and abatement
From December 2025 to August 2026 (months with complete data), 108 inspections citing 1926.1051 had citations first issued, 26% fewer than in the same months a year earlier (146).
Abatement time: for the 81 alleged items under 1926.1051 with an abatement date, OSHA set a median of 9 days from issuance to correct the hazard (a quarter got more than 25 days).
Penalty distribution
Half of the initial (proposed) penalties per citation (grouped items combined) were $2,838 or less; a quarter were above $4,256, and one in ten above $10,683.
| Initial (proposed) penalty per citation (grouped items combined) | Count | Share |
|---|---|---|
| Under $1,000 | 27 | 21% |
| $1,000 to $4,999 | 77 | 60% |
| $5,000 to $14,999 | 15 | 12% |
| $15,000 to $49,999 | 7 | 5% |
| $50,000 or more | 2 | 2% |
Industries cited most under 1926.1051
| Industry (NAICS) | Cited inspections | Share |
|---|---|---|
| Foundation, Structure, and Building Exterior Contractors 2381 | 110 | 86% |
| Nonresidential Building Construction 2362 | 7 | 5% |
| Residential Building Construction 2361 | 4 | 3% |
| Utility System Construction 2371 | 1 | 1% |
| Highway, Street, and Bridge Construction 2373 | 1 | 1% |
| Building Finishing Contractors 2383 | 1 | 1% |
| Other Specialty Trade Contractors 2389 | 1 | 1% |
| Cement and Concrete Product Manufacturing 3273 | 1 | 1% |
Citations by state
| State | Inspections cited | Items | Initial penalties | Current penalties |
|---|---|---|---|---|
| North Carolina | 21 | 21 | $35,408 | $26,805 |
| Texas | 19 | 19 | $77,683 | $58,740 |
| Georgia | 16 | 16 | $43,976 | $40,005 |
| Illinois | 15 | 15 | $116,897 | $106,764 |
| Maryland | 14 | 14 | $750 | $750 |
| Virginia | 7 | 7 | $6,865 | $6,657 |
| New Jersey | 5 | 5 | $25,109 | $18,406 |
| Arizona | 4 | 4 | $34,287 | $34,287 |
| Massachusetts | 4 | 4 | $11,970 | $7,457 |
| New Hampshire | 3 | 3 | $26,957 | $26,957 |
| New York | 3 | 3 | $13,619 | $10,640 |
| Pennsylvania | 3 | 3 | $10,877 | $6,837 |
| Wisconsin | 3 | 3 | $11,425 | $11,425 |
| Puerto Rico | 2 | 2 | $78,275 | $78,275 |
| Alabama | 1 | 1 | $4,965 | $2,979 |
| Delaware | 1 | 1 | $4,256 | $4,256 |
| Guam | 1 | 1 | $7,035 | $4,924 |
| Hawaii | 1 | 1 | $0 | $0 |
| Kentucky | 1 | 1 | $3,500 | $3,500 |
| Minnesota | 1 | 1 | $150 | $90 |
By industry
- Construction: 125 inspections
- Manufacturing: 2 inspections
- Administrative & waste services: 1 inspections
Recently cited establishments
Alleged violations. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
| Establishment | Location | Issued | Alleged items | Initial penalty | Current penalty | Status and deadlines | Source |
|---|---|---|---|---|---|---|---|
| Jsolis Construction LLC | Winston Salem, NC | Oct 2, 2026 | 1 | $3,900 | $3,000 | Informal settlementAbatement due Oct 6, 2026 | osha.gov #349125021 |
| Two Friends Construction LLC | Savannah, GA | Sep 30, 2026 | 1 | $2,270 | $1,589 | Informal settlement | osha.gov #348993791 |
| Name withheld (individual) | Monroe, NC | Sep 29, 2026 | 1 | $1,300 | $1,300 | Final orderAbatement due Oct 5, 2026 | osha.gov #349086009 |
| Prata Construction LLC | Jersey City, NJ | Sep 28, 2026 | 1 | $4,256 | $4,256 | OpenAbatement due Oct 19, 2026Contest deadline ~Oct 20, 2026 (est.) | osha.gov #348846833 |
| Commonwealth Construction Management, LLC | Midlothian, VA | Sep 22, 2026 | 1 | $720 | $720 | Informal settlement | osha.gov #349041434 |
| Morris Industries, Inc. | Midlothian, VA | Sep 22, 2026 | 1 | $2,885 | $2,885 | Final order | osha.gov #349041426 |
| B & J Steel Construction, Inc. | Midlothian, VA | Sep 22, 2026 | 1 | $720 | $720 | Final order | osha.gov #349041418 |
| LG Roofing Service LLC | Washington Township, OH | Sep 18, 2026 | 1 | $4,965 | $4,965 | Final orderAbatement due Oct 23, 2026 | osha.gov #349166884 |
| Home Advantage Plus, LLC | Baldwinsville, NY | Sep 18, 2026 | 1 | $4,256 | $1,277 | Informal settlementAbatement due Oct 15, 2026 | osha.gov #349165662 |
| Name withheld (individual) | Annapolis, MD | Sep 15, 2026 | 1 | $0 | $0 | OpenAbatement due Sep 23, 2026Contest deadline ~Oct 6, 2026 (est.) | osha.gov #349051326 |
| Gag Framing, LLC | Winston Salem, NC | Sep 8, 2026 | 1 | $1,300 | $1,300 | Final orderAbatement due Sep 14, 2026 | osha.gov #349067009 |
| M-4 Carpentry, Corp. | Round Lake Beach, IL | Sep 3, 2026 | 1 | $2,270 | $2,270 | Final orderAbatement due Sep 30, 2026 | osha.gov #348831652 |
| Name withheld (individual) | Royse City, TX | Sep 2, 2026 | 1 | $3,972 | $3,972 | OpenAbatement due Sep 29, 2026Contest deadline ~Sep 24, 2026 (est.) | osha.gov #348875816 |
| Name withheld (individual) | Princeton, TX | Sep 2, 2026 | 1 | $3,972 | $3,972 | OpenAbatement due Sep 29, 2026Contest deadline ~Sep 24, 2026 (est.) | osha.gov #348875683 |
| EPT Construction LLC | Linwood, NC | Sep 1, 2026 | 1 | $0 | $0 | Final orderAbatement due Sep 8, 2026 | osha.gov #349048017 |
| Ac_are Construction Services LLC | Frederick, MD | Sep 1, 2026 | 1 | $0 | $0 | Final orderAbatement due Sep 10, 2026 | osha.gov #348987033 |
| Name withheld (individual) | Anna, TX | Aug 31, 2026 | 1 | $5,958 | $5,958 | OpenAbatement due Sep 25, 2026Contest deadline ~Sep 22, 2026 (est.) | osha.gov #348822552 |
| MJ and Sons Construction Corp. | Lodi, NJ | Aug 24, 2026 | 1 | $4,965 | $3,227 | Informal settlement | osha.gov #348975798 |
| 4 Season Builders LLC | Hasbrouck Heights, NJ | Aug 24, 2026 | 1 | $4,965 | $2,979 | Informal settlement | osha.gov #349038547 |
| Name withheld (individual) | Mesquite, TX | Aug 21, 2026 | 1 | $3,972 | $3,972 | Final orderAbatement due Sep 17, 2026 | osha.gov #348836727 |
| Name withheld (individual) | Linwood, NC | Aug 21, 2026 | 1 | $1,250 | $700 | Informal settlementAbatement due Aug 25, 2026 | osha.gov #349047969 |
| Force Home Improvement Inc. | Concord, NH | Aug 20, 2026 | 1 | $2,838 | $2,838 | Final orderAbatement due Aug 26, 2026 | osha.gov #349076984 |
| Paramount Roofing LLC | Concord, NH | Aug 20, 2026 | 1 | $2,838 | $2,838 | Final orderAbatement due Aug 26, 2026 | osha.gov #349073700 |
| J G Rangel Construction | Mesquite, TX | Aug 19, 2026 | 1 | $3,972 | $2,383 | Informal settlementAbatement due Sep 15, 2026 | osha.gov #348836701 |
| Tongue - Groove LLC | Wrightsville Beach, NC | Aug 14, 2026 | 1 | $1,950 | $1,267 | Informal settlementAbatement due Aug 18, 2026 | osha.gov #349007757 |
| Kupferschmid Construction, Inc. dba Integrabuild | Peoria, IL | Aug 5, 2026 | 1 | $2,270 | $1,135 | Informal settlementAbatement due Aug 14, 2026 | osha.gov #349060350 |
| Mejia Construction LLC | Savannah, GA | Jul 29, 2026 | 1 | $3,405 | $3,405 | Final order | osha.gov #348894759 |
| Carcamo's Construction LLC | Ludowici, GA | Jul 27, 2026 | 1 | $2,837 | $2,837 | Final orderAbatement due Aug 20, 2026 | osha.gov #348881038 |
| Name withheld (individual) | Forney, TX | Jul 24, 2026 | 1 | $3,972 | $3,972 | Final orderAbatement due Aug 19, 2026 | osha.gov #348821562 |
| Name withheld (individual) | Crandall, TX | Jul 24, 2026 | 1 | $3,972 | $3,972 | Final orderAbatement due Aug 19, 2026 | osha.gov #348821729 |
| James N. Gray Company | Rockville, VA | Jul 20, 2026 | 1 | $1,040 | $832 | Informal settlement | osha.gov #348858192 |
| Hill Farm Homes, LLC | Leechburg, PA | Jul 17, 2026 | 1 | $4,965 | $2,500 | Informal settlementAbatement due Jul 29, 2026 | osha.gov #349057224 |
| Area Erectors, Inc. | Glencoe, IL | Jul 15, 2026 | 1 | $14,188 | $12,000 | Informal settlementAbatement due Aug 10, 2026 | osha.gov #348780529 |
| Apex Framing LLC | Webster, TX | Jul 13, 2026 | 1 | $2,838 | $2,838 | Final orderAbatement due Aug 6, 2026 | osha.gov #349006387 |
| Jca Construction LLC | Spring Valley, NY | Jul 8, 2026 | 1 | $5,958 | $5,958 | Final order | osha.gov #348774159 |
| Puerto Rico Drilling & Supplys Inc. | Carolina, PR | Jul 6, 2026 | 1 | $8,275 | $8,275 | OpenAbatement due Jul 27, 2026Contest deadline ~Jul 27, 2026 (est.) | osha.gov #348751207 |
| Mid-State Investments, LLC | Clarksville, TN | Oct 9, 2026 | 1 | $600 | $600 | Final orderAbatement due Jul 13, 2026 | osha.gov #348955089 |
| Csa Construction, Inc. | Manvel, TX | Jun 29, 2026 | 1 | $14,895 | $0 | Informal settlementAbatement due Jul 17, 2026 | osha.gov #348663030 |
| Sakoda Construction LLC | Kailua Kona, HI | Jun 26, 2026 | 1 | $0 | $0 | Informal settlement | osha.gov #348971169 |
| B & M Contractor Corporation | Sicklerville, NJ | Jun 26, 2026 | 1 | $4,965 | $4,965 | Final orderAbatement due Jul 2, 2026 | osha.gov #348938846 |
Notable employers cited under 1926.1051
Largest proposed penalties under 1926.1051 in the last 12 months (items under this standard only), among establishments with a detailed history page. Alleged violations; see each page for status and current penalty.
- Punta Borinquen Precast Corp.San Sebastian, PR · $70,000 initial (proposed) · 1 alleged willful or repeat
- Miller Carpentry, LLCMahomet, IL · $37,451 initial (proposed) · 18 alleged willful or repeat · 4 inspections on record
- RS Framing Experts Inc.Merrimack, NH · $21,281 initial (proposed) · 4 alleged willful or repeat
- Miller Carpentry, LLCUrbana, IL · $17,023 initial (proposed) · 4 alleged willful or repeat
- Timberview Builders LLCUrbana, IL · $17,023 initial (proposed) · 9 alleged willful or repeat · 10 inspections on record
- M&V Framing, LLCBraselton, GA · $6,809 initial (proposed) · 5 alleged willful or repeat · 2 inspections on record
- A&D Framing Corp.Englewood Cliffs, NJ · $5,958 initial (proposed) · 2 alleged willful or repeat · 3 inspections on record
- Jca Construction LLCSpring Valley, NY · $5,958 initial (proposed) · 2 alleged willful or repeat
- 4 Season Builders LLCHasbrouck Heights, NJ · $4,965 initial (proposed) · 2 inspections on record
- MJ and Sons Construction Corp.Lodi, NJ · $4,965 initial (proposed) · 1 alleged willful or repeat
Often cited together
- 1926.501 Fall Protection (108 shared inspections)
- 1926.503 Fall Protection Training (51 shared inspections)
- 1926.102 Eye and Face Protection (47 shared inspections)
- 1926.1053 Ladder Safety (40 shared inspections)
- 1926.100 Hard Hats (22 shared inspections)
- 1926.20 Construction Safety Programs (22 shared inspections)
- 1926.1060 Ladder and Stair Training (14 shared inspections)
- 1926.451 Scaffold Safety (13 shared inspections)
Questions
What does OSHA standard 1926.1051 require?
Wherever a construction worker must move between levels with a break in elevation of 19 inches or more and no ramp, runway, embankment, or personnel hoist is available, the employer must provide a stairway or ladder. When only one point of access exists between levels, it must be kept clear, and employers must install required fall protection for stairs and ladders before work requiring them begins.
How often was 1926.1051 cited in the last 12 months?
In the public data as of November 16, 2026, 1926.1051 (Stairway and Ladder Access) appeared in 128 inspections with citations issued between Nov 16, 2025 and Nov 16, 2026, covering 128 alleged violation items.
Which part of 1926.1051 is cited most?
1926.1051(a) was the most-cited paragraph, with 126 items: A stairway or ladder must be provided at all personnel points of access with a break in elevation of 19 inches or more.
Which states cite 1926.1051 most often?
The most citations under 1926.1051 in this period were issued in North Carolina, Texas, Georgia.
What is the typical penalty for a 1926.1051 violation?
Counting each citation once, the median initial (proposed) penalty was $2,838 per citation; the median current penalty after settlements and amendments was $2,442. OSHA often groups related violations (items such as 01002A and 01002B) into one citation with one penalty, recorded on one item and sometimes under another standard, so these figures combine the grouped items. 16% of items carried no separate penalty: 24% of those were grouped with a related violation in the same citation, which carries the penalty, and the rest were cited with no proposed fine (mostly other-than-serious items). Totals for the items under 1926.1051: $522,974 proposed, $457,819 current. Penalties vary by violation type, employer size and history, and State Plans set their own amounts.
Are 1926.1051 citations final?
Not necessarily. A citation is an allegation until it becomes a final order. 4% of these items were contested, and many others were changed in settlements. Each listing shows its current status and a link to the official record.