Data as of October 5, 2026 · citations issued Oct 5, 2025 to Oct 5, 2026

When construction debris is dropped more than 20 feet outside a building's exterior walls, an enclosed chute must be used. Material dropped through floor openings without a chute requires the drop area to be enclosed with barricades and warning signs. Scrap lumber, waste, and rubbish must be removed from the immediate work area as work progresses, and waste must be disposed of safely.

13inspections cited
13alleged violation items
$4,256median initial penalty per item
$2,713median current penalty per item
8%of items contested

What the standard requires

Hazards it addresses

Cited during demolition, roofing tear-offs, and multi-story renovation work.

Plain-language summary written for this site; it is not the regulatory text and not legal advice. Read the official text at eCFR.

Citations by month

Inspections with citations issued, by month of issuance. Hatched months are incomplete: citations reach the public data about a month after issuance.

Most-cited paragraphs

ParagraphWhat it coversItemsInspectionsMedian initial penalty
1926.252(a)An enclosed chute is required when material is dropped more than 20 feet to a point outside the exterior walls.1313$4,256

Penalties

Across 13 alleged items, OSHA and state-plan offices proposed $54,441 in initial penalties. The current total in the public data is $39,010, 28% lower after settlements, contests and amendments.

By violation type: Serious 92%; Other-than-serious 8%.

Citations by state

StateInspections citedItemsInitial penaltiesCurrent penalties
Massachusetts33$11,632$5,674
Arizona22$14,187$14,187
Florida22$9,930$7,944
Ohio22$4,256$2,000
Illinois11$3,972$1,986
New Jersey11$4,256$4,256
Tennessee11$250$250
Wisconsin11$5,958$2,713

By industry

Recently cited establishments

About these records. Citations list alleged violations and proposed penalties. Employers can contest them, and many are reduced or withdrawn in settlement. Each row shows the original and the current penalty and a status label derived from the public data as of October 5, 2026. Check the linked osha.gov page for the official record.

EstablishmentLocationIssuedAlleged itemsInitial penaltyCurrent penaltyStatus and deadlinesSource
EZ Roofing Company LLC Mesa, AZ Aug 13, 2026 1 $4,256 $4,256 OpenAbatement due Aug 16, 2026Contest deadline ~Sep 3, 2026 (est.) osha.gov
J.F. Martinez LLC Hialeah Gardens, FL Aug 3, 2026 1 $4,965 $2,979 Informal settlement osha.gov
Northwestern Builders, LLC dba North West Roofing AZ Mesa, AZ Jul 16, 2026 1 $9,931 $9,931 OpenAbatement due Jul 19, 2026Contest deadline ~Aug 6, 2026 (est.) osha.gov
Gomez Roofing, LLC Lima, OH Jul 9, 2026 1 $4,256 $2,000 Informal settlementAbatement due Jul 22, 2026 osha.gov
Jias Roof LLC Cincinnati, OH Jun 18, 2026 1 $0 $0 Final orderAbatement due Jul 24, 2026 osha.gov
Cristian Builder Pro LLC Bedford, MA Jun 16, 2026 1 $1,702 $1,702 Final orderAbatement due Aug 4, 2026 osha.gov
TLC Pro Roofing LLC Mount Juliet, TN May 18, 2026 1 $250 $250 Final orderAbatement due Jun 1, 2026 osha.gov
3D Mendez Framing Services Inc. Swampscott, MA Mar 25, 2026 1 $3,972 $3,972 Final order osha.gov
A & C Heating & Cooling Corporation Homewood, IL Mar 4, 2026 1 $3,972 $1,986 Informal settlementAbatement due Apr 20, 2026 osha.gov
Myles Construction, LLC Avenel, NJ Feb 5, 2026 1 $4,256 $4,256 ContestedContested Jun 8, 2026 osha.gov
Valen Drywall LLC Kissimmee, FL Jan 8, 2026 1 $4,965 $4,965 Final order osha.gov
JS General Construction and Remodeling PLLC Madison, WI Dec 19, 2025 1 $5,958 $2,713 Informal settlementAbatement due Jan 6, 2026 osha.gov
Ascend Contracting Inc. Lowell, MA Nov 14, 2025 1 $5,958 $0 Informal settlement osha.gov
The 13 most recent inspections citing 1926.252. Penalties shown are for the items under this standard only.

Often cited together

Questions

What does OSHA standard 1926.252 require?

When construction debris is dropped more than 20 feet outside a building's exterior walls, an enclosed chute must be used. Material dropped through floor openings without a chute requires the drop area to be enclosed with barricades and warning signs. Scrap lumber, waste, and rubbish must be removed from the immediate work area as work progresses, and waste must be disposed of safely.

How often was 1926.252 cited in the last 12 months?

In the public data as of October 5, 2026, 1926.252 (Debris Disposal) appeared in 13 inspections with citations issued between Oct 5, 2025 and Oct 5, 2026, covering 13 alleged violation items.

Which part of 1926.252 is cited most?

1926.252(a) was the most-cited paragraph, with 13 items: An enclosed chute is required when material is dropped more than 20 feet to a point outside the exterior walls.

Which states cite 1926.252 most often?

The most citations under 1926.252 in this period were issued in Massachusetts, Arizona, Florida.

What is the typical penalty for a 1926.252 violation?

The median initial (proposed) penalty per item was $4,256; the median current penalty after settlements and amendments was $2,713. Totals: $54,441 proposed, $39,010 current. Penalties vary by violation type, employer size and history, and State Plans set their own amounts.

Are 1926.252 citations final?

Not necessarily. A citation is an allegation until it becomes a final order. 8% of these items were contested, and many others were changed in settlements. Each listing shows its current status and a link to the official record.