1926.502 Fall Protection Systems: citations, penalties and recently cited employers
Data as of November 16, 2026 · citations issued Nov 16, 2025 to Nov 16, 2026
This section sets performance criteria for the fall protection systems required in construction, including guardrails, safety nets, personal fall arrest systems, positioning devices, warning lines, controlled access zones, hole covers, and fall protection plans. For instance, guardrail top rails must be 42 inches high, plus or minus 3 inches, anchorages must support 5,000 pounds per worker, and hole covers must be secured and marked.
OSHA often groups related violations into one citation (items such as 01002A and 01002B) and records the group's penalty on one item, sometimes under another standard. The medians count each citation with an item under 1926.502 once, at the group's combined penalty. 41% of items carried no separate penalty, usually because OSHA grouped them with a related violation in the same citation, which carries the penalty.
What the standard requires
- Build guardrails with top rails at 42 inches and adequate strength
- Use anchorages capable of supporting 5,000 pounds per employee
- Rig personal fall arrest so workers cannot free fall more than 6 feet or hit lower levels
- Secure hole covers and mark them "HOLE" or "COVER"
- Prepare a written, site-specific fall protection plan when used
Hazards it addresses
- Falls when protective systems fail
- Suspension trauma and impact injuries
- Falls through displaced covers
Cited in roofing, framing, and commercial construction where installed systems do not meet specifications.
Plain-language summary written for this site; it is not the regulatory text and not legal advice. Read the official text at eCFR.
Citations by month
Inspections with citations issued, by month of issuance. Hatched months are incomplete: citations reach the public data about a month after issuance.
Most-cited paragraphs
| Paragraph | What it covers | Items | Inspections | Median proposed penalty per citation |
|---|---|---|---|---|
| 1926.502(d)(17) | 143 | 143 | $3,972 | |
| 1926.502(d)(15) | Anchorages for personal fall arrest equipment must support at least 5,000 pounds per employee attached or meet design criteria. | 136 | 136 | $3,972 |
| 1926.502(d)(16)(iii) | Personal fall arrest systems must be rigged so an employee can neither free fall more than 6 feet nor contact any lower level. | 76 | 76 | $3,996 |
| 1926.502(d)(21) | 54 | 54 | $3,760 | |
| 1926.502(d) | 48 | 48 | $3,210 | |
| 1926.502(i)(3) | Covers must be secured when installed to prevent accidental displacement. | 37 | 37 | $3,500 |
| 1926.502(i)(4) | Covers must be color coded or marked with the word "HOLE" or "COVER". | 31 | 31 | $1,200 |
| 1926.502(b)(2) | 29 | 29 | $2,100 | |
| 1926.502(b)(1) | Top edge height of guardrail top rails must be 42 inches plus or minus 3 inches above the walking/working level. | 27 | 27 | $2,065 |
| 1926.502(d)(6)(i) | 26 | 26 | $3,972 | |
| 1926.502(d)(15)(ii) | Anchorages for personal fall arrest equipment must support at least 5,000 pounds per employee attached or meet design criteria. | 21 | 21 | $3,972 |
| 1926.502(f)(1) | 20 | 20 | $2,908 | |
| 1926.502(a)(2) | 19 | 19 | $2,685 | |
| 1926.502(h)(1)(v) | 18 | 18 | $8,466 | |
| 1926.502(b)(3) | 16 | 16 | $3,986 |
Penalties
Across 873 alleged items, OSHA and state-plan offices proposed $2,910,492 in initial penalties. The current total in the public data is $2,321,754, 20% lower after settlements, contests and amendments.
By violation type: Serious 85%; Other-than-serious 11%; Repeat 3%; Willful 1%.
Trends and abatement
From December 2025 to August 2026 (months with complete data), 522 inspections citing 1926.502 had citations first issued, 20% fewer than in the same months a year earlier (656).
Abatement time: for the 422 alleged items under 1926.502 with an abatement date, OSHA set a median of 13 days from issuance to correct the hazard (a quarter got more than 26 days).
Penalty distribution
Half of the initial (proposed) penalties per citation (grouped items combined) were $3,885 or less; a quarter were above $5,426, and one in ten above $11,916.
| Initial (proposed) penalty per citation (grouped items combined) | Count | Share |
|---|---|---|
| Under $1,000 | 89 | 13% |
| $1,000 to $4,999 | 428 | 61% |
| $5,000 to $14,999 | 141 | 20% |
| $15,000 to $49,999 | 39 | 6% |
| $50,000 or more | 5 | 1% |
Industries cited most under 1926.502
| Industry (NAICS) | Cited inspections | Share |
|---|---|---|
| Foundation, Structure, and Building Exterior Contractors 2381 | 461 | 74% |
| Nonresidential Building Construction 2362 | 44 | 7% |
| Residential Building Construction 2361 | 44 | 7% |
| Building Equipment Contractors 2382 | 27 | 4% |
| Building Finishing Contractors 2383 | 17 | 3% |
| Other Specialty Trade Contractors 2389 | 11 | 2% |
| Lumber and Other Construction Materials Merchant Wholesalers 4233 | 4 | 1% |
| Highway, Street, and Bridge Construction 2373 | 3 | <1% |
Citations by state
| State | Inspections cited | Items | Initial penalties | Current penalties |
|---|---|---|---|---|
| Maryland | 75 | 129 | $119,362 | $104,280 |
| Illinois | 61 | 87 | $311,116 | $223,131 |
| Virginia | 41 | 58 | $83,507 | $79,662 |
| Michigan | 40 | 54 | $22,000 | $18,750 |
| Oregon | 39 | 56 | $209,532 | $183,857 |
| New Jersey | 31 | 39 | $221,914 | $208,540 |
| Massachusetts | 25 | 35 | $123,276 | $87,302 |
| Wisconsin | 23 | 25 | $136,099 | $95,168 |
| Georgia | 21 | 24 | $54,238 | $48,166 |
| Pennsylvania | 21 | 28 | $88,188 | $58,389 |
| Ohio | 20 | 24 | $149,855 | $108,653 |
| New York | 19 | 28 | $130,627 | $117,938 |
| Florida | 18 | 21 | $94,322 | $64,923 |
| North Carolina | 16 | 19 | $58,850 | $52,155 |
| Kentucky | 15 | 19 | $120,550 | $108,230 |
| New Hampshire | 15 | 29 | $50,788 | $30,558 |
| Texas | 13 | 17 | $132,400 | $102,879 |
| Tennessee | 12 | 16 | $19,850 | $19,150 |
| Connecticut | 10 | 18 | $172,128 | $141,728 |
| Rhode Island | 10 | 12 | $46,436 | $40,606 |
By industry
- Construction: 609 inspections
- Wholesale trade: 4 inspections
- Manufacturing: 3 inspections
- Administrative & waste services: 3 inspections
- Transportation & warehousing: 2 inspections
- Accommodation & food services: 1 inspections
- Mining, oil & gas: 1 inspections
- Other services: 1 inspections
Recently cited establishments
Alleged violations. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
| Establishment | Location | Issued | Alleged items | Initial penalty | Current penalty | Status and deadlines | Source |
|---|---|---|---|---|---|---|---|
| Van Derhoof Roofing Co., Inc. | North Syracuse, NY | Oct 13, 2026 | 2 | $11,917 | $9,000 | Informal settlementAbatement due Nov 6, 2026 | osha.gov #349180802 |
| Francos Roofing LLC | Kennesaw, GA | Oct 13, 2026 | 1 | $3,972 | $3,972 | OpenAbatement due Nov 10, 2026Contest deadline ~Nov 3, 2026 (est.) | osha.gov #348872706 |
| Lopez Drywall and Framing LLC | Williamstown, KY | Oct 12, 2026 | 1 | $3,500 | $2,100 | Informal settlementAbatement due Oct 30, 2026 | osha.gov #348971391 |
| Schnippel Construction Inc. | Williamstown, KY | Oct 9, 2026 | 1 | $4,900 | $2,940 | Informal settlementAbatement due Oct 27, 2026 | osha.gov #348951864 |
| LK Construction, Inc. | Easton, MD | Oct 9, 2026 | 2 | $0 | $0 | OpenAbatement due Oct 20, 2026Contest deadline ~Nov 2, 2026 (est.) | osha.gov #349082719 |
| Name withheld (individual) | Bismarck, ND | Oct 6, 2026 | 1 | $0 | $0 | Informal settlement | osha.gov #349160234 |
| Versatile Roofing Systems, Inc. | Traverse City, MI | Oct 6, 2026 | 1 | $0 | $0 | Final orderAbatement due Oct 23, 2026 | osha.gov #349153254 |
| The Christman Company | Traverse City, MI | Oct 6, 2026 | 1 | $0 | $0 | Final orderAbatement due Oct 23, 2026 | osha.gov #349153205 |
| C-Team Contracting LLC | Mcminnville, OR | Oct 5, 2026 | 1 | $3,644 | $3,644 | Final order | osha.gov #349135871 |
| C-Team Contracting LLC | Mcminnville, OR | Oct 5, 2026 | 1 | $3,644 | $3,644 | Final order | osha.gov #349127951 |
| Integrity Home Improvement LLC | Staunton, VA | Oct 5, 2026 | 2 | $625 | $438 | Informal settlementAbatement due Nov 9, 2026 | osha.gov #348920422 |
| Midlantic Environmental, Inc. | Highland, NY | Oct 2, 2026 | 1 | $4,965 | $2,979 | Informal settlementAbatement due Oct 15, 2026 | osha.gov #349095349 |
| Name withheld (individual) | Mundelein, IL | Oct 2, 2026 | 2 | $0 | $0 | Informal settlement | osha.gov #349096420 |
| JKN Construction Inc. | Nashua, NH | Oct 2, 2026 | 1 | $5,958 | $0 | Informal settlement | osha.gov #349062620 |
| Voss USA LLC | Fort Worth, TX | Oct 1, 2026 | 3 | $49,650 | $49,650 | ContestedAbatement due Oct 30, 2026Contested Oct 21, 2026 | osha.gov #348853151 |
| C&G General Construction Inc. | Deerfield, IL | Oct 1, 2026 | 1 | $5,958 | $5,958 | Final orderAbatement due Oct 28, 2026 | osha.gov #349018853 |
| Service Scaffold Company Inc. | Hawthorne, NY | Sep 30, 2026 | 1 | $11,585 | $11,585 | ContestedContested Oct 26, 2026 | osha.gov #348886193 |
| Name withheld (individual) | Monroe, NC | Sep 29, 2026 | 2 | $4,965 | $4,965 | Final orderAbatement due Oct 5, 2026 | osha.gov #349086009 |
| J&G Home Improvements LLC | Marlton, NJ | Sep 28, 2026 | 1 | $4,965 | $4,965 | OpenAbatement due Oct 2, 2026Contest deadline ~Oct 20, 2026 (est.) | osha.gov #348920661 |
| International Construction LLC | Sandy, OR | Sep 28, 2026 | 1 | $3,037 | $3,037 | Final orderAbatement due Nov 4, 2026 | osha.gov #349163972 |
| Jayhawk Exteriors, Inc. | Virginia Beach, VA | Sep 25, 2026 | 1 | $0 | $0 | Informal settlement | osha.gov #348881111 |
| Name withheld (individual) | Joliet, IL | Sep 25, 2026 | 1 | $2,270 | $2,270 | OpenAbatement due Nov 13, 2026Contest deadline ~Oct 19, 2026 (est.) | osha.gov #349030254 |
| Munoz General Contracting Corp. | Elmwood Park, NJ | Sep 25, 2026 | 3 | $14,895 | $14,895 | OpenContest deadline ~Oct 19, 2026 (est.) | osha.gov #349061366 |
| Five Star Builders Inc. | Gaston, OR | Sep 24, 2026 | 1 | $8,745 | $8,745 | Final order | osha.gov #349083485 |
| Fast Glass, Inc. | Henderson, NV | Sep 24, 2026 | 1 | $7,035 | $5,628 | Informal settlement | osha.gov #348871393 |
| East River Contracting, LLC | Lennox, SD | Sep 24, 2026 | 2 | $7,236 | $3,618 | Informal settlementAbatement due Oct 27, 2026 | osha.gov #349066217 |
| Diamondback Carport Repair, Inc. | Buckeye, AZ | Sep 24, 2026 | 1 | $8,276 | $8,276 | OpenAbatement due Sep 24, 2026Contest deadline ~Oct 16, 2026 (est.) | osha.gov #349114231 |
| JMC Construction & Carpentry Inc. | Irvington, NY | Sep 23, 2026 | 1 | $3,972 | $3,972 | Final order | osha.gov #349177980 |
| Spider Construction | Jackson, NJ | Sep 22, 2026 | 2 | $17,874 | $17,874 | Final orderAbatement due Sep 28, 2026 | osha.gov #348858093 |
| Fortis Products, LLC | Chattanooga, TN | Sep 22, 2026 | 2 | $4,000 | $3,600 | Informal settlementAbatement due Oct 5, 2026 | osha.gov #348949769 |
| H & H Brown, Incorporated | Chattanooga, TN | Sep 22, 2026 | 2 | $4,000 | $4,000 | Final order | osha.gov #348949702 |
| Name withheld (individual) | North Dighton, MA | Sep 22, 2026 | 1 | $0 | $0 | Final orderAbatement due Nov 12, 2026 | osha.gov #349167338 |
| J.Z. Shirk Construction LLC | Millersville, PA | Sep 21, 2026 | 1 | $21,281 | $7,500 | Informal settlementAbatement due Oct 8, 2026 | osha.gov #348842014 |
| WSC Contractor Import, Inc. | Freehold, NJ | Sep 21, 2026 | 1 | $4,965 | $4,965 | Final orderAbatement due Sep 25, 2026 | osha.gov #348906546 |
| Anderson Pro Painting, Inc. | Dillsburg, PA | Sep 21, 2026 | 1 | $0 | $0 | Informal settlementAbatement due Oct 5, 2026 | osha.gov #348930173 |
| Summit Contracting Group, Inc. | Fairburn, GA | Sep 18, 2026 | 1 | $13,240 | $13,240 | ContestedContested Oct 9, 2026 | osha.gov #348864208 |
| Neighbor Home Improvement LLC | Darien, IL | Sep 18, 2026 | 1 | $0 | $0 | Informal settlementAbatement due Oct 19, 2026 | osha.gov #349102491 |
| Loja Construction Services LLC | La Grange, IL | Sep 18, 2026 | 1 | $0 | $0 | OpenAbatement due Nov 5, 2026Contest deadline ~Oct 9, 2026 (est.) | osha.gov #349000190 |
| Prestige Restoration and Construction LLC | Downers Grove, IL | Sep 17, 2026 | 2 | $0 | $0 | OpenAbatement due Oct 14, 2026Contest deadline ~Oct 8, 2026 (est.) | osha.gov #349121640 |
| DM Construction Services, Inc. | Wellesley, MA | Sep 16, 2026 | 1 | $3,972 | $3,972 | OpenAbatement due Nov 5, 2026Contest deadline ~Oct 7, 2026 (est.) | osha.gov #348841404 |
Notable employers cited under 1926.502
Largest proposed penalties under 1926.502 in the last 12 months (items under this standard only), among establishments with a detailed history page. Alleged violations; see each page for status and current penalty.
- Bone Dry Roofing Inc.Williamstown, KY · $70,000 initial (proposed) · 2 alleged willful or repeat
- Voss USA LLCFort Worth, TX · $49,650 initial (proposed) · 1 alleged willful or repeat
- Axon Construction Inc.Long Island City, NY · $44,685 initial (proposed) · 1 alleged willful or repeat · 3 inspections on record
- Terrero Construction LLCBeaverton, OR · $42,638 initial (proposed) · 1 alleged willful or repeat
- Building Envelope System Techs LLCEugene, OR · $42,167 initial (proposed) · 1 alleged willful or repeat
- JP Carroll Roofing LLCWest Hartford, CT · $35,748 initial (proposed) · 2 inspections on record
- Chacon Roofing, LLCEast Haven, CT · $33,103 initial (proposed) · 3 alleged willful or repeat
- Chavez Roofing, LLCColumbus, MS · $33,100 initial (proposed) · 1 alleged willful or repeat
- Tactical Construction Services, LLCEnfield, CT · $29,790 initial (proposed) · 2 alleged willful or repeat
- Highrise Safety Systems, Inc.Hoboken, NJ · $29,790 initial (proposed) · 2 inspections on record
Often cited together
- 1926.501 Fall Protection (329 shared inspections)
- 1926.503 Fall Protection Training (214 shared inspections)
- 1926.1053 Ladder Safety (159 shared inspections)
- 1926.102 Eye and Face Protection (102 shared inspections)
- 1926.20 Construction Safety Programs (79 shared inspections)
- 1926.100 Hard Hats (69 shared inspections)
- 1903.19 Abatement Verification (41 shared inspections)
- 1926.451 Scaffold Safety (39 shared inspections)
Questions
What does OSHA standard 1926.502 require?
This section sets performance criteria for the fall protection systems required in construction, including guardrails, safety nets, personal fall arrest systems, positioning devices, warning lines, controlled access zones, hole covers, and fall protection plans. For instance, guardrail top rails must be 42 inches high, plus or minus 3 inches, anchorages must support 5,000 pounds per worker, and hole covers must be secured and marked.
How often was 1926.502 cited in the last 12 months?
In the public data as of November 16, 2026, 1926.502 (Fall Protection Systems) appeared in 625 inspections with citations issued between Nov 16, 2025 and Nov 16, 2026, covering 873 alleged violation items.
Which part of 1926.502 is cited most?
1926.502(d)(17) was the most-cited paragraph, with 143 items.
Which states cite 1926.502 most often?
The most citations under 1926.502 in this period were issued in Maryland, Illinois, Virginia.
What is the typical penalty for a 1926.502 violation?
Counting each citation once, the median initial (proposed) penalty was $3,885 per citation; the median current penalty after settlements and amendments was $2,838. OSHA often groups related violations (items such as 01002A and 01002B) into one citation with one penalty, recorded on one item and sometimes under another standard, so these figures combine the grouped items. 41% of items carried no separate penalty, usually because OSHA grouped them with a related violation in the same citation, which carries the penalty. Totals for the items under 1926.502: $2,910,492 proposed, $2,321,754 current. Penalties vary by violation type, employer size and history, and State Plans set their own amounts.
Are 1926.502 citations final?
Not necessarily. A citation is an allegation until it becomes a final order. 9% of these items were contested, and many others were changed in settlements. Each listing shows its current status and a link to the official record.