1926.405 Temporary Wiring and Cords: citations, penalties and recently cited employers
Data as of November 16, 2026 · citations issued Nov 16, 2025 to Nov 16, 2026
This section sets requirements for wiring methods, cabinets, boxes, fittings, switches, and flexible cords used during construction. Temporary wiring is permitted with limits, and flexible cords must be protected from damage, used only for approved purposes, rated for hard or extra-hard usage, and connected with strain relief. Pull boxes and junction boxes must have covers, and cords may not substitute for fixed wiring.
OSHA often groups related violations into one citation (items such as 01002A and 01002B) and records the group's penalty on one item, sometimes under another standard. The medians count each citation with an item under 1926.405 once, at the group's combined penalty. 47% of items carried no separate penalty: 29% of those were grouped with a related violation in the same citation, which carries the penalty, and the rest were cited with no proposed fine (mostly other-than-serious items).
What the standard requires
- Protect flexible cords from damage and sharp edges
- Provide covers on pull boxes, junction boxes, and fittings
- Use cords rated for hard or extra-hard usage
- Connect cords with strain relief, not knots or tape
- Avoid using flexible cords as a substitute for fixed wiring
Hazards it addresses
- Shock from damaged cord insulation
- Electrocution from exposed conductors in open boxes
- Fires from overloaded or misused cords
Cited heavily in construction where extension cords and temporary lighting are run through doorways and walkways.
Plain-language summary written for this site; it is not the regulatory text and not legal advice. Read the official text at eCFR.
Citations by month
Inspections with citations issued, by month of issuance. Hatched months are incomplete: citations reach the public data about a month after issuance.
Most-cited paragraphs
| Paragraph | What it covers | Items | Inspections | Median proposed penalty per citation |
|---|---|---|---|---|
| 1926.405(g)(2)(iv) | Flexible cords must be connected to devices and fittings so that strain relief is provided. | 98 | 98 | $0 |
| 1926.405(a)(2)(ii)(I) | Flexible cords and cables must be protected from damage, including sharp corners and pinch points. | 43 | 43 | $300 |
| 1926.405(b)(2) | Pull boxes, junction boxes, and fittings must have covers. | 41 | 41 | $1,200 |
| 1926.405(b)(1) | 19 | 19 | $1,050 | |
| 1926.405(j)(1)(i) | 15 | 15 | $1,200 | |
| 1926.405(g)(1)(iii) | Flexible cords may not be used as a substitute for fixed wiring or run through walls, ceilings, or floors. | 14 | 14 | $1,053 |
| 1926.405(g)(2)(iii) | 12 | 12 | $1,351 | |
| 1926.405(a)(2)(ii)(J) | 10 | 10 | $200 | |
| 1926.405(d) | 9 | 9 | $1,800 | |
| 1926.405(a)(2)(ii)(C) | 7 | 7 | $1,773 | |
| 1926.405(g)(1)(iii)(B) | Flexible cords may not be used as a substitute for fixed wiring or run through walls, ceilings, or floors. | 6 | 6 | $50 |
| 1926.405(a)(2)(ii)(B) | 4 | 4 | $4,288 | |
| 1926.405(a)(2)(ii)(A) | 2 | 2 | $0 | |
| 1926.405(a)(2)(ii)(E) | 2 | 2 | $0 | |
| 1926.405(a)(2)(ii)(F) | 2 | 2 | $5,574 |
Penalties
Across 295 alleged items, OSHA and state-plan offices proposed $416,894 in initial penalties. The current total in the public data is $316,943, 24% lower after settlements, contests and amendments.
By violation type: Serious 54%; Other-than-serious 45%; Repeat 0%.
Trends and abatement
From December 2025 to August 2026 (months with complete data), 203 inspections citing 1926.405 had citations first issued, 15% fewer than in the same months a year earlier (239).
Abatement time: for the 149 alleged items under 1926.405 with an abatement date, OSHA set a median of 10 days from issuance to correct the hazard (a quarter got more than 26 days).
Penalty distribution
Half of the initial (proposed) penalties per citation (grouped items combined) were $698 or less; a quarter were above $2,550, and one in ten above $4,965.
| Initial (proposed) penalty per citation (grouped items combined) | Count | Share |
|---|---|---|
| Under $1,000 | 152 | 54% |
| $1,000 to $4,999 | 102 | 36% |
| $5,000 to $14,999 | 24 | 9% |
| $15,000 to $49,999 | 2 | 1% |
| $50,000 or more | 0 | 0% |
Industries cited most under 1926.405
| Industry (NAICS) | Cited inspections | Share |
|---|---|---|
| Foundation, Structure, and Building Exterior Contractors 2381 | 91 | 36% |
| Building Equipment Contractors 2382 | 53 | 21% |
| Nonresidential Building Construction 2362 | 42 | 16% |
| Building Finishing Contractors 2383 | 26 | 10% |
| Residential Building Construction 2361 | 25 | 10% |
| Other Specialty Trade Contractors 2389 | 3 | 1% |
| Nonmetallic Mineral Mining and Quarrying 2123 | 2 | 1% |
| Remediation and Other Waste Management Services 5629 | 2 | 1% |
Citations by state
| State | Inspections cited | Items | Initial penalties | Current penalties |
|---|---|---|---|---|
| Virginia | 46 | 51 | $90,952 | $71,793 |
| Maryland | 27 | 36 | $6,675 | $5,266 |
| North Carolina | 22 | 24 | $2,250 | $1,950 |
| Minnesota | 19 | 20 | $9,000 | $6,870 |
| Tennessee | 18 | 20 | $4,650 | $4,530 |
| New York | 16 | 17 | $41,354 | $30,510 |
| Puerto Rico | 16 | 21 | $24,773 | $24,673 |
| Texas | 9 | 9 | $45,113 | $31,029 |
| Indiana | 8 | 12 | $600 | $600 |
| New Jersey | 6 | 7 | $25,962 | $21,818 |
| Hawaii | 5 | 5 | $6,562 | $4,593 |
| Nevada | 5 | 5 | $935 | $935 |
| California | 4 | 4 | $15,274 | $10,491 |
| Guam | 4 | 6 | $4,612 | $2,537 |
| Iowa | 4 | 6 | $6,738 | $7,359 |
| Idaho | 4 | 4 | $7,976 | $4,392 |
| Illinois | 4 | 5 | $3,376 | $3,376 |
| Missouri | 4 | 4 | $10,640 | $7,100 |
| District of Columbia | 3 | 3 | $0 | $0 |
| Kentucky | 3 | 3 | $14,700 | $12,740 |
By industry
- Construction: 242 inspections
- Mining, oil & gas: 2 inspections
- Administrative & waste services: 2 inspections
- Utilities: 2 inspections
- Accommodation & food services: 1 inspections
- Agriculture, forestry & fishing: 1 inspections
- Educational services: 1 inspections
- Manufacturing: 1 inspections
Recently cited establishments
Alleged violations. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
| Establishment | Location | Issued | Alleged items | Initial penalty | Current penalty | Status and deadlines | Source |
|---|---|---|---|---|---|---|---|
| Sandstone Structures LLC | Brooklyn, NY | Oct 14, 2026 | 1 | $2,837 | $1,400 | Informal settlement | osha.gov #348883448 |
| Central Carolina Interiors, Inc. | South Boston, VA | Oct 7, 2026 | 1 | $705 | $494 | Informal settlementAbatement due Nov 3, 2026 | osha.gov #349108647 |
| Burton Construction Co., Inc., J. E | South Boston, VA | Oct 7, 2026 | 1 | $705 | $494 | Informal settlementAbatement due Nov 3, 2026 | osha.gov #349108613 |
| LA Construction 1 Inc. | River Forest, IL | Oct 2, 2026 | 1 | $0 | $0 | Informal settlementAbatement due Oct 29, 2026 | osha.gov #348980152 |
| Name withheld (individual) | Winston Salem, NC | Oct 1, 2026 | 1 | $0 | $0 | Final orderAbatement due Oct 5, 2026 | osha.gov #349080424 |
| Southern Spear Ironworks, LLC | Norfolk, VA | Oct 1, 2026 | 1 | $8,512 | $6,810 | Informal settlementAbatement due Oct 28, 2026 | osha.gov #349092049 |
| Resa Construction, Inc. | Bloomington, IN | Sep 30, 2026 | 3 | $0 | $0 | Final order | osha.gov #349077438 |
| Mja, Inc. | Westminster, MD | Sep 30, 2026 | 1 | $0 | $0 | Final orderAbatement due Oct 8, 2026 | osha.gov #349158774 |
| Green Community Development | Sinajana, GU | Sep 29, 2026 | 1 | $0 | $0 | Informal settlementAbatement due Oct 9, 2026 | osha.gov #349102939 |
| General Siding of NC LLC | Wilmington, NC | Sep 28, 2026 | 1 | $0 | $0 | Informal settlementAbatement due Oct 6, 2026 | osha.gov #349088559 |
| Nordstrom Architectural Sheet Metal - Roofing Inc. | Minneapolis, MN | Sep 25, 2026 | 1 | $300 | $300 | Final orderAbatement due Sep 29, 2026 | osha.gov #349151696 |
| Dayco Concrete Company Inc. | Minneapolis, MN | Sep 25, 2026 | 1 | $200 | $120 | Informal settlementAbatement due Sep 29, 2026 | osha.gov #349151688 |
| Lawson Custom Exteriors | Hayden, ID | Sep 23, 2026 | 1 | $1,702 | $1,191 | Informal settlementAbatement due Oct 13, 2026 | osha.gov #349131664 |
| DMG, Inc. | Sioux Falls, SD | Sep 18, 2026 | 1 | $0 | $0 | Informal settlement | osha.gov #349044420 |
| Perez Electric Service Inc. | Mayaguez, PR | Sep 17, 2026 | 1 | $4,729 | $4,729 | ContestedContested Oct 1, 2026 | osha.gov #348827957 |
| Rapid Construction Inc. | Honolulu, HI | Sep 17, 2026 | 1 | $3,015 | $2,110 | Informal settlement | osha.gov #349055178 |
| A&R Remodeling Exteriors, LLC | Kansas City, MO | Sep 17, 2026 | 1 | $2,270 | $2,270 | Final orderAbatement due Oct 14, 2026 | osha.gov #348875527 |
| Fulcrum Construction, LLC | Delray Beach, FL | Sep 17, 2026 | 1 | $4,783 | $4,783 | Informal settlement | osha.gov #349029397 |
| Bosco Electric, Inc. | Delray Beach, FL | Sep 17, 2026 | 1 | $1,640 | $1,640 | Final order | osha.gov #349029652 |
| Insight Electrical Construction LLC | Kernersville, NC | Sep 14, 2026 | 1 | $0 | $0 | Final orderAbatement due Sep 18, 2026 | osha.gov #349102988 |
| Brycon LLC | Sparks, NV | Sep 14, 2026 | 1 | $0 | $0 | ContestedContested Oct 23, 2026 | osha.gov #348959545 |
| Texas Petroleum Group, LLC | Santa Fe, NM | Sep 14, 2026 | 1 | $8,045 | $8,045 | OpenAbatement due Oct 8, 2026Contest deadline ~Oct 5, 2026 (est.) | osha.gov #348821976 |
| White Electrical Services LLC | Lynchburg, VA | Sep 11, 2026 | 1 | $4,130 | $4,130 | Final orderAbatement due Oct 7, 2026 | osha.gov #349041046 |
| New York State Electric & Gas Corporation | Liberty, NY | Sep 11, 2026 | 1 | $11,823 | $11,823 | Final orderAbatement due Sep 17, 2026 | osha.gov #348944513 |
| Urus Construction Corporation | Berlin, NJ | Sep 4, 2026 | 1 | $3,547 | $3,547 | OpenContest deadline ~Sep 28, 2026 (est.) | osha.gov #349054460 |
| A Gomez Framing LLC | Wendell, NC | Sep 4, 2026 | 1 | $0 | $0 | Final orderAbatement due Sep 8, 2026 | osha.gov #348801408 |
| Nni Construction Co. | Coeur D Alene, ID | Sep 3, 2026 | 1 | $2,870 | $2,009 | Informal settlementAbatement due Sep 24, 2026 | osha.gov #349132589 |
| Northface Drywall LLC | Bend, OR | Sep 3, 2026 | 1 | $0 | $0 | Final order | osha.gov #348963018 |
| Division 6-10 LLC | Minneapolis, MN | Sep 2, 2026 | 1 | $750 | $450 | Informal settlementAbatement due Sep 8, 2026 | osha.gov #349116913 |
| A. A. Electric Co., Inc. | Baltimore, MD | Sep 1, 2026 | 2 | $0 | $0 | Final order | osha.gov #349021121 |
| Ac_are Construction Services LLC | Frederick, MD | Sep 1, 2026 | 1 | $0 | $0 | Final orderAbatement due Sep 10, 2026 | osha.gov #348987033 |
| Mountain, LLC | Saipan, MP | Sep 1, 2026 | 1 | $0 | $0 | Final order | osha.gov #349098830 |
| Veritas Managed Solutions, Inc. | Sparks, NV | Sep 1, 2026 | 1 | $0 | $0 | Final order | osha.gov #348950098 |
| Name withheld (individual) | Grand Prairie, TX | Aug 31, 2026 | 1 | $2,270 | $1,077 | Informal settlementAbatement due Sep 25, 2026 | osha.gov #348829615 |
| Costello Construction of Maryland, Inc. | Dewey Beach, DE | Aug 28, 2026 | 1 | $0 | $0 | OpenContest deadline ~Sep 21, 2026 (est.) | osha.gov #348786070 |
| Interior Specialty Contractor Corp. | Manati, PR | Aug 27, 2026 | 2 | $8,275 | $8,275 | OpenAbatement due Sep 2, 2026Contest deadline ~Sep 18, 2026 (est.) | osha.gov #348780735 |
| Soumis Construction Inc. | Duluth, MN | Aug 27, 2026 | 1 | $750 | $750 | Informal settlementAbatement due Sep 3, 2026 | osha.gov #349113795 |
| E Electrical Contractor LLC | San German, PR | Aug 25, 2026 | 2 | $0 | $0 | Informal settlement | osha.gov #348800152 |
| A-G Quality Construction LLC | Kernersville, NC | Aug 25, 2026 | 1 | $0 | $0 | Final orderAbatement due Aug 31, 2026 | osha.gov #349028696 |
| The Power Source, Inc. | Parkville, MD | Aug 19, 2026 | 1 | $0 | $0 | ContestedAbatement due Aug 27, 2026Contested Sep 8, 2026 | osha.gov #349054478 |
Notable employers cited under 1926.405
Largest proposed penalties under 1926.405 in the last 12 months (items under this standard only), among establishments with a detailed history page. Alleged violations; see each page for status and current penalty.
- English Construction Company, IncorporatedFarmville, VA · $16,975 initial (proposed) · 4 inspections on record
- New York State Electric & Gas CorporationLiberty, NY · $11,823 initial (proposed) · 2 inspections on record
- Interior Specialty Contractor Corp.Manati, PR · $8,275 initial (proposed) · 2 inspections on record
- Lead Builders Inc.Port Hueneme, CA · $6,753 initial (proposed) · 2 inspections on record
- LJ Framing LLCJackson, NJ · $6,384 initial (proposed) · 1 alleged willful or repeat · 2 inspections on record
- Elite Brothers Construction LLCNewark, NJ · $5,958 initial (proposed) · 2 alleged willful or repeat
- Goldline Construction CorporationHowell, NJ · $4,965 initial (proposed) · 2 alleged willful or repeat · 2 inspections on record
- White Electrical Services LLCLynchburg, VA · $4,130 initial (proposed) · 1 alleged willful or repeat
- Urus Construction CorporationBerlin, NJ · $3,547 initial (proposed)
- Chuy's Framing LLCParkville, MO · $2,837 initial (proposed) · 1 alleged willful or repeat
Often cited together
- 1926.501 Fall Protection (76 shared inspections)
- 1926.403 Electrical Equipment Installation (66 shared inspections)
- 1926.416 Electrical Work Practices (49 shared inspections)
- 1926.1053 Ladder Safety (45 shared inspections)
- 1926.102 Eye and Face Protection (42 shared inspections)
- 1926.451 Scaffold Safety (34 shared inspections)
- 1926.404 GFCI and Grounding (34 shared inspections)
- 1926.503 Fall Protection Training (34 shared inspections)
Questions
What does OSHA standard 1926.405 require?
This section sets requirements for wiring methods, cabinets, boxes, fittings, switches, and flexible cords used during construction. Temporary wiring is permitted with limits, and flexible cords must be protected from damage, used only for approved purposes, rated for hard or extra-hard usage, and connected with strain relief. Pull boxes and junction boxes must have covers, and cords may not substitute for fixed wiring.
How often was 1926.405 cited in the last 12 months?
In the public data as of November 16, 2026, 1926.405 (Temporary Wiring and Cords) appeared in 255 inspections with citations issued between Nov 16, 2025 and Nov 16, 2026, covering 295 alleged violation items.
Which part of 1926.405 is cited most?
1926.405(g)(2)(iv) was the most-cited paragraph, with 98 items: Flexible cords must be connected to devices and fittings so that strain relief is provided.
Which states cite 1926.405 most often?
The most citations under 1926.405 in this period were issued in Virginia, Maryland, North Carolina.
What is the typical penalty for a 1926.405 violation?
Counting each citation once, the median initial (proposed) penalty was $698 per citation; the median current penalty after settlements and amendments was $516. OSHA often groups related violations (items such as 01002A and 01002B) into one citation with one penalty, recorded on one item and sometimes under another standard, so these figures combine the grouped items. 47% of items carried no separate penalty: 29% of those were grouped with a related violation in the same citation, which carries the penalty, and the rest were cited with no proposed fine (mostly other-than-serious items). Totals for the items under 1926.405: $416,894 proposed, $316,943 current. Penalties vary by violation type, employer size and history, and State Plans set their own amounts.
Are 1926.405 citations final?
Not necessarily. A citation is an allegation until it becomes a final order. 12% of these items were contested, and many others were changed in settlements. Each listing shows its current status and a link to the official record.