Data as of November 16, 2026 · citations issued Nov 16, 2025 to Nov 16, 2026
Beyond the general scaffold rules, this section adds requirements tailored to particular scaffold types, including tube and coupler, fabricated frame, pump jack, ladder jack, two-point suspension, and mobile scaffolds. For example, frame scaffolds must be properly braced and their frames locked together, and mobile scaffolds must have locked casters and may carry workers only under specific conditions while being moved.
OSHA often groups related violations into one citation (items such as 01002A and 01002B) and records the group's penalty on one item, sometimes under another standard. The medians count each citation with an item under 1926.452 once, at the group's combined penalty. 39% of items carried no separate penalty, usually because OSHA grouped them with a related violation in the same citation, which carries the penalty.
What the standard requires
- Brace fabricated frame scaffolds with cross, horizontal, or diagonal braces
- Follow type-specific limits for pump jack and ladder jack scaffolds
- Lock casters on mobile scaffolds when in use
- Move mobile scaffolds with workers aboard only under specified conditions
Hazards it addresses
- Scaffold tipping or collapse
- Falls when scaffolds shift or roll
- Structural failure from improper bracing
Cited in masonry, drywall, painting, and commercial interior work using frame and rolling scaffolds.
Plain-language summary written for this site; it is not the regulatory text and not legal advice. Read the official text at eCFR.
Citations by month
Inspections with citations issued, by month of issuance. Hatched months are incomplete: citations reach the public data about a month after issuance.
Most-cited paragraphs
| Paragraph | What it covers | Items | Inspections | Median proposed penalty per citation |
|---|---|---|---|---|
| 1926.452(j)(2) | 106 | 106 | $3,310 | |
| 1926.452(c)(2) | Frames and panels of fabricated frame scaffolds must be braced by cross, horizontal, or diagonal braces. | 40 | 40 | $3,228 |
| 1926.452(c)(3) | 24 | 24 | $2,295 | |
| 1926.452(w)(2) | 18 | 18 | $2,185 | |
| 1926.452(k)(5) | 10 | 10 | $3,972 | |
| 1926.452(k)(1) | 9 | 9 | $4,839 | |
| 1926.452(c)(4) | 8 | 8 | $1,094 | |
| 1926.452(w)(6)(i) | Employees may not ride mobile scaffolds being moved unless specific surface, height-to-base, and stability conditions are met. | 7 | 7 | $2,412 |
| 1926.452(a)(4) | 6 | 6 | $3,618 | |
| 1926.452(k)(4) | 5 | 5 | $2,270 | |
| 1926.452(c)(5)(iii) | 3 | 3 | $2,838 | |
| 1926.452(j)(1) | 3 | 3 | $4,965 | |
| 1926.452(k)(2) | 3 | 3 | $3,972 | |
| 1926.452(k)(3) | 3 | 3 | $3,972 | |
| 1926.452(n)(1) | 3 | 3 | $16,550 |
Penalties
Across 281 alleged items, OSHA and state-plan offices proposed $691,731 in initial penalties. The current total in the public data is $592,743, 14% lower after settlements, contests and amendments.
By violation type: Serious 91%; Other-than-serious 6%; Repeat 3%.
Trends and abatement
From December 2025 to August 2026 (months with complete data), 212 inspections citing 1926.452 had citations first issued, 6% more than in the same months a year earlier (200).
Abatement time: for the 182 alleged items under 1926.452 with an abatement date, OSHA set a median of 18 days from issuance to correct the hazard (a quarter got more than 30 days).
Penalty distribution
Half of the initial (proposed) penalties per citation (grouped items combined) were $3,310 or less; a quarter were above $4,965, and one in ten above $6,186.
| Initial (proposed) penalty per citation (grouped items combined) | Count | Share |
|---|---|---|
| Under $1,000 | 32 | 12% |
| $1,000 to $4,999 | 188 | 73% |
| $5,000 to $14,999 | 34 | 13% |
| $15,000 to $49,999 | 4 | 2% |
| $50,000 or more | 0 | 0% |
Industries cited most under 1926.452
| Industry (NAICS) | Cited inspections | Share |
|---|---|---|
| Foundation, Structure, and Building Exterior Contractors 2381 | 175 | 71% |
| Residential Building Construction 2361 | 22 | 9% |
| Building Finishing Contractors 2383 | 22 | 9% |
| Nonresidential Building Construction 2362 | 13 | 5% |
| Building Equipment Contractors 2382 | 4 | 2% |
| Other Specialty Trade Contractors 2389 | 2 | 1% |
| Cement and Concrete Product Manufacturing 3273 | 2 | 1% |
| Other Wood Product Manufacturing 3219 | 2 | 1% |
Citations by state
| State | Inspections cited | Items | Initial penalties | Current penalties |
|---|---|---|---|---|
| Virginia | 31 | 41 | $47,315 | $43,014 |
| New Jersey | 25 | 25 | $128,809 | $120,024 |
| Maryland | 22 | 22 | $7,900 | $7,340 |
| North Carolina | 20 | 22 | $31,935 | $25,641 |
| Texas | 20 | 23 | $70,695 | $57,662 |
| Tennessee | 16 | 19 | $18,350 | $17,170 |
| Massachusetts | 15 | 17 | $65,352 | $50,598 |
| Florida | 12 | 13 | $62,087 | $54,478 |
| Illinois | 7 | 7 | $12,768 | $12,768 |
| Michigan | 7 | 10 | $4,900 | $3,700 |
| New York | 7 | 7 | $14,719 | $12,931 |
| Minnesota | 6 | 7 | $41,350 | $38,830 |
| New Hampshire | 6 | 10 | $7,944 | $2,000 |
| Colorado | 5 | 5 | $8,228 | $6,872 |
| Connecticut | 5 | 5 | $28,041 | $23,490 |
| Oregon | 5 | 5 | $5,576 | $5,576 |
| Rhode Island | 5 | 6 | $16,898 | $15,479 |
| Wisconsin | 5 | 6 | $3,405 | $3,405 |
| Alabama | 3 | 3 | $12,484 | $10,782 |
| Nebraska | 3 | 3 | $31,776 | $29,691 |
By industry
- Construction: 238 inspections
- Manufacturing: 5 inspections
- Agriculture, forestry & fishing: 1 inspections
- Other services: 1 inspections
- Professional & technical services: 1 inspections
- Transportation & warehousing: 1 inspections
- Wholesale trade: 1 inspections
Recently cited establishments
Alleged violations. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
| Establishment | Location | Issued | Alleged items | Initial penalty | Current penalty | Status and deadlines | Source |
|---|---|---|---|---|---|---|---|
| S. Lewis Lionberger Construction Company | Salisbury, MD | Oct 9, 2026 | 1 | $0 | $0 | Final order | osha.gov #349123893 |
| Portillo Construction Inc. | Concord, NC | Oct 5, 2026 | 1 | $1,300 | $1,300 | Final orderAbatement due Oct 9, 2026 | osha.gov #348886672 |
| Stratford Homes Limited Partnership | Stratford, WI | Sep 30, 2026 | 1 | $0 | $0 | Informal settlementAbatement due Oct 22, 2026 | osha.gov #349049072 |
| Prata Construction LLC | Jersey City, NJ | Sep 28, 2026 | 1 | $11,916 | $11,916 | OpenAbatement due Oct 19, 2026Contest deadline ~Oct 20, 2026 (est.) | osha.gov #348846833 |
| Construction & Disaster Solutions LLC | Woonsocket, RI | Sep 28, 2026 | 1 | $0 | $0 | Informal settlementAbatement due Nov 13, 2026 | osha.gov #348930140 |
| New Home Construction LLC | Jersey City, NJ | Sep 25, 2026 | 1 | $8,513 | $8,513 | Final orderAbatement due Oct 16, 2026 | osha.gov #348846791 |
| Name withheld (individual) | The Colony, TX | Sep 25, 2026 | 1 | $4,965 | $4,965 | OpenAbatement due Oct 22, 2026Contest deadline ~Oct 19, 2026 (est.) | osha.gov #348912551 |
| Name withheld (individual) | Garland, TX | Sep 25, 2026 | 1 | $3,972 | $2,383 | Informal settlementAbatement due Oct 22, 2026 | osha.gov #348920281 |
| Harco Services, LLC | Richmond, VA | Sep 22, 2026 | 2 | $4,195 | $2,936 | Informal settlementAbatement due Nov 9, 2026 | osha.gov #348947722 |
| BTS Masonry Corp. | Mount Juliet, TN | Sep 22, 2026 | 2 | $1,300 | $1,300 | Final orderAbatement due Oct 5, 2026 | osha.gov #349147108 |
| Name withheld (individual) | Fort Worth, TX | Sep 17, 2026 | 2 | $3,547 | $3,547 | Final orderAbatement due Oct 16, 2026 | osha.gov #348825613 |
| JMS Construction Management Corporation | Winthrop, MA | Sep 17, 2026 | 1 | $3,547 | $3,547 | Final orderAbatement due Oct 1, 2026 | osha.gov #349132217 |
| Name withheld (individual) | Winston Salem, NC | Sep 15, 2026 | 1 | $0 | $0 | Final orderAbatement due Sep 21, 2026 | osha.gov #349045146 |
| Ridgecut Construction, LLC | Lafayette Hill, PA | Sep 15, 2026 | 1 | $2,270 | $681 | Informal settlement | osha.gov #349103572 |
| Lauten Construction Company, Inc. | Purcellville, VA | Sep 14, 2026 | 1 | $0 | $0 | Informal settlement | osha.gov #348967373 |
| Lapp's Masonry LLC | Parkton, MD | Sep 14, 2026 | 1 | $0 | $0 | Final orderAbatement due Sep 22, 2026 | osha.gov #349074898 |
| Montano Construction, Inc. | Henrico, VA | Sep 8, 2026 | 1 | $2,490 | $2,490 | Final orderAbatement due Oct 26, 2026 | osha.gov #348885641 |
| Name withheld (individual) | Hagerstown, MD | Sep 4, 2026 | 1 | $0 | $0 | Final orderAbatement due Sep 15, 2026 | osha.gov #348890450 |
| Daniel Jaramillo LLC | Wendell, NC | Sep 2, 2026 | 1 | $0 | $0 | Final orderAbatement due Sep 8, 2026 | osha.gov #348851874 |
| Jorges Exteriors LLC | Hutchinson, MN | Sep 1, 2026 | 1 | $3,850 | $3,850 | Final orderAbatement due Sep 8, 2026 | osha.gov #349048231 |
| MMB Construction, LLC | Richmond, VA | Aug 31, 2026 | 1 | $1,375 | $962 | Informal settlementAbatement due Oct 19, 2026 | osha.gov #349035378 |
| Name withheld (individual) | Whitesburg, TN | Aug 31, 2026 | 1 | $700 | $700 | Final orderAbatement due Sep 14, 2026 | osha.gov #349052381 |
| Rosales Framing Company LLC | Richmond, VA | Aug 31, 2026 | 1 | $2,095 | $2,095 | ContestedAbatement due Oct 19, 2026Contested Oct 29, 2026 | osha.gov #349037598 |
| Triad Siding of Thomasville Incorporated | High Point, NC | Aug 28, 2026 | 1 | $1,250 | $750 | Informal settlementAbatement due Sep 1, 2026 | osha.gov #349050617 |
| RHP Siding LLC | High Point, NC | Aug 28, 2026 | 1 | $1,250 | $1,250 | Final orderAbatement due Sep 1, 2026 | osha.gov #349050625 |
| Costello Construction of Maryland, Inc. | Dewey Beach, DE | Aug 28, 2026 | 1 | $9,931 | $9,931 | OpenContest deadline ~Sep 21, 2026 (est.) | osha.gov #348786070 |
| Ismael Masonry LLC | Saginaw, MI | Aug 27, 2026 | 2 | $0 | $0 | Final orderAbatement due Sep 16, 2026 | osha.gov #348984741 |
| Ryan Hammond, Inc. | Fort Myers Beach, FL | Aug 26, 2026 | 1 | $9,268 | $7,414 | Informal settlementAbatement due Sep 15, 2026 | osha.gov #348816992 |
| Four Season Renovators LLC | Duluth, MN | Aug 21, 2026 | 1 | $2,700 | $2,700 | ContestedAbatement due Aug 26, 2026Contested Sep 18, 2026 | osha.gov #349080762 |
| Rouse Brothers Construction LLC | East Lansing, MI | Aug 21, 2026 | 1 | $500 | $500 | Final order | osha.gov #349055343 |
| Iowa Exterior Renovations LLC | Johnston, IA | Aug 20, 2026 | 1 | $4,965 | $2,482 | Informal settlementAbatement due Sep 16, 2026 | osha.gov #348787128 |
| Glam Lath & Plaster LLC | Albuquerque, NM | Aug 17, 2026 | 1 | $4,221 | $4,221 | OpenAbatement due Sep 11, 2026Contest deadline ~Sep 8, 2026 (est.) | osha.gov #348807199 |
| Name withheld (individual) | Dallas, TX | Aug 17, 2026 | 1 | $3,972 | $3,972 | OpenAbatement due Sep 11, 2026Contest deadline ~Sep 8, 2026 (est.) | osha.gov #348807629 |
| KH Coble Construction, Inc. | Wrightsville Beach, NC | Aug 14, 2026 | 1 | $3,310 | $2,151 | Informal settlementAbatement due Aug 18, 2026 | osha.gov #349014142 |
| Islas Construction LLC | Wrightsville Beach, NC | Aug 14, 2026 | 1 | $3,310 | $2,151 | Informal settlementAbatement due Aug 18, 2026 | osha.gov #349007765 |
| Tongue - Groove LLC | Wrightsville Beach, NC | Aug 14, 2026 | 1 | $6,620 | $4,303 | Informal settlementAbatement due Aug 18, 2026 | osha.gov #349007757 |
| Eclipse Roofing LLC | Sussex, WI | Aug 14, 2026 | 1 | $3,405 | $3,405 | Final orderAbatement due Sep 10, 2026 | osha.gov #349029561 |
| Blue Spider Construction Services Corporation | Chesapeake, VA | Aug 12, 2026 | 1 | $0 | $0 | Informal settlementAbatement due Sep 16, 2026 | osha.gov #348867607 |
| Caliseum II Inc. | Niles, IL | Aug 12, 2026 | 1 | $4,965 | $4,965 | Final orderAbatement due Sep 8, 2026 | osha.gov #349016501 |
| Estrada Masonry LLC | Richmond, VA | Aug 11, 2026 | 2 | $3,255 | $3,255 | ContestedAbatement due Sep 28, 2026Contested Sep 1, 2026 | osha.gov #348796988 |
Notable employers cited under 1926.452
Largest proposed penalties under 1926.452 in the last 12 months (items under this standard only), among establishments with a detailed history page. Alleged violations; see each page for status and current penalty.
- Pro Drywall Inc. dba Pro Drywall - Painting Inc.Elk River, MN · $25,000 initial (proposed)
- Massachusetts General Contractor Services Corp.Lowell, MA · $16,550 initial (proposed)
- Argen Contracting, Inc.Papillion, NE · $13,902 initial (proposed) · 1 alleged willful or repeat
- Ojvejv, Inc.Papillion, NE · $13,902 initial (proposed) · 2 alleged willful or repeat
- AF Construction, LLCBordentown, NJ · $11,916 initial (proposed) · 3 alleged willful or repeat
- Prata Construction LLCJersey City, NJ · $11,916 initial (proposed) · 1 alleged willful or repeat
- Costello Construction of Maryland, Inc.Dewey Beach, DE · $9,931 initial (proposed) · 2 inspections on record
- MCR Construction, Inc.Roxbury, MA · $8,513 initial (proposed) · 2 alleged willful or repeat
- New Home Construction LLCJersey City, NJ · $8,513 initial (proposed) · 1 alleged willful or repeat
- Best Bid, Inc.Madison Heights, VA · $6,885 initial (proposed)
Often cited together
- 1926.451 Scaffold Safety (214 shared inspections)
- 1926.454 Scaffold Training (77 shared inspections)
- 1926.501 Fall Protection (65 shared inspections)
- 1926.1053 Ladder Safety (54 shared inspections)
- 1926.100 Hard Hats (44 shared inspections)
- 1926.102 Eye and Face Protection (43 shared inspections)
- 1926.503 Fall Protection Training (36 shared inspections)
- 1910.1200 Hazard Communication (22 shared inspections)
Questions
What does OSHA standard 1926.452 require?
Beyond the general scaffold rules, this section adds requirements tailored to particular scaffold types, including tube and coupler, fabricated frame, pump jack, ladder jack, two-point suspension, and mobile scaffolds. For example, frame scaffolds must be properly braced and their frames locked together, and mobile scaffolds must have locked casters and may carry workers only under specific conditions while being moved.
How often was 1926.452 cited in the last 12 months?
In the public data as of November 16, 2026, 1926.452 (Specific Scaffold Types) appeared in 248 inspections with citations issued between Nov 16, 2025 and Nov 16, 2026, covering 281 alleged violation items.
Which part of 1926.452 is cited most?
1926.452(j)(2) was the most-cited paragraph, with 106 items.
Which states cite 1926.452 most often?
The most citations under 1926.452 in this period were issued in Virginia, New Jersey, Maryland.
What is the typical penalty for a 1926.452 violation?
Counting each citation once, the median initial (proposed) penalty was $3,310 per citation; the median current penalty after settlements and amendments was $2,482. OSHA often groups related violations (items such as 01002A and 01002B) into one citation with one penalty, recorded on one item and sometimes under another standard, so these figures combine the grouped items. 39% of items carried no separate penalty, usually because OSHA grouped them with a related violation in the same citation, which carries the penalty. Totals for the items under 1926.452: $691,731 proposed, $592,743 current. Penalties vary by violation type, employer size and history, and State Plans set their own amounts.
Are 1926.452 citations final?