Norris Bros. Excavating LLC: OSHA inspection records
Data as of November 16, 2026
$3,750initial (proposed) penalties
4 alleged violation items across 1 cited inspection in the last 12 months, including 4 serious.
Status1 contestedinspection status per the public record
Get Tennessee alerts- Location
- 2108 Keller Bend Road, Knoxville, TN 37922
- Industry
- Construction (NAICS 237110, Utility System Construction)
- Jurisdiction
- Tennessee, State plan
- Cited inspections
- 1 in the last 12 months
- Inspection history
- Inspected 2 times since 2026.
Alleged violations. Citations issued by a State Plan office. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
Inspection 348678327
Contested Under contest; not a final finding. Items and penalties may change.
- Opened
- January 8, 2026
- Citations issued
- May 27, 2026
- Abatement due
- June 11, 2026 (per OSHA record)
- Contest date
- June 16, 2026 (per OSHA record)
- Official record
- osha.gov inspection detail #348678327 · OSHA Establishment Search (if osha.gov shows its homepage, search inspection 348678327)
| Citation | Standard | Type | Issued | Abatement due | Initial penalty | Current penalty | Status |
|---|---|---|---|---|---|---|---|
| Citation 01001 | 1926.652(c)(3)(iii) Trench Cave-In Protection | Serious | May 27, 2026 | Jun 11, 2026 | $1,750 | $1,750 | Contested |
| Citation 01002A | 1926.652(d)(1) Trench Cave-In Protection | Serious | May 27, 2026 | Jun 11, 2026 | $2,000 | $2,000 | Contested |
| Citation 01002B | 1926.652(d)(2) Trench Cave-In Protection | Serious | May 27, 2026 | Jun 11, 2026 | $0 | $0 | Contested |
| Citation 01002C | 1926.652(d)(3) Trench Cave-In Protection | Serious | May 27, 2026 | Jun 11, 2026 | $0 | $0 | Contested |
Inspection history since 2026
OSHA recorded 2 inspections at this establishment name and ZIP code since 2026, the most recent opened May 27, 2026. 1 of them had citations.
Inspections opened per year. Same establishment name and ZIP code in DOL's full inspection history; different spellings or addresses of one business are not joined.
| Inspection | Opened | Alleged items | Initial penalty | Source |
|---|---|---|---|---|
| Inspection 348958810 | May 27, 2026 | No citations recorded | — | osha.gov #348958810 |
| Inspection 348678327 | Jan 8, 2026 | 4 | $3,750 | osha.gov #348678327 |
Compared with similar employers
Among 11 other Utility System Construction (NAICS 2371) establishments in Tennessee with citations issued in the last 12 months, this establishment's proposed penalties ($3,750) were higher than 36% of them, and its 4 alleged items more than 64%.
| Last 12 months | This establishment | Peer median | Higher than |
|---|---|---|---|
| Initial (proposed) penalties | $3,750 | $4,400 | 36% |
| Alleged violation items | 4 | 2.5 | 64% |
Standards cited most in this industry
Share of the 553 cited inspections in Utility System Construction (NAICS 2371) nationwide (last 12 months) that included each standard; the ones marked were also cited here.
| Standard | Topic | Share of inspections | Cited here |
|---|---|---|---|
| 1926.652 | Trench Cave-In Protection | 37% | Yes |
| 1926.651 | Excavation Safety | 30% | |
| 1926.21 | Construction Safety Training | 8% | |
| 1926.1053 | Ladder Safety | 6% | |
| 1926.100 | Hard Hats | 4% | |
| 1926.1153 | Silica in Construction | 3% |
Other construction employers cited in Tennessee
- All Renovation 1 LLCKnoxville, issued Sep 8, 2026, $1,100 initial (proposed)
- Pablo Contracting Inc.Nashville, issued Oct 7, 2026, $6,800 initial (proposed)
- Tri-State Iron Works, Inc.Memphis, issued Oct 6, 2026, $2,500 initial (proposed)
- Luis Valdes Masonry LLCBristol, issued Oct 5, 2026, $1,825 initial (proposed)
- Creative Masonry, Inc.Jonesborough, issued Oct 5, 2026, $132,000 initial (proposed)
- Framing Construction, LLCLebanon, issued Oct 2, 2026, $7,000 initial (proposed)
Related
Is something on this page wrong or out of date? Request a correction or removal.