1926.651 Excavation Safety: citations, penalties and recently cited employers
Data as of November 16, 2026 · citations issued Nov 16, 2025 to Nov 16, 2026
This section sets jobsite requirements for excavations and trenches, apart from cave-in protective systems. Employers must locate underground utilities before digging, provide stairways, ladders, or ramps in trenches 4 feet or deeper, test for hazardous atmospheres, keep spoil piles back from the edge, and protect workers from water accumulation. A competent person must inspect excavations daily and after events like rainstorms.
OSHA often groups related violations into one citation (items such as 01002A and 01002B) and records the group's penalty on one item, sometimes under another standard. The medians count each citation with an item under 1926.651 once, at the group's combined penalty. 19% of items carried no separate penalty: 59% of those were grouped with a related violation in the same citation, which carries the penalty, and the rest were cited with no proposed fine.
What the standard requires
- Determine and mark underground utility locations before digging
- Provide safe egress within 25 feet of workers in trenches 4 feet or deeper
- Keep spoil and equipment at least 2 feet from the edge
- Test atmospheres where oxygen deficiency or hazardous gases may exist
- Have a competent person inspect excavations daily
Hazards it addresses
- Cave-ins and burial
- Strikes on buried utility lines
- Hazardous atmospheres in trenches
- Falling loads and spoil
Cited in utility installation, sewer and water line work, and site development.
Plain-language summary written for this site; it is not the regulatory text and not legal advice. Read the official text at eCFR.
Citations by month
Inspections with citations issued, by month of issuance. Hatched months are incomplete: citations reach the public data about a month after issuance.
Most-cited paragraphs
| Paragraph | What it covers | Items | Inspections | Median proposed penalty per citation |
|---|---|---|---|---|
| 1926.651(c)(2) | Trenches 4 feet or more deep must have a stairway, ladder, ramp, or other egress within 25 feet of lateral travel. | 247 | 230 | $4,966 |
| 1926.651(k)(1) | A competent person must perform daily inspections of excavations, adjacent areas, and protective systems. | 208 | 208 | $4,900 |
| 1926.651(j)(2) | Materials and equipment must be kept at least 2 feet from the edge or retained to prevent falling in. | 170 | 169 | $4,256 |
| 1926.651(k)(2) | 49 | 49 | $4,965 | |
| 1926.651(j)(1) | 35 | 35 | $4,965 | |
| 1926.651(e) | 26 | 26 | $6,752 | |
| 1926.651(i)(3) | 24 | 24 | $8,228 | |
| 1926.651(h)(1) | 22 | 22 | $4,965 | |
| 1926.651(b)(4) | 16 | 16 | $4,965 | |
| 1926.651(i)(1) | 13 | 13 | $4,966 | |
| 1926.651(d) | 11 | 11 | $3,310 | |
| 1926.651(b)(1) | Estimated locations of underground utilities must be determined before opening an excavation. | 10 | 10 | $1,611 |
| 1926.651(b)(3) | 10 | 10 | $2,961 | |
| 1926.651(c)(1)(i) | 3 | 3 | $1,457 | |
| 1926.651(g)(1)(i) | 3 | 3 | $4,965 |
Penalties
Across 862 alleged items, OSHA and state-plan offices proposed $7,944,068 in initial penalties. The current total in the public data is $6,783,421, 15% lower after settlements, contests and amendments.
By violation type: Serious 77%; Other-than-serious 16%; Repeat 5%; Willful 2%.
Trends and abatement
From December 2025 to August 2026 (months with complete data), 403 inspections citing 1926.651 had citations first issued, 7% more than in the same months a year earlier (378).
Abatement time: for the 548 alleged items under 1926.651 with an abatement date, OSHA set a median of 21 days from issuance to correct the hazard (a quarter got more than 33 days).
Penalty distribution
Half of the initial (proposed) penalties per citation (grouped items combined) were $4,965 or less; a quarter were above $9,930, and one in ten above $16,550.
| Initial (proposed) penalty per citation (grouped items combined) | Count | Share |
|---|---|---|
| Under $1,000 | 77 | 10% |
| $1,000 to $4,999 | 356 | 46% |
| $5,000 to $14,999 | 260 | 33% |
| $15,000 to $49,999 | 54 | 7% |
| $50,000 or more | 34 | 4% |
Industries cited most under 1926.651
| Industry (NAICS) | Cited inspections | Share |
|---|---|---|
| Utility System Construction 2371 | 167 | 33% |
| Other Specialty Trade Contractors 2389 | 100 | 20% |
| Building Equipment Contractors 2382 | 52 | 10% |
| Foundation, Structure, and Building Exterior Contractors 2381 | 47 | 9% |
| Highway, Street, and Bridge Construction 2373 | 34 | 7% |
| Nonresidential Building Construction 2362 | 31 | 6% |
| Residential Building Construction 2361 | 16 | 3% |
| Other Heavy and Civil Engineering Construction 2379 | 13 | 3% |
Citations by state
| State | Inspections cited | Items | Initial penalties | Current penalties |
|---|---|---|---|---|
| Texas | 32 | 43 | $486,337 | $398,088 |
| Pennsylvania | 30 | 47 | $203,493 | $176,970 |
| Illinois | 27 | 44 | $275,540 | $194,619 |
| New York | 25 | 45 | $312,572 | $307,092 |
| Ohio | 25 | 36 | $272,395 | $167,504 |
| Florida | 23 | 41 | $267,280 | $191,011 |
| Colorado | 22 | 47 | $312,111 | $221,552 |
| Oregon | 21 | 26 | $50,782 | $47,874 |
| Tennessee | 20 | 33 | $246,500 | $245,700 |
| Virginia | 20 | 38 | $291,440 | $266,950 |
| Kentucky | 17 | 38 | $173,600 | $142,660 |
| North Carolina | 16 | 28 | $103,875 | $97,883 |
| Massachusetts | 15 | 44 | $2,256,824 | $2,228,010 |
| Minnesota | 15 | 21 | $37,450 | $31,590 |
| South Dakota | 15 | 30 | $49,178 | $28,658 |
| New Jersey | 13 | 24 | $192,549 | $116,212 |
| Connecticut | 12 | 19 | $610,534 | $431,966 |
| Arizona | 11 | 23 | $364,971 | $364,971 |
| Georgia | 11 | 13 | $77,077 | $57,991 |
| Missouri | 11 | 17 | $111,693 | $102,554 |
By industry
- Construction: 461 inspections
- Administrative & waste services: 10 inspections
- Utilities: 10 inspections
- Public administration: 4 inspections
- Other services: 3 inspections
- Arts, entertainment & recreation: 2 inspections
- Transportation & warehousing: 2 inspections
- Real estate & rental: 2 inspections
Recently cited establishments
Alleged violations. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
| Establishment | Location | Issued | Alleged items | Initial penalty | Current penalty | Status and deadlines | Source |
|---|---|---|---|---|---|---|---|
| Brian Capone Land Services, LLC | Greenwich, CT | Oct 13, 2026 | 2 | $3,972 | $1,986 | OpenAbatement due Dec 11, 2026Contest deadline ~Nov 3, 2026 (est.) | osha.gov #349191601 |
| Jonesborough - Water Department | Limestone, TN | Oct 12, 2026 | 1 | $0 | $0 | Final orderAbatement due Nov 12, 2026 | osha.gov #349195495 |
| Hatch Landscape and Design | Brockton, MA | Oct 9, 2026 | 1 | $11,916 | $5,000 | Informal settlement | osha.gov #349095786 |
| R. T. Nunes and Sons, Inc. | Warwick, RI | Oct 9, 2026 | 2 | $2,412 | $1,688 | Informal settlementAbatement due Nov 27, 2026 | osha.gov #349123653 |
| Commonwealth Construction & Utilities, Inc. | Medford, MA | Oct 8, 2026 | 2 | $7,944 | $6,972 | Informal settlementAbatement due Dec 18, 2026 | osha.gov #349129247 |
| 7M Contracting, LLC | Houston, AK | Oct 8, 2026 | 2 | $9,930 | $4,965 | Informal settlement | osha.gov #348882812 |
| City of Houston - Mayor's Office | Houston, AK | Oct 8, 2026 | 4 | $139,032 | $95,998 | OpenContest deadline ~Oct 30, 2026 (est.) | osha.gov #348876772 |
| Capital Foundations, Inc. | San Antonio, TX | Oct 7, 2026 | 2 | $11,917 | $7,150 | Informal settlementAbatement due Oct 28, 2026 | osha.gov #349039925 |
| Johnson Plumbing Co. | Memphis, TN | Oct 7, 2026 | 3 | $2,400 | $2,400 | Final orderAbatement due Oct 22, 2026 | osha.gov #349084335 |
| Penfield Town DPW | Penfield, NY | Oct 7, 2026 | 2 | $0 | $0 | Final orderAbatement due Oct 27, 2026 | osha.gov #349159509 |
| Next Generation Excavating LLC | Chattanooga, TN | Oct 6, 2026 | 1 | $800 | $4,000 | Informal settlementAbatement due Oct 19, 2026 | osha.gov #349121251 |
| Engitex LLC | Conroe, TX | Oct 6, 2026 | 1 | $4,965 | $4,965 | ContestedAbatement due Oct 19, 2026Contested Nov 2, 2026 | osha.gov #348871005 |
| Thalle Construction Co., Inc. | Fort Worth, TX | Oct 6, 2026 | 1 | $13,240 | $5,863 | Informal settlement | osha.gov #348957929 |
| Commpath Construction, LLC | Pensacola, FL | Oct 5, 2026 | 1 | $2,838 | $1,703 | Informal settlementAbatement due Nov 3, 2026 | osha.gov #349088526 |
| Dirt Works Unlimited LLC | Brandenburg, KY | Oct 5, 2026 | 2 | $9,800 | $9,800 | ContestedAbatement due Oct 23, 2026Contested Oct 16, 2026 | osha.gov #348977703 |
| Elite Technician Management Group | Hammond, LA | Oct 5, 2026 | 1 | $4,965 | $4,965 | OpenAbatement due Oct 23, 2026Contest deadline ~Oct 27, 2026 (est.) | osha.gov #348957051 |
| Pophams Trucking LLC | Brandenburg, KY | Oct 5, 2026 | 1 | $3,500 | $3,500 | ContestedAbatement due Oct 23, 2026Contested Oct 26, 2026 | osha.gov #348983172 |
| John Burns Construction Company, LLC | Deerfield, IL | Oct 2, 2026 | 1 | $6,621 | $6,621 | Informal settlement | osha.gov #349056234 |
| Jayde Underground LLC | Wilmington, DE | Oct 1, 2026 | 1 | $3,405 | $2,384 | Informal settlementAbatement due Oct 21, 2026 | osha.gov #348867854 |
| Berkowatts Electric LLC | East Brunswick, NJ | Sep 30, 2026 | 4 | $40,428 | $15,958 | Informal settlementAbatement due Oct 27, 2026 | osha.gov #349136697 |
| Daniels of Philadelphia Plumbing | Philadelphia, PA | Sep 30, 2026 | 2 | $4,824 | $3,377 | Informal settlement | osha.gov #348910274 |
| Aspen Earthworks, Inc. | Sparks, NV | Sep 30, 2026 | 1 | $11,820 | $11,820 | Final order | osha.gov #349013821 |
| M. O' Herron Company | Webster Springs, WV | Sep 30, 2026 | 2 | $42,562 | $42,562 | ContestedAbatement due Nov 18, 2026Contested Oct 7, 2026 | osha.gov #349139816 |
| Clearwater Investment Holdings | Culloden, WV | Sep 29, 2026 | 2 | $9,221 | $9,221 | Final orderAbatement due Oct 26, 2026 | osha.gov #349083873 |
| Minger Construction Companies Inc. | Minneapolis, MN | Sep 25, 2026 | 2 | $6,400 | $6,400 | ContestedAbatement due Sep 29, 2026Contested Oct 1, 2026 | osha.gov #349166355 |
| Janc Excavating and Construction, LLC | Tucson, AZ | Sep 25, 2026 | 1 | $0 | $0 | Final orderAbatement due Sep 25, 2026 | osha.gov #349046110 |
| VC Equipment, Corp. | Caguas, PR | Sep 25, 2026 | 1 | $11,585 | $4,634 | Informal settlementAbatement due Oct 21, 2026 | osha.gov #348914755 |
| Mountain Cascade of Texas LLC | Celina, TX | Sep 24, 2026 | 1 | $16,550 | $16,550 | ContestedAbatement due Oct 21, 2026Contested Oct 26, 2026 | osha.gov #348982331 |
| Best Tunneling - Boring LLC | Cheraw, SC | Sep 24, 2026 | 1 | $1,000 | $1,000 | Final orderAbatement due Sep 30, 2026 | osha.gov #348880360 |
| Caetano's Concrete Inc. | East Boston, MA | Sep 24, 2026 | 2 | $37,075 | $37,075 | ContestedAbatement due Oct 2, 2026Contested Oct 7, 2026 | osha.gov #348872979 |
| KR Contractors, LLC | Racine, WI | Sep 23, 2026 | 2 | $1,447 | $1,447 | Final orderAbatement due Oct 13, 2026 | osha.gov #348960725 |
| Soderberg Company, Inc. | Caribou, ME | Sep 23, 2026 | 1 | $4,469 | $1,500 | Informal settlement | osha.gov #349064873 |
| MC Associates LLC | Louisville, KY | Sep 23, 2026 | 2 | $7,000 | $5,600 | Informal settlementAbatement due Sep 28, 2026 | osha.gov #348910993 |
| Parkstone Inc. / Obstacle Systems Inc. dba Drip Drop Waterproofing Inc. | Monroe, NY | Sep 22, 2026 | 2 | $23,170 | $23,170 | Final orderAbatement due Sep 28, 2026 | osha.gov #349006031 |
| Century Max Industries Corp. | Monroe, NY | Sep 22, 2026 | 2 | $23,170 | $23,170 | ContestedAbatement due Sep 28, 2026Contested Oct 30, 2026 | osha.gov #349035709 |
| Name withheld (individual) | Chambersburg, PA | Sep 22, 2026 | 4 | $72,820 | $50,000 | Informal settlementAbatement due Dec 1, 2026 | osha.gov #348852955 |
| Prime Structure Inc. | Monroe, NY | Sep 22, 2026 | 2 | $9,930 | $9,930 | ContestedAbatement due Sep 28, 2026Contested Oct 30, 2026 | osha.gov #348910407 |
| Advanced Plan and Build LLC | Monroe, NY | Sep 22, 2026 | 2 | $9,930 | $9,930 | ContestedAbatement due Sep 28, 2026Contested Oct 30, 2026 | osha.gov #348910332 |
| Delvalle Contractor Inc. | Monroe, NY | Sep 22, 2026 | 2 | $9,930 | $9,930 | Final orderAbatement due Sep 28, 2026 | osha.gov #349019497 |
| Enebak Construction Company | Lakeville, MN | Sep 22, 2026 | 1 | $750 | $750 | ContestedAbatement due Sep 28, 2026Contested Oct 9, 2026 | osha.gov #349091207 |
Notable employers cited under 1926.651
Largest proposed penalties under 1926.651 in the last 12 months (items under this standard only), among establishments with a detailed history page. Alleged violations; see each page for status and current penalty.
- Revoli Construction Co., Inc.South Yarmouth, MA · $2,130,268 initial (proposed) · 40 alleged willful or repeat · 2 inspections on record
- Sound Construction Inc.Stamford, CT · $331,028 initial (proposed) · 7 alleged willful or repeat
- Diamond Plumbing & Heating, LLCNorwich, CT · $194,644 initial (proposed) · 3 alleged willful or repeat
- Blazey Construction Services, LLCAlvin, TX · $165,514 initial (proposed) · 2 alleged willful or repeat
- B & F Contracting, Inc.Phoenix, AZ · $146,868 initial (proposed) · 1 alleged willful or repeat
- City of Houston - Mayor's OfficeHouston, AK · $139,032 initial (proposed) · 4 alleged willful or repeat
- Norris Bros. Excavating LLCLa Follette, TN · $135,000 initial (proposed) · 4 alleged willful or repeat
- W.G. NY Construction Corp.Brooklyn, NY · $127,445 initial (proposed) · 1 alleged willful or repeat
- Thomas Builders of Virginia, Inc.Rustburg, VA · $125,000 initial (proposed) · 2 alleged willful or repeat
- Norris Bros. Excavating LLCMaynardville, TN · $70,000 initial (proposed) · 3 alleged willful or repeat
Often cited together
- 1926.652 Trench Cave-In Protection (364 shared inspections)
- 1926.21 Construction Safety Training (84 shared inspections)
- 1926.100 Hard Hats (55 shared inspections)
- 1926.1053 Ladder Safety (46 shared inspections)
- 1926.251 Rigging Equipment (12 shared inspections)
- 1926.20 Construction Safety Programs (11 shared inspections)
- 1926.501 Fall Protection (10 shared inspections)
- 1926.701 Concrete and Masonry Work (10 shared inspections)
Questions
What does OSHA standard 1926.651 require?
This section sets jobsite requirements for excavations and trenches, apart from cave-in protective systems. Employers must locate underground utilities before digging, provide stairways, ladders, or ramps in trenches 4 feet or deeper, test for hazardous atmospheres, keep spoil piles back from the edge, and protect workers from water accumulation. A competent person must inspect excavations daily and after events like rainstorms.
How often was 1926.651 cited in the last 12 months?
In the public data as of November 16, 2026, 1926.651 (Excavation Safety) appeared in 501 inspections with citations issued between Nov 16, 2025 and Nov 16, 2026, covering 862 alleged violation items.
Which part of 1926.651 is cited most?
1926.651(c)(2) was the most-cited paragraph, with 247 items: Trenches 4 feet or more deep must have a stairway, ladder, ramp, or other egress within 25 feet of lateral travel.
Which states cite 1926.651 most often?
The most citations under 1926.651 in this period were issued in Texas, Pennsylvania, Illinois.
What is the typical penalty for a 1926.651 violation?
Counting each citation once, the median initial (proposed) penalty was $4,965 per citation; the median current penalty after settlements and amendments was $3,972. OSHA often groups related violations (items such as 01002A and 01002B) into one citation with one penalty, recorded on one item and sometimes under another standard, so these figures combine the grouped items. 19% of items carried no separate penalty: 59% of those were grouped with a related violation in the same citation, which carries the penalty, and the rest were cited with no proposed fine. Totals for the items under 1926.651: $7,944,068 proposed, $6,783,421 current. Penalties vary by violation type, employer size and history, and State Plans set their own amounts.
Are 1926.651 citations final?
Not necessarily. A citation is an allegation until it becomes a final order. 19% of these items were contested, and many others were changed in settlements. Each listing shows its current status and a link to the official record.