Citation Atlas

Revoli Construction Co., Inc.: OSHA inspection records

Data as of November 16, 2026

$4,699,362initial (proposed) penalties

57 alleged violation items across 1 cited inspection in the last 12 months, including 7 willful, 33 repeat, 17 serious.

Status1 contestedinspection status per the public record

Get Massachusetts alerts
Location
152 South Shore Road, South Yarmouth, MA 02664
Industry
Construction (NAICS 237110, Utility System Construction)
Jurisdiction
Massachusetts, Federal OSHA
Cited inspections
1 in the last 12 months
Inspection history
Inspected 2 times since 2024; 2 of those inspections had citations; 40 alleged willful or repeat items on record.

Alleged violations. Citations issued by federal OSHA. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology

Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.

Inspection 348599432

Contested Under contest; not a final finding. Items and penalties may change.

$4,699,362Initial (proposed) penalty
$4,699,362Current penalty
57Alleged violation items
Opened
November 19, 2025
Citations issued
March 31, 2026
Abatement due
April 28, 2026 (per OSHA record)
Contest date
April 1, 2026 (per OSHA record)
Official record
osha.gov inspection detail #348599432 · OSHA Establishment Search (if osha.gov shows its homepage, search inspection 348599432)
CitationStandardTypeIssuedAbatement dueInitial penaltyCurrent penaltyStatus
Citation 010011926.21(b)(2)
Construction Safety Training
SeriousMar 31, 2026Apr 28, 2026$16,550$16,550Contested
Citation 010021926.251(a)(2)(i)
Rigging Equipment
SeriousMar 31, 2026Apr 28, 2026$14,188$14,188Contested
Citation 010031926.416(a)(1)
Electrical Work Practices
SeriousMar 31, 2026Apr 28, 2026$14,188$14,188Contested
Citation 010041926.501(a)(2)
Fall Protection
SeriousMar 31, 2026Apr 28, 2026$16,550$16,550Contested
Citation 010051926.501(b)(15)
Fall Protection
SeriousMar 31, 2026Apr 28, 2026$16,550$16,550Contested
Citation 010061926.600(a)(6)(i)
Construction Equipment
SeriousMar 31, 2026Apr 28, 2026$16,550$16,550Contested
Citation 010071926.651(b)(4)
Excavation Safety
SeriousMar 31, 2026Apr 28, 2026$14,188$14,188Contested
Citation 010081926.651(i)(3)
Excavation Safety
SeriousMar 31, 2026Apr 28, 2026$14,188$14,188Contested
Citation 010091926.651(j)(2)
Excavation Safety
SeriousMar 31, 2026Apr 28, 2026$16,550$16,550Contested
Citation 010101926.652(c)(3)(i)
Trench Cave-In Protection
SeriousMar 31, 2026Apr 28, 2026$16,550$16,550Contested
Citation 010111926.652(c)(4)(i)
Trench Cave-In Protection
SeriousMar 31, 2026Apr 28, 2026$16,550$16,550Contested
Citation 010121926.652(d)(1)
Trench Cave-In Protection
SeriousMar 31, 2026Apr 28, 2026$16,550$16,550Contested
Citation 010131926.652(e)(1)(ii)
Trench Cave-In Protection
SeriousMar 31, 2026Apr 28, 2026$16,550$16,550Contested
Citation 010141926.652(g)(2)
Trench Cave-In Protection
SeriousMar 31, 2026Apr 28, 2026$16,550$16,550Contested
Citation 010151926.1053(b)(1)
Ladder Safety
SeriousMar 31, 2026Apr 28, 2026$16,550$16,550Contested
Citation 010161926.1053(b)(16)
Ladder Safety
SeriousMar 31, 2026Apr 28, 2026$16,550$16,550Contested
Citation 010171926.1060(a)
Ladder and Stair Training
SeriousMar 31, 2026Apr 28, 2026$8,512$8,512Contested
Citation 020011926.501(a)(2)
Fall Protection
WillfulMar 31, 2026Apr 28, 2026$165,514$165,514Contested
Citation 020021926.651(c)(2)
Excavation Safety
WillfulMar 31, 2026Apr 28, 2026$165,514$165,514Contested
Citation 020031926.651(c)(2)
Excavation Safety
WillfulMar 31, 2026Apr 28, 2026$165,514$165,514Contested
Citation 020041926.651(j)(2)
Excavation Safety
WillfulMar 31, 2026Apr 28, 2026$165,514$165,514Contested
Citation 020051926.652(c)(3)
Trench Cave-In Protection
WillfulMar 31, 2026Apr 28, 2026$165,514$165,514Contested
Citation 020061926.652(a)(1)
Trench Cave-In Protection
WillfulMar 31, 2026Apr 28, 2026$165,514$165,514Contested
Citation 020071926.652(c)(4)
Trench Cave-In Protection
WillfulMar 31, 2026Apr 28, 2026$165,514$165,514Contested
Citation 030011926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030021926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030031926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030041926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030051926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030061926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030071926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030081926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030091926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030101926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030111926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030121926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030131926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030141926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030151926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030161926.651(c)(2)
Excavation Safety
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030171926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030181926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030191926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030201926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030211926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030221926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030231926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030241926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030251926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030261926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030271926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030281926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030291926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030301926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030311926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030321926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested
Citation 030331926.652(a)(1)
Trench Cave-In Protection
RepeatMar 31, 2026Apr 28, 2026$99,300$99,300Contested

Inspection history since 2024

OSHA recorded 2 inspections at this establishment name and ZIP code since 2024, the most recent opened Nov 19, 2025. 2 of them had citations. 1 earlier inspection with citations opened in the five years before the most recent one; OSHA's repeat classification generally looks back five years.

Inspections opened per year. Same establishment name and ZIP code in DOL's full inspection history; different spellings or addresses of one business are not joined.

InspectionOpenedAlleged itemsInitial penaltySource
Inspection 348599432Nov 19, 202557 (40 willful or repeat)$4,699,362osha.gov #348599432
Inspection 347946873Dec 20, 20241$11,585osha.gov #347946873
Newest first. Penalties are the initial (proposed) amounts; the inspections linked above show their status and current penalty, and osha.gov has the outcome of the others.

Compared with similar employers

Among 14 other Utility System Construction (NAICS 2371) establishments in Massachusetts with citations issued in the last 12 months, this establishment's proposed penalties ($4,699,362) were higher than 100% of them, and its 57 alleged items more than 100%.

Last 12 monthsThis establishmentPeer medianHigher than
Initial (proposed) penalties$4,699,362$11,916100%
Alleged violation items571100%
Peers: cited establishments in the same NAICS industry in Massachusetts. Proposed penalties before any settlement.

Standards cited most in this industry

Share of the 553 cited inspections in Utility System Construction (NAICS 2371) nationwide (last 12 months) that included each standard; the ones marked were also cited here.

StandardTopicShare of inspectionsCited here
1926.652Trench Cave-In Protection37%Yes
1926.651Excavation Safety30%Yes
1926.21Construction Safety Training8%Yes
1926.1053Ladder Safety6%Yes
1926.100Hard Hats4%
1926.1153Silica in Construction3%