Revoli Construction Co., Inc.: OSHA inspection records
Data as of November 16, 2026
$4,699,362initial (proposed) penalties
57 alleged violation items across 1 cited inspection in the last 12 months, including 7 willful, 33 repeat, 17 serious.
Status1 contestedinspection status per the public record
Get Massachusetts alerts- Location
- 152 South Shore Road, South Yarmouth, MA 02664
- Industry
- Construction (NAICS 237110, Utility System Construction)
- Jurisdiction
- Massachusetts, Federal OSHA
- Cited inspections
- 1 in the last 12 months
- Inspection history
- Inspected 2 times since 2024; 2 of those inspections had citations; 40 alleged willful or repeat items on record.
Alleged violations. Citations issued by federal OSHA. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
Inspection 348599432
Contested Under contest; not a final finding. Items and penalties may change.
- Opened
- November 19, 2025
- Citations issued
- March 31, 2026
- Abatement due
- April 28, 2026 (per OSHA record)
- Contest date
- April 1, 2026 (per OSHA record)
- Official record
- osha.gov inspection detail #348599432 · OSHA Establishment Search (if osha.gov shows its homepage, search inspection 348599432)
| Citation | Standard | Type | Issued | Abatement due | Initial penalty | Current penalty | Status |
|---|---|---|---|---|---|---|---|
| Citation 01001 | 1926.21(b)(2) Construction Safety Training | Serious | Mar 31, 2026 | Apr 28, 2026 | $16,550 | $16,550 | Contested |
| Citation 01002 | 1926.251(a)(2)(i) Rigging Equipment | Serious | Mar 31, 2026 | Apr 28, 2026 | $14,188 | $14,188 | Contested |
| Citation 01003 | 1926.416(a)(1) Electrical Work Practices | Serious | Mar 31, 2026 | Apr 28, 2026 | $14,188 | $14,188 | Contested |
| Citation 01004 | 1926.501(a)(2) Fall Protection | Serious | Mar 31, 2026 | Apr 28, 2026 | $16,550 | $16,550 | Contested |
| Citation 01005 | 1926.501(b)(15) Fall Protection | Serious | Mar 31, 2026 | Apr 28, 2026 | $16,550 | $16,550 | Contested |
| Citation 01006 | 1926.600(a)(6)(i) Construction Equipment | Serious | Mar 31, 2026 | Apr 28, 2026 | $16,550 | $16,550 | Contested |
| Citation 01007 | 1926.651(b)(4) Excavation Safety | Serious | Mar 31, 2026 | Apr 28, 2026 | $14,188 | $14,188 | Contested |
| Citation 01008 | 1926.651(i)(3) Excavation Safety | Serious | Mar 31, 2026 | Apr 28, 2026 | $14,188 | $14,188 | Contested |
| Citation 01009 | 1926.651(j)(2) Excavation Safety | Serious | Mar 31, 2026 | Apr 28, 2026 | $16,550 | $16,550 | Contested |
| Citation 01010 | 1926.652(c)(3)(i) Trench Cave-In Protection | Serious | Mar 31, 2026 | Apr 28, 2026 | $16,550 | $16,550 | Contested |
| Citation 01011 | 1926.652(c)(4)(i) Trench Cave-In Protection | Serious | Mar 31, 2026 | Apr 28, 2026 | $16,550 | $16,550 | Contested |
| Citation 01012 | 1926.652(d)(1) Trench Cave-In Protection | Serious | Mar 31, 2026 | Apr 28, 2026 | $16,550 | $16,550 | Contested |
| Citation 01013 | 1926.652(e)(1)(ii) Trench Cave-In Protection | Serious | Mar 31, 2026 | Apr 28, 2026 | $16,550 | $16,550 | Contested |
| Citation 01014 | 1926.652(g)(2) Trench Cave-In Protection | Serious | Mar 31, 2026 | Apr 28, 2026 | $16,550 | $16,550 | Contested |
| Citation 01015 | 1926.1053(b)(1) Ladder Safety | Serious | Mar 31, 2026 | Apr 28, 2026 | $16,550 | $16,550 | Contested |
| Citation 01016 | 1926.1053(b)(16) Ladder Safety | Serious | Mar 31, 2026 | Apr 28, 2026 | $16,550 | $16,550 | Contested |
| Citation 01017 | 1926.1060(a) Ladder and Stair Training | Serious | Mar 31, 2026 | Apr 28, 2026 | $8,512 | $8,512 | Contested |
| Citation 02001 | 1926.501(a)(2) Fall Protection | Willful | Mar 31, 2026 | Apr 28, 2026 | $165,514 | $165,514 | Contested |
| Citation 02002 | 1926.651(c)(2) Excavation Safety | Willful | Mar 31, 2026 | Apr 28, 2026 | $165,514 | $165,514 | Contested |
| Citation 02003 | 1926.651(c)(2) Excavation Safety | Willful | Mar 31, 2026 | Apr 28, 2026 | $165,514 | $165,514 | Contested |
| Citation 02004 | 1926.651(j)(2) Excavation Safety | Willful | Mar 31, 2026 | Apr 28, 2026 | $165,514 | $165,514 | Contested |
| Citation 02005 | 1926.652(c)(3) Trench Cave-In Protection | Willful | Mar 31, 2026 | Apr 28, 2026 | $165,514 | $165,514 | Contested |
| Citation 02006 | 1926.652(a)(1) Trench Cave-In Protection | Willful | Mar 31, 2026 | Apr 28, 2026 | $165,514 | $165,514 | Contested |
| Citation 02007 | 1926.652(c)(4) Trench Cave-In Protection | Willful | Mar 31, 2026 | Apr 28, 2026 | $165,514 | $165,514 | Contested |
| Citation 03001 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03002 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03003 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03004 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03005 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03006 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03007 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03008 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03009 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03010 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03011 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03012 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03013 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03014 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03015 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03016 | 1926.651(c)(2) Excavation Safety | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03017 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03018 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03019 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03020 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03021 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03022 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03023 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03024 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03025 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03026 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03027 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03028 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03029 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03030 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03031 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03032 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
| Citation 03033 | 1926.652(a)(1) Trench Cave-In Protection | Repeat | Mar 31, 2026 | Apr 28, 2026 | $99,300 | $99,300 | Contested |
Inspection history since 2024
OSHA recorded 2 inspections at this establishment name and ZIP code since 2024, the most recent opened Nov 19, 2025. 2 of them had citations. 1 earlier inspection with citations opened in the five years before the most recent one; OSHA's repeat classification generally looks back five years.
Inspections opened per year. Same establishment name and ZIP code in DOL's full inspection history; different spellings or addresses of one business are not joined.
| Inspection | Opened | Alleged items | Initial penalty | Source |
|---|---|---|---|---|
| Inspection 348599432 | Nov 19, 2025 | 57 (40 willful or repeat) | $4,699,362 | osha.gov #348599432 |
| Inspection 347946873 | Dec 20, 2024 | 1 | $11,585 | osha.gov #347946873 |
Compared with similar employers
Among 14 other Utility System Construction (NAICS 2371) establishments in Massachusetts with citations issued in the last 12 months, this establishment's proposed penalties ($4,699,362) were higher than 100% of them, and its 57 alleged items more than 100%.
| Last 12 months | This establishment | Peer median | Higher than |
|---|---|---|---|
| Initial (proposed) penalties | $4,699,362 | $11,916 | 100% |
| Alleged violation items | 57 | 1 | 100% |
Standards cited most in this industry
Share of the 553 cited inspections in Utility System Construction (NAICS 2371) nationwide (last 12 months) that included each standard; the ones marked were also cited here.
| Standard | Topic | Share of inspections | Cited here |
|---|---|---|---|
| 1926.652 | Trench Cave-In Protection | 37% | Yes |
| 1926.651 | Excavation Safety | 30% | Yes |
| 1926.21 | Construction Safety Training | 8% | Yes |
| 1926.1053 | Ladder Safety | 6% | Yes |
| 1926.100 | Hard Hats | 4% | |
| 1926.1153 | Silica in Construction | 3% |
Other construction employers cited in Massachusetts
- RDC Services Inc.South Yarmouth, issued May 11, 2026, $9,646 initial (proposed)
- Hector's Construction, Inc.Methuen, issued Oct 7, 2026, $29,836 initial (proposed)
- Ray Services Inc.Lawrence, issued Oct 6, 2026, $105,929 initial (proposed)
- Power Home Remodeling Group, LLCMethuen, issued Oct 1, 2026, $99,300 initial (proposed)
- Caetano's Concrete Inc.East Boston, issued Sep 24, 2026, $70,178 initial (proposed)
- Scher Framing Construction, Inc.Hyde Park, issued Sep 23, 2026, $39,720 initial (proposed)
Related
- Massachusetts OSHA citations
- Massachusetts construction citations
- 1926.501 Fall Protection
- 1926.1053 Ladder Safety
- 1926.652 Trench Cave-In Protection
- 1926.651 Excavation Safety
- 1926.21 Construction Safety Training
- 1926.1060 Ladder and Stair Training
Is something on this page wrong or out of date? Request a correction or removal.