Ridgeline Utilities LLC: OSHA inspection records
Data as of November 16, 2026
$5,508initial (proposed) penalties
2 alleged violation items across 1 cited inspection in the last 12 months, including 2 serious.
Status1 final orderinspection status per the public record
Get Washington alerts- Location
- Fare And Broadway, Spokane, WA 99216
- Industry
- Construction (NAICS 237130, Utility System Construction)
- Jurisdiction
- Washington, State plan
- Cited inspections
- 1 in the last 12 months
Alleged violations. Citations issued by a State Plan office. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
Inspection 348708892
Final order The citation items have become a final order.
- Opened
- December 16, 2025
- Citations issued
- May 28, 2026
- Final order date
- May 28, 2026 (per OSHA record)
- Official record
- osha.gov inspection detail #348708892 · OSHA Establishment Search (if osha.gov shows its homepage, search inspection 348708892)
| Citation | Standard | Type | Issued | Abatement due | Initial penalty | Current penalty | Status |
|---|---|---|---|---|---|---|---|
| Citation 01001 | 296-32-23516(1)(C) | Serious | May 28, 2026 | — | $1,836 | $1,836 | Final order |
| Citation 01002 | 296-32-23516(1)(A) | Serious | May 28, 2026 | — | $3,672 | $3,672 | Final order |
Compared with similar employers
Among 34 other Utility System Construction (NAICS 2371) establishments in Washington with citations issued in the last 12 months, this establishment's proposed penalties ($5,508) were higher than 82% of them, and its 2 alleged items more than 41%.
| Last 12 months | This establishment | Peer median | Higher than |
|---|---|---|---|
| Initial (proposed) penalties | $5,508 | $856 | 82% |
| Alleged violation items | 2 | 2 | 41% |
Standards cited most in this industry
Share of the 553 cited inspections in Utility System Construction (NAICS 2371) nationwide (last 12 months) that included each standard.
| Standard | Topic | Share of inspections | Cited here |
|---|---|---|---|
| 1926.652 | Trench Cave-In Protection | 37% | |
| 1926.651 | Excavation Safety | 30% | |
| 1926.21 | Construction Safety Training | 8% | |
| 1926.1053 | Ladder Safety | 6% | |
| 1926.100 | Hard Hats | 4% | |
| 1926.1153 | Silica in Construction | 3% |
Other construction employers cited in Washington
- Phoenix RoofingllcSpokane, issued Sep 23, 2026, $9,416 initial (proposed)
- AH Escobar LLCSpokane, issued Jun 25, 2026, $11,556 initial (proposed)
- First Rate Roofing Services LLCSpokane, issued Jun 10, 2026, $6,420 initial (proposed)
- Rocky Mountain Roofing LLCSpokane, issued Jun 5, 2026, $6,820 initial (proposed)
- Scce Construction LLCSpokane, issued May 19, 2026, $9,188 initial (proposed)
- Avey Construction Group LLCSpokane, issued May 8, 2026, $48,840 initial (proposed)
Related
Is something on this page wrong or out of date? Request a correction or removal.