Safeguard Sealcoating: OSHA inspection records
Data as of November 16, 2026
$2,838initial (proposed) penalties, $1,961 current
3 alleged violation items across 1 cited inspection in the last 12 months, including 3 serious.
Status1 informal settlementinspection status per the public record
Get Illinois alerts- Location
- 600 Riley Ln, Lake Zurich, IL 60047
- Industry
- Construction (NAICS 238990, Other Specialty Trade Contractors)
- Jurisdiction
- Illinois, Federal OSHA
- Cited inspections
- 1 in the last 12 months
Alleged violations. Citations issued by federal OSHA. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
Inspection 349068684
Informal settlement Resolved through an informal settlement agreement.
- Opened
- July 23, 2026
- Citations issued
- September 21, 2026
- Abatement due
- October 23, 2026 (per OSHA record)
- Final order date
- October 30, 2026 (per OSHA record)
- Official record
- osha.gov inspection detail #349068684 · OSHA Establishment Search (if osha.gov shows its homepage, search inspection 349068684)
| Citation | Standard | Type | Issued | Abatement due | Initial penalty | Current penalty | Status |
|---|---|---|---|---|---|---|---|
| Citation 01001A | 1926.1153(c)(1) Silica in Construction | Serious | Sep 21, 2026 | — | $2,838 | $1,961 | Informal settlement |
| Citation 01001B | 1926.1153(d)(2)(i) Silica in Construction | Serious | Sep 21, 2026 | — | $0 | $0 | Informal settlement |
| Citation 01001C | 1926.1153(g)(1) Silica in Construction | Serious | Sep 21, 2026 | Oct 23, 2026 | $0 | $0 | Informal settlement |
Compared with similar employers
Among 12 other Other Specialty Trade Contractors (NAICS 2389) establishments in Illinois with citations issued in the last 12 months, this establishment's proposed penalties ($2,838) were higher than 0% of them, and its 3 alleged items more than 25%.
| Last 12 months | This establishment | Peer median | Higher than |
|---|---|---|---|
| Initial (proposed) penalties | $2,838 | $9,080 | 0% |
| Alleged violation items | 3 | 5 | 25% |
Standards cited most in this industry
Share of the 807 cited inspections in Other Specialty Trade Contractors (NAICS 2389) nationwide (last 12 months) that included each standard.
| Standard | Topic | Share of inspections | Cited here |
|---|---|---|---|
| 1926.652 | Trench Cave-In Protection | 13% | |
| 1926.651 | Excavation Safety | 12% | |
| 1926.501 | Fall Protection | 8% | |
| 1926.21 | Construction Safety Training | 6% | |
| 1910.1200 | Hazard Communication | 6% | |
| 1926.100 | Hard Hats | 5% |
Other construction employers cited in Illinois
- THS of Wauconda IL LLC dba Gleason Plumbing, Heating and Air ConditioningLake Zurich, issued Jan 15, 2026, $32,724 initial (proposed)
- Raptor Exteriors, Inc.Tinley Park, issued Oct 14, 2026, $80,492 initial (proposed)
- Hernan Garcia Campos LLCTinley Park, issued Oct 8, 2026, $30,056 initial (proposed)
- Nuevo Despertar ConstructionArlington Heights, issued Oct 2, 2026, $16,172 initial (proposed)
- Joseph Birkenheier Tuckpointing and Masonry, Inc.Glencoe, issued Oct 1, 2026, $12,768 initial (proposed)
- C&G General Construction Inc.Deerfield, issued Oct 1, 2026, $33,197 initial (proposed)
Related
Is something on this page wrong or out of date? Request a correction or removal.