1926.703 Formwork and Shoring: citations, penalties and recently cited employers
Data as of November 16, 2026 · citations issued Nov 16, 2025 to Nov 16, 2026
Formwork for cast-in-place concrete must be designed, built, and maintained to support all vertical and lateral loads expected during placement. Drawings or plans for formwork and shoring must be kept on the jobsite, and shoring must be inspected before and during concrete placement. Forms and shores may not be removed until the concrete has gained enough strength to support its own weight and other loads.
OSHA often groups related violations into one citation (items such as 01002A and 01002B) and records the group's penalty on one item, sometimes under another standard. The medians count each citation with an item under 1926.703 once, at the group's combined penalty.
What the standard requires
- Design formwork to support all anticipated loads
- Keep formwork and shoring drawings available on site
- Inspect shoring before, during, and after concrete placement
- Remove forms and shores only after concrete reaches adequate strength
Hazards it addresses
- Formwork collapse during pours
- Workers crushed by failing shores
- Premature stripping causing structural failure
Cited on commercial and infrastructure projects with elevated slabs, walls, and columns.
Plain-language summary written for this site; it is not the regulatory text and not legal advice. Read the official text at eCFR.
Citations by month
Inspections with citations issued, by month of issuance. Hatched months are incomplete: citations reach the public data about a month after issuance.
Most-cited paragraphs
| Paragraph | What it covers | Items | Inspections | Median proposed penalty per citation |
|---|---|---|---|---|
| 1926.703(a)(1) | Formwork must be designed, fabricated, erected, braced, and maintained to support all vertical and lateral loads. | 13 | 13 | $6,621 |
| 1926.703(b)(6) | Shoring and reshoring requirements, including inspection of shoring equipment. | 3 | 3 | $5,740 |
| 1926.703(d)(1) | 2 | 2 | $8,275 | |
| 1926.703(a)(2) | Drawings or plans for formwork and shoring must be available at the jobsite. | 1 | 1 | $2,838 |
| 1926.703(b)(8)(i) | Shoring and reshoring requirements, including inspection of shoring equipment. | 1 | 1 | $16,550 |
| 1926.703(b)(8)(iv) | Shoring and reshoring requirements, including inspection of shoring equipment. | 1 | 1 | $16,550 |
Penalties
Across 21 alleged items, OSHA and state-plan offices proposed $181,391 in initial penalties. The current total in the public data is $160,571, 11% lower after settlements, contests and amendments.
By violation type: Serious 100%.
Trends and abatement
From December 2025 to August 2026 (months with complete data), 10 inspections citing 1926.703 had citations first issued.
Penalty distribution
Half of the initial (proposed) penalties per citation (grouped items combined) were $6,460 or less; a quarter were above $16,550, and one in ten above $16,550.
| Initial (proposed) penalty per citation (grouped items combined) | Count | Share |
|---|---|---|
| Under $1,000 | 0 | 0% |
| $1,000 to $4,999 | 7 | 35% |
| $5,000 to $14,999 | 7 | 35% |
| $15,000 to $49,999 | 6 | 30% |
| $50,000 or more | 0 | 0% |
Industries cited most under 1926.703
| Industry (NAICS) | Cited inspections | Share |
|---|---|---|
| Foundation, Structure, and Building Exterior Contractors 2381 | 11 | 65% |
| Nonresidential Building Construction 2362 | 2 | 12% |
| Residential Building Construction 2361 | 1 | 6% |
| Highway, Street, and Bridge Construction 2373 | 1 | 6% |
| Other Heavy and Civil Engineering Construction 2379 | 1 | 6% |
| Forging and Stamping 3321 | 1 | 6% |
Citations by state
| State | Inspections cited | Items | Initial penalties | Current penalties |
|---|---|---|---|---|
| New York | 6 | 9 | $87,210 | $85,555 |
| Florida | 5 | 6 | $44,140 | $33,568 |
| New Jersey | 2 | 2 | $12,106 | $11,268 |
| Kentucky | 1 | 1 | $6,300 | $3,780 |
| Massachusetts | 1 | 1 | $11,585 | $8,100 |
| Texas | 1 | 1 | $16,550 | $16,550 |
| Utah | 1 | 1 | $3,500 | $1,750 |
By industry
- Construction: 16 inspections
- Manufacturing: 1 inspections
Recently cited establishments
Alleged violations. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
| Establishment | Location | Issued | Alleged items | Initial penalty | Current penalty | Status and deadlines | Source |
|---|---|---|---|---|---|---|---|
| Thomas Johnson Inc. | Amherst, NY | Sep 16, 2026 | 1 | $2,979 | $2,979 | ContestedContested Sep 24, 2026 | osha.gov #348954207 |
| Industrial Welding & Fabricating Co. | Amherst, NY | Sep 16, 2026 | 1 | $6,621 | $4,966 | Informal settlement | osha.gov #348954108 |
| Brawdy Construction Inc. | Amherst, NY | Sep 16, 2026 | 1 | $6,207 | $6,207 | ContestedContested Sep 25, 2026 | osha.gov #348954041 |
| Turner Construction Company | Amherst, NY | Sep 16, 2026 | 1 | $11,823 | $11,823 | ContestedContested Sep 24, 2026 | osha.gov #348953951 |
| K N M Constructions Corp. | Hialeah, FL | Sep 3, 2026 | 1 | $5,740 | $3,444 | Informal settlementAbatement due Sep 30, 2026 | osha.gov #349123745 |
| South Pointe Construction & Development Co. | Hialeah, FL | Sep 3, 2026 | 1 | $2,460 | $2,460 | OpenAbatement due Sep 30, 2026Contest deadline ~Sep 25, 2026 (est.) | osha.gov #348797481 |
| Baker Concrete Construction Inc. | West Palm Beach, FL | Aug 19, 2026 | 2 | $16,552 | $8,276 | Informal settlement | osha.gov #348756305 |
| Regis Steel Corp. | Methuen, MA | Aug 19, 2026 | 1 | $11,585 | $8,100 | Informal settlementAbatement due Oct 6, 2026 | osha.gov #348969601 |
| Pro CA-SA Construction Corp. | Brooklyn, NY | Jul 29, 2026 | 2 | $9,930 | $9,930 | ContestedAbatement due Aug 10, 2026Contested Sep 9, 2026 | osha.gov #348755893 |
| Archer Western - DE Moya Joint Venture | Miami, FL | Jul 14, 2026 | 1 | $16,550 | $16,550 | Informal settlementAbatement due Aug 21, 2026 | osha.gov #348695354 |
| Kmi, Inc. | Brooklyn, NY | Apr 27, 2026 | 3 | $49,650 | $49,650 | ContestedAbatement due May 7, 2026Contested May 15, 2026 | osha.gov #348572736 |
| Southland Contracting Inc. | Dallas, TX | Mar 30, 2026 | 1 | $16,550 | $16,550 | Informal settlementAbatement due Apr 23, 2026 | osha.gov #348539198 |
| Roy Rock Masonry and Concrete, LLC | Nutley, NJ | Feb 27, 2026 | 1 | $9,268 | $9,268 | ContestedContested Mar 31, 2026 | osha.gov #348470576 |
| Precon Corporation | Hatton, KY | Feb 3, 2026 | 1 | $6,300 | $3,780 | Informal settlementAbatement due Feb 9, 2026 | osha.gov #348586058 |
| Blanco Concrete Construction LLC | Delray Beach, FL | Jan 30, 2026 | 1 | $2,838 | $2,838 | Final orderAbatement due Feb 26, 2026 | osha.gov #348588567 |
| Climb Concrete, LLC | Ogden, UT | Dec 4, 2025 | 1 | $3,500 | $1,750 | Informal settlementAbatement due Dec 31, 2025 | osha.gov #348569146 |
| 440 Elizabeth NJ LLC | Newark, NJ | Jul 24, 2026 | 1 | $2,838 | $2,000 | Informal settlementAbatement due Jan 16, 2026 | osha.gov #348280876 |
Notable employers cited under 1926.703
Largest proposed penalties under 1926.703 in the last 12 months (items under this standard only), among establishments with a detailed history page. Alleged violations; see each page for status and current penalty.
- Baker Concrete Construction Inc.West Palm Beach, FL · $16,552 initial (proposed) · 3 inspections on record
- Roy Rock Masonry and Concrete, LLCNutley, NJ · $9,268 initial (proposed)
- Brawdy Construction Inc.Amherst, NY · $6,207 initial (proposed) · 5 inspections on record
Often cited together
- 1926.1052 Construction Stairways (5 shared inspections)
- 1926.350 Gas Welding and Cutting (3 shared inspections)
- 1926.501 Fall Protection (2 shared inspections)
- 1926.416 Electrical Work Practices (2 shared inspections)
- 1926.503 Fall Protection Training (1 shared inspections)
- 1910.1200 Hazard Communication (1 shared inspections)
- 1926.502 Fall Protection Systems (1 shared inspections)
- 1926.21 Construction Safety Training (1 shared inspections)
Questions
What does OSHA standard 1926.703 require?
Formwork for cast-in-place concrete must be designed, built, and maintained to support all vertical and lateral loads expected during placement. Drawings or plans for formwork and shoring must be kept on the jobsite, and shoring must be inspected before and during concrete placement. Forms and shores may not be removed until the concrete has gained enough strength to support its own weight and other loads.
How often was 1926.703 cited in the last 12 months?
In the public data as of November 16, 2026, 1926.703 (Formwork and Shoring) appeared in 17 inspections with citations issued between Nov 16, 2025 and Nov 16, 2026, covering 21 alleged violation items.
Which part of 1926.703 is cited most?
1926.703(a)(1) was the most-cited paragraph, with 13 items: Formwork must be designed, fabricated, erected, braced, and maintained to support all vertical and lateral loads.
Which states cite 1926.703 most often?
The most citations under 1926.703 in this period were issued in New York, Florida, New Jersey.
What is the typical penalty for a 1926.703 violation?
Counting each citation once, the median initial (proposed) penalty was $6,460 per citation; the median current penalty after settlements and amendments was $5,586. OSHA often groups related violations (items such as 01002A and 01002B) into one citation with one penalty, recorded on one item and sometimes under another standard, so these figures combine the grouped items. Totals for the items under 1926.703: $181,391 proposed, $160,571 current. Penalties vary by violation type, employer size and history, and State Plans set their own amounts.
Are 1926.703 citations final?
Not necessarily. A citation is an allegation until it becomes a final order. 43% of these items were contested, and many others were changed in settlements. Each listing shows its current status and a link to the official record.