FL Group Developments, LLC: OSHA inspection records
Data as of November 16, 2026
$14,754initial (proposed) penalties, $7,377 current
4 alleged violation items across 1 cited inspection in the last 12 months, including 4 serious.
Status1 informal settlementinspection status per the public record
Get Florida alerts- Location
- 2823 N Orange Blossom Trail, Orlando, FL 32804
- Industry
- Construction (NAICS 238220, Building Equipment Contractors)
- Jurisdiction
- Florida, Federal OSHA
- Cited inspections
- 1 in the last 12 months
Alleged violations. Citations issued by federal OSHA. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
Inspection 348824715
Informal settlement Resolved through an informal settlement agreement.
- Opened
- March 19, 2026
- Citations issued
- April 17, 2026
- Final order date
- May 12, 2026 (per OSHA record)
- Official record
- osha.gov inspection detail #348824715 · OSHA Establishment Search (if osha.gov shows its homepage, search inspection 348824715)
| Citation | Standard | Type | Issued | Abatement due | Initial penalty | Current penalty | Status |
|---|---|---|---|---|---|---|---|
| Citation 01001 | 1926.651(c)(2) Excavation Safety | Serious | Apr 17, 2026 | — | $2,838 | $1,419 | Informal settlement |
| Citation 01002A | 1926.651(i)(2)(i) Excavation Safety | Serious | Apr 17, 2026 | — | $3,972 | $1,986 | Informal settlement |
| Citation 01002B | 1926.651(j)(2) Excavation Safety | Serious | Apr 17, 2026 | — | $3,972 | $1,986 | Informal settlement |
| Citation 01003 | 1926.652(a)(1) Trench Cave-In Protection | Serious | Apr 17, 2026 | — | $3,972 | $1,986 | Informal settlement |
Compared with similar employers
Among 40 other Building Equipment Contractors (NAICS 2382) establishments in Florida with citations issued in the last 12 months, this establishment's proposed penalties ($14,754) were higher than 70% of them, and its 4 alleged items more than 98%.
| Last 12 months | This establishment | Peer median | Higher than |
|---|---|---|---|
| Initial (proposed) penalties | $14,754 | $7,944 | 70% |
| Alleged violation items | 4 | 2 | 98% |
Standards cited most in this industry
Share of the 1,195 cited inspections in Building Equipment Contractors (NAICS 2382) nationwide (last 12 months) that included each standard; the ones marked were also cited here.
| Standard | Topic | Share of inspections | Cited here |
|---|---|---|---|
| 1926.501 | Fall Protection | 16% | |
| 1926.1053 | Ladder Safety | 7% | |
| 1926.652 | Trench Cave-In Protection | 5% | Yes |
| 1926.503 | Fall Protection Training | 5% | |
| 1926.405 | Temporary Wiring and Cords | 4% | |
| 1926.651 | Excavation Safety | 4% | Yes |
Other construction employers cited in Florida
- J&Y House Services LLCOrlando, issued Mar 11, 2026, $13,618 initial (proposed)
- Sentry Electric, Inc. of Central FloridaOrlando, issued Jan 23, 2026, $27,804 initial (proposed)
- Fence Direct Inc.Orlando, issued Aug 27, 2026, $19,296 initial (proposed)
- Hodges Brothers Roofing, LLCOrlando, issued Aug 13, 2026, $3,972 initial (proposed)
- DMR Concrete LLCOrlando, issued Aug 7, 2026, $3,405 initial (proposed)
- E Kwane Construction LLCOrlando, issued Jul 7, 2026, $4,540 initial (proposed)
Related
- Florida OSHA citations
- Florida construction citations
- 1926.652 Trench Cave-In Protection
- 1926.651 Excavation Safety
Is something on this page wrong or out of date? Request a correction or removal.