Merino Construction LLC: OSHA inspection records
Data as of November 16, 2026
$26,864initial (proposed) penalties, $21,104 current
7 alleged violation items across 1 cited inspection in the last 12 months, including 2 repeat, 4 serious.
Status1 formal settlementinspection status per the public record
Get Wisconsin alerts- Location
- 110 Retzer View Court, Waukesha, WI 53188
- Industry
- Construction (NAICS 238160, Foundation, Structure, and Building Exterior Contractors)
- Jurisdiction
- Wisconsin, Federal OSHA
- Cited inspections
- 1 in the last 12 months
Alleged violations. Citations issued by federal OSHA. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
Inspection 348686254
Formal settlement Resolved through a formal settlement after a contest.
- Opened
- January 13, 2026
- Citations issued
- January 23, 2026 to March 16, 2026
- Abatement due
- February 19, 2026 to March 20, 2026 (per OSHA record)
- Contest date
- March 31, 2026 (per OSHA record)
- Final order date
- June 11, 2026 (per OSHA record)
- Official record
- osha.gov inspection detail #348686254 · OSHA Establishment Search (if osha.gov shows its homepage, search inspection 348686254)
| Citation | Standard | Type | Issued | Abatement due | Initial penalty | Current penalty | Status |
|---|---|---|---|---|---|---|---|
| Citation 01001 | 1926.102(a)(1) Eye and Face Protection | Serious | Jan 23, 2026 | Feb 19, 2026 | $5,958 | $4,766 | Formal settlement |
| Citation 01002A | 1926.502(d)(10)(i) Fall Protection Systems | Serious | Jan 23, 2026 | — | $5,107 | $4,085 | Formal settlement |
| Citation 01002B | 1926.502(d)(17) Fall Protection Systems | Serious | Jan 23, 2026 | — | $0 | $0 | Formal settlement |
| Citation 01003 | 1926.1053(b)(1) Ladder Safety | Serious | Jan 23, 2026 | — | $3,405 | $2,721 | Formal settlement |
| Citation 02001A | 1926.501(b)(13) Fall Protection | Repeat | Jan 23, 2026 | — | $11,916 | $9,532 | Formal settlement |
| Citation 02001B | 1926.503(a)(1) Fall Protection Training | Repeat | Jan 23, 2026 | Feb 26, 2026 | $0 | $0 | Formal settlement |
| Citation 03001 | 1903.19(d)(1) Abatement Verification | Other-than-serious | Mar 16, 2026 | Mar 20, 2026 | $478 | $0 | Formal settlement |
Compared with similar employers
Among 201 other Foundation, Structure, and Building Exterior Contractors (NAICS 2381) establishments in Wisconsin with citations issued in the last 12 months, this establishment's proposed penalties ($26,864) were higher than 82% of them, and its 7 alleged items more than 93%.
| Last 12 months | This establishment | Peer median | Higher than |
|---|---|---|---|
| Initial (proposed) penalties | $26,864 | $10,467 | 82% |
| Alleged violation items | 7 | 3 | 93% |
Standards cited most in this industry
Share of the 8,181 cited inspections in Foundation, Structure, and Building Exterior Contractors (NAICS 2381) nationwide (last 12 months) that included each standard; the ones marked were also cited here.
| Standard | Topic | Share of inspections | Cited here |
|---|---|---|---|
| 1926.501 | Fall Protection | 61% | Yes |
| 1926.503 | Fall Protection Training | 24% | Yes |
| 1926.1053 | Ladder Safety | 23% | Yes |
| 1926.102 | Eye and Face Protection | 19% | Yes |
| 1926.451 | Scaffold Safety | 11% | |
| 1926.100 | Hard Hats | 9% |
Other construction employers cited in Wisconsin
- Trexx, LLCWaukesha, issued Jan 30, 2026, $44,739 initial (proposed)
- General Exterior Construction Inc., dba Gen-EX ConstructionWaukesha, issued Oct 1, 2026, $18,089 initial (proposed)
- Custom Woodcrafters, Inc.Waukesha, issued Mar 13, 2026, $7,944 initial (proposed)
- Madkat Construction LLCRacine, issued Sep 25, 2026, $17,874 initial (proposed)
- ABP General ConstructionMilwaukee, issued Sep 14, 2026, $34,046 initial (proposed)
- CP Siding & Construction LLCEau Claire, issued Sep 11, 2026, $17,874 initial (proposed)
Related
- Wisconsin OSHA citations
- Wisconsin construction citations
- 1926.501 Fall Protection
- 1926.503 Fall Protection Training
- 1926.1053 Ladder Safety
- 1926.102 Eye and Face Protection
- 1926.502 Fall Protection Systems
- 1903.19 Abatement Verification
Is something on this page wrong or out of date? Request a correction or removal.