Patriot Mechanical, LLC dba Patriot Boiler: OSHA inspection records
Data as of November 16, 2026
$5,674initial (proposed) penalties
4 alleged violation items across 1 cited inspection in the last 12 months, including 2 serious.
Status1 final orderinspection status per the public record
Get Arizona alerts- Location
- 228 West Lodge Drive, Tempe, AZ 85283
- Industry
- Construction (NAICS 238220, Building Equipment Contractors)
- Jurisdiction
- Arizona, State plan
- Cited inspections
- 1 in the last 12 months
Alleged violations. Citations issued by a State Plan office. Citations are allegations with proposed penalties until they become final orders; each record shows its status label, initial and current penalty as of November 16, 2026. About this data · Methodology
Official records: each osha.gov link opens the official record, next to its inspection number. If osha.gov asks you to verify you're human and then shows its homepage, search that number at OSHA's Establishment Search.
Inspection 348667577
Final order The citation items have become a final order.
- Opened
- January 2, 2026
- Citations issued
- May 28, 2026
- Abatement due
- May 31, 2026 (per OSHA record)
- Final order date
- June 24, 2026 (per OSHA record)
- Official record
- osha.gov inspection detail #348667577 · OSHA Establishment Search (if osha.gov shows its homepage, search inspection 348667577)
| Citation | Standard | Type | Issued | Abatement due | Initial penalty | Current penalty | Status |
|---|---|---|---|---|---|---|---|
| Citation 01001 | 1910.178(l)(4)(iii) Forklifts | Serious | May 28, 2026 | May 31, 2026 | $2,837 | $2,837 | Final order |
| Citation 01002 | 1910.178(m)(7) Forklifts | Serious | May 28, 2026 | May 31, 2026 | $2,837 | $2,837 | Final order |
| Citation 02001 | 1910.157(c)(1) Fire Extinguishers | Other-than-serious | May 28, 2026 | May 31, 2026 | $0 | $0 | Final order |
| Citation 02002 | 1910.157(e)(2) Fire Extinguishers | Other-than-serious | May 28, 2026 | May 31, 2026 | $0 | $0 | Final order |
Compared with similar employers
Among 11 other Building Equipment Contractors (NAICS 2382) establishments in Arizona with citations issued in the last 12 months, this establishment's proposed penalties ($5,674) were higher than 45% of them, and its 4 alleged items more than 64%.
| Last 12 months | This establishment | Peer median | Higher than |
|---|---|---|---|
| Initial (proposed) penalties | $5,674 | $5,962 | 45% |
| Alleged violation items | 4 | 3 | 64% |
Standards cited most in this industry
Share of the 1,195 cited inspections in Building Equipment Contractors (NAICS 2382) nationwide (last 12 months) that included each standard.
| Standard | Topic | Share of inspections | Cited here |
|---|---|---|---|
| 1926.501 | Fall Protection | 16% | |
| 1926.1053 | Ladder Safety | 7% | |
| 1926.652 | Trench Cave-In Protection | 5% | |
| 1926.503 | Fall Protection Training | 5% | |
| 1926.405 | Temporary Wiring and Cords | 4% | |
| 1926.651 | Excavation Safety | 4% |
Other construction employers cited in Arizona
- Tierra Dura Construction LLCTempe, issued Sep 24, 2026, $31,170 initial (proposed)
- Straight Arrow Roofing LLCTempe, issued Sep 25, 2026, $10,221 initial (proposed)
- Powerful AC, LLC dba WE the People ACTempe, issued Sep 24, 2026, $12,641 initial (proposed)
- P&R Plumbing Inc.Tempe, issued Jun 24, 2026, $6,250 initial (proposed)
- EZ Roofing Company LLCMesa, issued Aug 13, 2026, $28,847 initial (proposed)
- Dickens Quality Demolition, LLCPhoenix, issued May 28, 2026, $63,846 initial (proposed)
Related
Is something on this page wrong or out of date? Request a correction or removal.